<strong>Technology</strong>/Method Spray - On Lining/Polyurethane<br />

Thickness Range, inches • Film Thickness <strong>of</strong> 80 mils is recommended under NSF 61 listing.<br />

• Practical applications <strong>of</strong> 120 to 200 mils are achieved.<br />

• Actual lining thickness is at the discretion <strong>of</strong> the utility thickness.<br />

Pressure Capacity, psi At 3 mm coating thickness, 145 psi <strong>for</strong> 100 mm pipe diameter.<br />

*Capacity changes with material thickness and pipe diameter<br />

Temperature Range, o C To be stored in the original sealed containers at temperatures between 0°C and<br />

40°C. Copon Hycote 169 HB shall not be applied when substrate/water<br />

temperatures are less than 3°C. Material temperature at the application head is<br />

25-35°C.<br />

Renewal Length, feet 575 feet<br />

Other Notes • Adhesion per<strong>for</strong>mance is 10.2 MPa<br />

• Approved manufacturing facility is in North Yorkshire, UK<br />

Product Standards<br />

III. <strong>Technology</strong> Design, Installation, and QA/QC In<strong>for</strong>mation<br />

NSF 61 approved<br />

DWI approved - UK<br />

Norwegian, Spanish, and Polish Approvals also available<br />

Design Standards Equipment needs special head and cleaning.<br />

Design Life Range 30+ years. Some studies suggest 40-60 years.<br />

Installation Standards • Number <strong>of</strong> Coats: 1<br />

• Maximum Thinner: None<br />

• Cure Time: 30 minutes at 30°C<br />

• Special Comments: Mix ratio <strong>of</strong> A:B is 2.5:1. One hour flush required<br />

prior to being placed into service.<br />

Installation Methodology • Linings <strong>of</strong> 1-5 mm thickness may be applied in a single pass <strong>of</strong> the<br />

application head.<br />

• Cleaning, drying and joint-filling are required.<br />

• One excavation required <strong>for</strong> every 100–150 m approximately.<br />

• Same day return to service <strong>for</strong> every 100–150 m renewal length.<br />

• Disruption <strong>for</strong> around 8 hours.<br />

• Recommended deflection in pipe <strong>of</strong> up to 12 degrees.<br />

• CCTV inspection <strong>of</strong> the coating may be carried out after a minimum cure<br />

period <strong>of</strong> 10 minutes from completion <strong>of</strong> lining.<br />

• The coating shall be allowed to cure <strong>for</strong> a minimum period <strong>of</strong> 60 minutes<br />

after completion <strong>of</strong> lining be<strong>for</strong>e the commencement <strong>of</strong> disinfection and<br />

flushing procedures.<br />

QA/QC • Principles <strong>of</strong> Water Supply Hygiene and Technical Guidance Notes<br />

• Effective control <strong>of</strong> a BS EN ISO 9000 Quality System In-Situ Rapid<br />

Setting Polymeric Lining Operational<br />

• Guidelines and Code <strong>of</strong> Practice: Published by Warren Associates<br />

(Pipelines) Ltd<br />

• Material Safety Data Sheet<br />

IV. Operation and <strong>Main</strong>tenance Requirements<br />

O&M Needs Using a maximum <strong>of</strong> not more than 100 mg/L <strong>of</strong> free chlorine<br />

Repair Requirements <strong>for</strong><br />

Rehabilitated Sections<br />

Leakage detection tests, recoating<br />

V. Costs<br />

Key Cost Factors Lesser storage space required, reduced number <strong>of</strong> pit excavations, universal item<br />

product and does not vary <strong>for</strong> different pipe diameters, all soil to be treated as<br />

contaminated waste, allows use <strong>of</strong> existing pipe rather than exhuming it, smaller<br />

carbon footprint, does not affect external pipe condition, small number <strong>of</strong><br />

resources amounting to reduced contractor risk, lesser time <strong>for</strong> installation site,<br />

tarmac coating required at excavation pits. Contribution to material costs<br />

includes the lining material, equipment, and use <strong>of</strong> existing pipe.<br />

Case Study Costs Approximately 60 Euros in urban areas (2006)<br />

VI. Data Sources<br />

References • http://solutions.3m.com/wps/portal/3M/en_US/Corrosion/Protection/Product<br />

A-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!