09.01.2013 Views

Retrospective Evaluation of Cured-in-Place Pipe - (NEPIS)(EPA ...

Retrospective Evaluation of Cured-in-Place Pipe - (NEPIS)(EPA ...

Retrospective Evaluation of Cured-in-Place Pipe - (NEPIS)(EPA ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Condition assessment us<strong>in</strong>g CCTV was established <strong>in</strong> the 13 major cities <strong>in</strong> 1988, exam<strong>in</strong><strong>in</strong>g 1 to 2% <strong>of</strong><br />

the pipe stock per annum. The condition is assessed <strong>in</strong> accordance with the M<strong>in</strong>istry <strong>of</strong> Land,<br />

Infrastructure and Construction (MLIT) Manual for Construction and Repair <strong>of</strong> Sewerage Facilities.<br />

The manual prescribes a formal assessment system based on po<strong>in</strong>ts assigned to defects which is outl<strong>in</strong>ed<br />

<strong>in</strong> Tables 8-13 and 8-14, provid<strong>in</strong>g a means <strong>of</strong> rank<strong>in</strong>g the urgency <strong>of</strong> rehabilitation. In analyz<strong>in</strong>g various<br />

sewer lengths, the total po<strong>in</strong>ts score per span gives rise to a rank<strong>in</strong>g from C to AAA, which determ<strong>in</strong>es<br />

the action to be taken. Recommended action may require po<strong>in</strong>t repair or rehabilitation <strong>of</strong> the full span. It<br />

is usual to rehabilitate the whole span <strong>in</strong> the event <strong>of</strong> more than four defects <strong>in</strong> a s<strong>in</strong>gle span. Short length<br />

rehabilitation or repair may be considered for one to four defects per span.<br />

Table 8-13. JSWA Condition Assessment Method<br />

Type Symptom Severity Pts Severity Pts Severity Pts<br />

1 Corrosion Exposed Rebar 20 Exposed Aggregate 15 Other<br />

Corrosion<br />

8<br />

1 <strong>Pipe</strong> Broken Fracture Collapse 20 Thru-wall crack 16 Other<br />

breakage<br />

10<br />

1 Jo<strong>in</strong>t Displacement Withdrawn <strong>of</strong>fset 18 Partial withdrawal 15 Jo<strong>in</strong>t gap 3<br />

1 Root <strong>in</strong>trusion 40% block 20 10-40% block 10 33% dia. 20 10-33% dia 15 < 10% 8<br />

2 Cracks > 5mm 15 2-5mm 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!