The direct costs for the city preparation activities and the contractor site work for the two retrospective<br />

evaluations <strong>in</strong> Denver are approximately identified as <strong>in</strong>dicated <strong>in</strong> Table 7-1.<br />

Table 7-1. Field Work Costs for Sample Retrieval <strong>in</strong> Denver<br />

Site/Cost Item Cost<br />

Cost for Excavation and Removal <strong>of</strong> 8-<strong>in</strong>. Clay Sewer <strong>Pipe</strong> at<br />

1st Ave. and Monroe Alley $ 22,800<br />

Cost for Sample Retrieval and Patch<strong>in</strong>g for 48 <strong>in</strong>. brick sewer $ 1,600<br />

Total Cost $ 24,400<br />

7.2.2 City <strong>of</strong> Columbus Costs. The discussions with the City <strong>of</strong> Columbus began with an<br />

expression <strong>of</strong> <strong>in</strong>terest by the City at the TTC Industry Advisory Board meet<strong>in</strong>g <strong>in</strong> October 2009. Followup<br />

discussions were held by phone and email <strong>in</strong> the w<strong>in</strong>ter 2009-2010 and a plann<strong>in</strong>g meet<strong>in</strong>g was held <strong>in</strong><br />

Columbus on February 16, 2010. The sites were chosen to select a 36-<strong>in</strong>. diameter, 21-year old l<strong>in</strong>ed pipe<br />

for CIPP sample retrieval only and to retrieve a host pipe plus CIPP l<strong>in</strong>er from a 5-year old, 8-<strong>in</strong>. sewer<br />

l<strong>in</strong>e that was be<strong>in</strong>g replaced because the l<strong>in</strong>e needed to be upsized. The pr<strong>in</strong>cipal reason for select<strong>in</strong>g a<br />

relatively newly rel<strong>in</strong>ed pipe for <strong>in</strong>clusion was that the city could not absorb the cost <strong>of</strong> a separate dig-up<br />

and replace just for the retrospective study. The direct costs for the city for the two retrospective<br />

evaluations <strong>in</strong> Columbus are shown <strong>in</strong> Table 7-2.<br />

Table 7-2. City <strong>of</strong> Columbus Costs<br />

Site / Cost Item Cost<br />

Pay item for Richards Rd – Open Cut Open Cut Po<strong>in</strong>t<br />

Repair, 8 <strong>in</strong>.-12 <strong>in</strong>. Depth