Thai Solar Future Co., Ltd. Expert of Solar Cell Systems for Future of ...

Thai Solar Future Co., Ltd. Expert of Solar Cell Systems for Future of ... Thai Solar Future Co., Ltd. Expert of Solar Cell Systems for Future of ...

eeas.europa.eu
from eeas.europa.eu More from this publisher
08.01.2013 Views

Thai Solar Future Co., Ltd. Expert of Solar Cell Systems for Future of Thailand www.thaisolarfuture.com October , 2012 Thai Solar Future Company Limited 1. Established and managed by Professor Dr. Dusit Kruangam who is a former professor of electrical engineering at Chulalongkorn university, outstanding researcher, worldwide reputation on PV, experience on solar photovoltaics more than 25 years. Total installation record is more 24 MWp. 2. Type of Business: � PV system integrators, design and construction of PV systems (grids/off grids/solar farm) both domestic and international, � Utilization of high quality crystalline silicon solar modules , long life more than 30 years , IEC 61215, IEC 61730 (Safety Class II), � Utilization of high quality amorphous silicon thin film solar modules, long life more than 30 years, IEC 61464, IEC 61730 (Safety Class II), � Sales of solar modules, �� Total solution services including feasibility study study, power plant construction construction, engineering procurement and construction (EPC), coordination with government agencies, after services, etc. 08/10/55 1

<strong>Thai</strong> <strong>Solar</strong> <strong>Future</strong> <strong>Co</strong>., <strong>Ltd</strong>.<br />

<strong>Expert</strong> <strong>of</strong> <strong>Solar</strong> <strong>Cell</strong> <strong>Systems</strong> <strong>for</strong> <strong>Future</strong> <strong>of</strong> <strong>Thai</strong>land<br />

www.thaisolarfuture.com<br />

October , 2012<br />

<strong>Thai</strong> <strong>Solar</strong> <strong>Future</strong> <strong>Co</strong>mpany Limited<br />

1. Established and managed by Pr<strong>of</strong>essor Dr. Dusit Kruangam who is a <strong>for</strong>mer<br />

pr<strong>of</strong>essor <strong>of</strong> electrical engineering at Chulalongkorn university, outstanding<br />

researcher, worldwide reputation on PV, experience on solar photovoltaics more<br />

than 25 years. Total installation record is more 24 MWp.<br />

2. Type <strong>of</strong> Business:<br />

� PV system integrators, design and construction <strong>of</strong> PV systems (grids/<strong>of</strong>f<br />

grids/solar farm) both domestic and international,<br />

� Utilization <strong>of</strong> high quality crystalline silicon solar modules , long life more than<br />

30 years , IEC 61215, IEC 61730 (Safety Class II),<br />

� Utilization <strong>of</strong> high quality amorphous silicon thin film solar modules, long life<br />

more than 30 years, IEC 61464, IEC 61730 (Safety Class II),<br />

� Sales <strong>of</strong> solar modules,<br />

�� Total solution services including feasibility study study, power plant construction<br />

construction,<br />

engineering procurement and construction (EPC), coordination with<br />

government agencies, after services, etc.<br />

08/10/55<br />

1


CV <strong>of</strong> Pr<strong>of</strong>essor Dr. Dusit Kruangam<br />

Founder and Managing Director <strong>of</strong> <strong>Thai</strong> <strong>Solar</strong> <strong>Future</strong> <strong>Co</strong>., <strong>Ltd</strong>.<br />

•1988 Ph.D. <strong>of</strong> Electrical Engineering (<strong>Solar</strong> <strong>Cell</strong>s),<br />

Osaka University, Japan.<br />

•1988-2005 1988 2005 Pr<strong>of</strong>essor at Chulalongkorn University.<br />

•2004 Out Standing Researcher <strong>of</strong> Engineering, National Research <strong>Co</strong>uncil <strong>of</strong><br />

<strong>Thai</strong>land.<br />

•2005-2009 Board member and executive <strong>of</strong> solar companies (<strong>Solar</strong>tron,<br />

Ekarat <strong>Solar</strong>).<br />

•Worldclass designer g and installer <strong>of</strong> PV solar systems y more than 10 MW<br />

including MW solar farms, solar ro<strong>of</strong>s, stand alone systems.<br />

• Holding 2 USA Patents.<br />

•Board member <strong>of</strong> several institutes (Rajamangala University <strong>of</strong> Technology<br />

Srivichaya, Renewable Energy Club <strong>of</strong> FTI, Founder <strong>of</strong> <strong>Thai</strong> Photovoltaic<br />

Industries Association).<br />

<strong>Solar</strong> Modules<br />

Products<br />

Small Inverters<br />

Charging h i <strong>Co</strong>ntrollers ll<br />

+ BOS Batteries<br />

Pumps<br />

Large Inverters<br />

Stand Alone / Off-Grid <strong>Systems</strong> On-Grid <strong>Systems</strong><br />

08/10/55<br />

2


Installation <strong>of</strong> High Quality PV <strong>Solar</strong> Modules from World Class Manufacturers.<br />

China Germany Japan Korea Spain Taiwan <strong>Thai</strong>land USA<br />

<strong>Solar</strong> Applications<br />

Grid System: Do not use Battery<br />

Off Grid System: y Use battery y<br />

Unit <strong>of</strong> Power: watt (W),<br />

kilowatt (kW) = 1,000 (W),<br />

megawatt (MW) = 1,000,000 (W)<br />

Unit <strong>of</strong> Electricity lectricity Energy: nergy:<br />

kilowatthour (kWh)<br />

In <strong>Thai</strong>land,<br />

A solar system 1 kilowatt (kW) can generate electricity energy<br />

average 3.8‐4.2 kWh per day.<br />

08/10/55<br />

3


<strong>Solar</strong> Ro<strong>of</strong> on Residential Buildings<br />

Leader <strong>of</strong><br />

Designs <strong>of</strong> <strong>Solar</strong> <strong>Cell</strong> <strong>Systems</strong><br />

2.0 kWp, Dr. Dusit Kruangam, Bangkok. (2009) 3.2 kWp, Ms. Wanna Siriwong, Hadyai. (2010)<br />

2.0 kWp, Dr. Pirom, Bangkok. (2010)<br />

3.6 kWp, Khunying Sompong<br />

Wanissorn, Bangkok. (2010) (Adder)<br />

08/10/55<br />

4


1.2 kWp, Ms. Sirima Nilrat, Hadyai. (2010)<br />

3.6 kWp, Ms. Marisa Soratja, Ladawan Rangsit,<br />

Pathumthanee. (2010)<br />

3.6 kWp, Mr. Danaithorn, Songkhla. (2010) 3.6 kWp, Mr. Montri Uwanno, Hadyai. (2010)<br />

2.0 kWp, Ms. Pachongchit, Bangkok. (2010)<br />

3.6 kWp, Dr. Wissanu Kruangam, Bangkok (2012)<br />

2.3 kWp, Mr. Issara, Kanda Real Estate, Samutsakorn (2012)<br />

08/10/55<br />

5


<strong>Solar</strong> Ro<strong>of</strong> on <strong>Co</strong>mmercial Buildings<br />

330 kWp, Energy <strong>Co</strong>mplex, Bangkok. (2009)<br />

<strong>Solar</strong> Ro<strong>of</strong> on <strong>Co</strong>mmercial Buildings<br />

130 kWp kWp, Central World Plaza, Plaza Bangkok. Bangkok (2011)<br />

08/10/55<br />

6


<strong>Solar</strong> Ro<strong>of</strong> on <strong>Co</strong>mmercial Building<br />

240 kWp, IKEA Store, Mega Bangna, Bangkok. (2011)<br />

330 kWp, TESCO LOTUS, Talad Bangphra, Sriracha, Cholburi.<br />

(<strong>Co</strong>nstruction Period Sep‐Dec 2011)<br />

08/10/55<br />

7


330 kWp, TESCO LOTUS, Talad Bangphra, Sriracha,<br />

Cholburi. (<strong>Co</strong>nstruction Period Sep‐Dec 2011)<br />

6.6 kWp, Thanya Shopping Park, Bangkok. (2012)<br />

08/10/55<br />

8


<strong>Solar</strong> Ro<strong>of</strong> on <strong>Co</strong>mmercial Building<br />

10 kWp, Her Royal Higness Princess Sirindhorn ,<br />

Herb Garden, Rayong Province. (2010)<br />

6.7 kWp, Sky Park Hotel, Hadyai. (2010)<br />

<strong>Solar</strong> Ro<strong>of</strong> on <strong>Co</strong>mmercial Buildings<br />

0.8 kWp, Siam <strong>Co</strong>ntainers. Samutprakran. (2010) 2.86 kWp, <strong>Thai</strong> Ceramic Industry, Saraburi. (2010)<br />

11 kWp, <strong>Co</strong>nsumer Foundation, Bangkok. (2011) 6 kWp, Chao Praya Hospital, Bangkok. (2011)<br />

08/10/55<br />

9


<strong>Solar</strong> Ro<strong>of</strong> on <strong>Co</strong>mmercial Buildings<br />

64 kWp, Sharp Appliances (<strong>Thai</strong>land) <strong>Co</strong>., <strong>Ltd</strong>., Bangna‐Trad Road, km 37, Chasengsao. (2011)<br />

<strong>Solar</strong> Ro<strong>of</strong> on <strong>Co</strong>mmercial Buildings<br />

2.3 kWp, Tripetch Isuzu Sales <strong>Co</strong>., <strong>Ltd</strong>., Bangkok. (2011)<br />

2.1 kWp, Green Park, Siam City Cement PCL.,<br />

Saraburi. (2012)<br />

08/10/55<br />

10


<strong>Solar</strong> <strong>Systems</strong> on Ground <strong>for</strong> CSR at Schools<br />

2.6 kWp, Ban Pru Noi School,<br />

Prachuabkirikhan. (2012)<br />

1.2 kWp, Salakpetch School, Ko Chang,<br />

Trad. (2012)<br />

1.0 kWp, Ban Pong Krasang School,<br />

Nakornratchasima . (2012)<br />

<strong>Solar</strong> Ro<strong>of</strong> on <strong>Co</strong>mmercial Buildings<br />

11 kWp, The Prostheses Foundation <strong>of</strong> H.R.H. the Princess Mother, Chiangmai. (2012)<br />

08/10/55<br />

11


25.8 kWp, Ekarat <strong>Solar</strong>, Amata City, Rayong.<br />

(2009)<br />

24 kWp, Thammasart University,<br />

Pathumthani. (2010)<br />

<strong>Solar</strong> Carport<br />

10 kWp, Petchaboon Innovation <strong>Co</strong>., <strong>Ltd</strong>., (2010)<br />

7.5 kWp, Sabic Innovative Plastics <strong>Co</strong>., <strong>Ltd</strong>., Rayong<br />

(2012)<br />

<strong>Solar</strong> Carport<br />

11 kWp, Delta Electronics (<strong>Thai</strong>land) PCL., Samutprakarn. (2011)<br />

08/10/55<br />

12


VSPP kWh Meter<br />

Trans<strong>for</strong>mers<br />

AC Panels<br />

Inverters<br />

AC 22 kV, 3 phase<br />

AC 22 kV, 3 phase<br />

AC 400 V, 3 phase<br />

AC 400 V, 3 phase<br />

DC<br />

PV Modules<br />

MEA, PEA Line, AC 22 kV, 3 phase<br />

Monitoring &<br />

Display<br />

SSystem<br />

<strong>Solar</strong> Farm<br />

0.630 MWp <strong>Solar</strong> Farm, Ekarat Engineering PCL.,Pracheenburee.<br />

(COD done in 2010).<br />

Bangkok<br />

Office<br />

08/10/55<br />

13


0.630 MWp <strong>Solar</strong> Farm, Ekarat Engineering PCL.,Pracheenburee.<br />

(COD done in 2010).<br />

1.65 MWp, <strong>Solar</strong> Park <strong>Co</strong>., <strong>Ltd</strong>., Lopburi.<br />

(COD done in 2011)<br />

08/10/55<br />

14


0.55 MWp x 10 = 5.5 MWp, <strong>Thai</strong> <strong>Solar</strong> Plant Group, Saraburi.<br />

(COD done in 2012)<br />

0.55 MWp x 10 = 5.5 MWp, <strong>Thai</strong> <strong>Solar</strong> Plant Group, Saraburi.<br />

(COD done in 2012)<br />

08/10/55<br />

15


1.0 MWp, Chiangrai North Wood <strong>Co</strong>., <strong>Ltd</strong>. , Lampang.<br />

(COD done in May 2012)<br />

1.0 MWp, PP <strong>Solar</strong> Power <strong>Co</strong>., <strong>Ltd</strong>. , Nonhkhai.<br />

(to COD, End 2012)<br />

08/10/55<br />

16


1.0 kWp <strong>Solar</strong> Powered Clock with Batteries at Chatuchak District<br />

Office, Bangkok. (2012)<br />

System Minigrid<br />

System Minigrid<br />

Size 3.8 kWp<br />

Place Kho Kood, Trad Province,<br />

<strong>Thai</strong>land<br />

08/10/55<br />

17


Street Light 70-120 Wp<br />

<strong>Thai</strong> Pavilion 0.12 kWp<br />

System Syste <strong>Solar</strong> So a Home o e<br />

Size 120 Wp x 3,000 <strong>Systems</strong><br />

Place <strong>Thai</strong>land<br />

Years 2005‐2006<br />

Aerator 0.5 kWp<br />

08/10/55<br />

18


Submersible Pumps<br />

<strong>Solar</strong> Powered water Pumping <strong>Systems</strong> 0.175-1.0 kWp<br />

Some <strong>of</strong> <strong>Thai</strong> <strong>Solar</strong> <strong>Future</strong>’s Customers<br />

08/10/55<br />

19


High Way<br />

to Chen<br />

Wattana<br />

<strong>Co</strong>ntact:<br />

Pr<strong>of</strong>essor Dr. Dusit Kruangam<br />

Managing Director<br />

<strong>Thai</strong> <strong>Solar</strong> <strong>Future</strong> <strong>Co</strong>., <strong>Ltd</strong>.<br />

99/227-228 Tesabansongkhro Road<br />

Ladyao, Chatuchak<br />

Bangkok 10900<br />

<strong>Thai</strong>land.<br />

Phone +66-2-953-9163<br />

Fax: +66-2-953-9167<br />

Mobile Phone +66-85-918-3691<br />

E-Mail: dusit@thaisolarfuture.com<br />

www.thaisolarfuture.com<br />

Prachaachuan<br />

Road<br />

Pong Pet Junction<br />

คลองประปา<br />

Ngam Wong Wan Road<br />

The Mall <strong>Thai</strong> <strong>Solar</strong> <strong>Future</strong> <strong>Co</strong>., <strong>Ltd</strong>.<br />

Junction<br />

Kasemrat Hospital<br />

Prachanukool<br />

Junction<br />

Garden<br />

Get <strong>of</strong>f at<br />

Ratchada<br />

99/227-228 Tesa Ban Songkhro Road<br />

Ladyao , Chatuchaak, Bangkok 10900<br />

Tl Tel. 02 02-953-9163-64 953 9163 64 F Fax 02 02-953-9167 953 9167<br />

Mobile 085-918-3691 (Dr. Dusit Kruangam)<br />

E-Mail: info@thaisolarfuture.com , dusit@thaisolarfuture.com<br />

panatda@thaisolarfuture.com<br />

Prachanives 1<br />

Market<br />

Tesaban Song Khro Road<br />

Ratchada Piset Road<br />

N<br />

Samien Naree<br />

Temple<br />

Kasetsart<br />

University<br />

Wiphawadee Road<br />

Bon Marche<br />

Market<br />

Ratchawipha Bridge<br />

Central<br />

Ladplao<br />

08/10/55<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!