Sogea - 1999 annual report - Vinci
Sogea - 1999 annual report - Vinci
Sogea - 1999 annual report - Vinci
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
32<br />
HYDRAULIC ENGINEERING<br />
In the Benelux, activity for the industrial sector<br />
remained modest in <strong>1999</strong> but it should pick up in<br />
2000. In the field of pipe and oil and gas pipeline<br />
laying, Denys continues its partnership with GDF.<br />
The company recently signed a large contract with<br />
the latter for the reinforcement of its gas<br />
transportation network to the south of Europe. Denys<br />
also operates outside the Benelux, as witness its<br />
recent successes in the north of France.<br />
Finally, Socea, a Denys subsidiary specialized in the<br />
installation of concrete pipelines and a leader in the<br />
field, developed – for its 35th anniversary in <strong>1999</strong> –<br />
a new patent for the construction of very large<br />
diameter wells which are installed through kirving.<br />
In the United Kingdom Norwest Holst is currently<br />
completing the construction of a water treatment<br />
plant in Miworth for Severn Trent and it has just<br />
begun work on another at Birkenhead for North<br />
West Water. As part of its business diversification and<br />
building on its experience of more than 100 years in<br />
hydraulic engineering, <strong>Sogea</strong> began a few years ago to<br />
actively seek business in the export market beyond its<br />
traditional operating areas. This initiative has already<br />
led to several successes: in Palestine, the company<br />
has just completed work to improve the efficiency of<br />
the drinking water systems in Bethlehem and Hebron;<br />
in Portugal it handed over the Ermesinde purification<br />
plant in <strong>1999</strong>; it is currently doing work in Kosovo<br />
together with teams from Générale des Eaux; and<br />
finally in Kazakhstan it has just been provisionally<br />
selected to lay 51 km of steel pipe in Astana.<br />
1. Denys has for many<br />
years been a master<br />
of advanced hydraulic<br />
engineering techniques,<br />
particularly drilling and<br />
micro-tunnelling.<br />
2. Denys built a 900 mm<br />
diameter siphon<br />
under the Escault at<br />
Antoing as part of<br />
the Western Hainaut<br />
drinking water<br />
supply project.<br />
1<br />
2