3.2 General layout<br />

The <strong>Gibe</strong> <strong>III</strong> hydropower plant includes the following main structures:<br />

• a Roller Compacted Concrete gravity dam with spillway <strong>and</strong> middle outlets<br />

• three hydraulic tunnels <strong>and</strong> two cofferdams for the river diversion<br />

• two hydraulic tunnels, penstocks <strong>and</strong> surge shafts for the power waterways<br />

• an outdoor Power House, equipped with No. 10 Francis turbines, <strong>and</strong> a switchyard<br />

• access roads<br />

The table below summarizes the main characteristics of the project (ref. Level 1 Design, 2008) illustrated in<br />

the following paragraphs.<br />

HYDROLOGY<br />

Catchment area (km 2 ) 34150<br />

Average annual runoff (m 3 /sec) 438.2<br />

(Mm 3 /year) 13820<br />

10,000 years return peak flood (m 3 /sec) 10600<br />

Probable maximum flood (m 3 /sec) 18660<br />

Mean annual sediment yield (Mm 3 /year) 18.3<br />

RESERVOIR<br />

Extreme flood level (PMF level) (m a.s.l.) 892.5<br />

Max/Normal O.L. (max. ret. level) (m a.s.l.) 892<br />

Minimum O.L. (m a.s.l.) 800<br />

Total storage (Mm 3 ) 14700<br />

Live storage (max. regulated capacity) (Mm 3 ) 11750<br />

Surface area at max o.l. (km 2 ) 211<br />

RCC DAM<br />

Crest el. (m a.s.l.) 896<br />

Crest length (m) 610<br />

Max. height above river bed (m) 223<br />

Max. height above foundations (m) 243<br />

Basic triangle opening 0.75<br />

RIVER DIVERSION<br />

Diversion tunnels (No, D) (#, m) 3, 7/13.5<br />

Cofferdam crest el. (m a.s.l.) 720<br />

Design flood (m 3 /sec) 5200<br />

CESI SpA - Mid-Day International Consulting Engineers Page 47