Environmental and Social Impact Assessment - Gibe III

Environmental and Social Impact Assessment - Gibe III

Environmental and Social Impact Assessment - Gibe III

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Gibe</strong> <strong>III</strong> – <strong>Environmental</strong> <strong>and</strong> <strong>Social</strong> <strong>Impact</strong> <strong>Assessment</strong> 300 ENV R CS 002 C - A9003099<br />

The <strong>Gibe</strong> <strong>III</strong> hydropower plant is the third plant of the <strong>Gibe</strong> cascade developing the hydroelectric potential of<br />

the <strong>Gibe</strong>-Omo river including:<br />

• Gilgel <strong>Gibe</strong> or <strong>Gibe</strong> I operating since 2004<br />

• <strong>Gibe</strong> II currently under completion<br />

• <strong>Gibe</strong> IV <strong>and</strong> <strong>Gibe</strong> V projects, for hydropower <strong>and</strong> agricultural uses, currently being planned<br />

The figure below shows the location of <strong>Gibe</strong> <strong>III</strong> (coordinates 312,200 E, 757 200 N, dam axis) <strong>and</strong> of the<br />

other plants of the Cascade within the Omo river basin.<br />

Figure 3.2: <strong>Gibe</strong> cascade location<br />

CESI SpA - Mid-Day International Consulting Engineers Page 46