<strong>Gibe</strong> <strong>III</strong> – <strong>Environmental</strong> <strong>and</strong> <strong>Social</strong> <strong>Impact</strong> <strong>Assessment</strong> 300 ENV R CS 002 C - A9003099<br />

Costs of certain items associated with environmental management <strong>and</strong> monitoring is an integral part of<br />

specific items incorporated in overall project construction budgets, <strong>and</strong> no separate budget is necessary to<br />

cover these aspects. Marginal costs of the contractor incurred in complying with environmental protection<br />

clauses in the construction contract are incorporated in unit rates <strong>and</strong> bill items <strong>and</strong> are included in<br />

construction costs. It should be noted that no significant increase in construction costs is expected in<br />

connection with requiring compliance with environmental protection clauses, since these merely require the<br />

EPC contractor <strong>and</strong> his sub-contractors to behave in a responsible manner in relation to the environmental, in<br />

accordance with good construction practice.<br />

The cost of the environmental mitigation plan is considered as a component of the financial requirements of<br />

the project. Marginal benefits from the exploitation of the hydropower development should be set aside for<br />

financing the long term financial needs of the social <strong>and</strong> environmental needs of the area such as<br />

resettlement, agricultural extension, watershed management, development <strong>and</strong> management of buffer zones.<br />

Table 0.2: Summary of estimated environmental mitigation, monitoring <strong>and</strong> training costs<br />

No. Item<br />

Estimated Cost<br />

(Birr)<br />

1 <strong>Environmental</strong> mitigation <strong>and</strong> management cost: Dam <strong>and</strong> Reservoir 21,500,000<br />

2 <strong>Environmental</strong> mitigation <strong>and</strong> management cost: Downstream 245,050,000<br />

3 Resettlement action plan 102,195,000<br />

4 <strong>Environmental</strong> monitoring 6,550,000<br />

5 Capacity building <strong>and</strong> procurement 5,200,000<br />

6 Training <strong>and</strong> study tour 5,100,000<br />

7 <strong>Environmental</strong> audit (annual audit by an independent entity for 5 years) 1,500,000<br />

Total 387,095,000<br />

8 Administration cost (5%) 19,354,750<br />

9 Contingency (10%) 38,709,500<br />

Gr<strong>and</strong> Total 445,159,250<br />

CESI SpA - Mid-Day International Consulting Engineers Page 27