Pre-construction phase:<br />

Table 10.1: <strong>Environmental</strong> Management Framework<br />

Action Responsible body Comments<br />

Review <strong>and</strong> submission of ESIA documentation to<br />

EPA for evaluation.<br />

Detailed drawings showing project l<strong>and</strong> acquisition<br />

requirements submitted to EEPCO<br />

L<strong>and</strong> <strong>and</strong> property expropriation surveys,<br />

assessment, payment of compensation <strong>and</strong><br />

implementation of RAP to start.<br />

Construction phase:<br />

Preparation of site environmental checklists,<br />

reporting procedures etc.<br />

EEPCO/Project Developer All reviews <strong>and</strong> revisions should be on time, so that an environmental permit can<br />

be issued.<br />

EPC Contractor Must be submitted as early as possible to allow that EEPCO has sufficient time<br />

for completion of all l<strong>and</strong> acquisition related matters (including implementation<br />

of resettlement <strong>and</strong> compensation).<br />

EEPCO <strong>and</strong> local govt. bodies L<strong>and</strong>/property expropriation process <strong>and</strong> full implementation of RAP must be<br />

completed on time, so that the contractor has unimpeded access to the site.<br />

Supervision Consultants’ RE <strong>and</strong><br />

<strong>Environmental</strong> Specialist<br />

Review of contractor's plans, method statements etc. As above As above<br />

Review of environmental management plan Owner’s Engineer <strong>and</strong> <strong>Environmental</strong><br />

Specialist<br />

Site clearance inspection <strong>and</strong> certification on<br />

completion of the works<br />

Operation phase:<br />

Buffer Area Development <strong>and</strong> Watershed<br />

Management<br />

Must be completed before main construction works commence.<br />

To take place approximately 6 months into the main construction period.<br />

As above Carried out on a rolling basis as each major section of work is completed.<br />

EEPCO with Wereda <strong>and</strong> Zonal Level<br />

Offices of Agriculture<br />

Regularly check the effectiveness of the recommended <strong>and</strong> implemented<br />

watershed management interventions<br />

CESI SpA - Mid-Day International Consulting Engineers Page 265