<strong>Gibe</strong> <strong>III</strong> – <strong>Environmental</strong> <strong>and</strong> <strong>Social</strong> <strong>Impact</strong> <strong>Assessment</strong> 300 ENV R CS 002 C - A9003099<br />

Consultation conducted with Authorities at <strong>Gibe</strong> <strong>III</strong> downstream<br />

Photo 8.8: Consultation with South Omo Zone,<br />

Dasenech Wereda Council<br />

8.6 Consultation for National Parks <strong>and</strong> Protected Areas<br />

Photo 8.9: Consultation with South Omo Zone,<br />

Hammer Wereda Council<br />

8.6.1 Views of the Ministry of Agriculture <strong>and</strong> Rural Development<br />

The Wildlife Conservation Department of the Ministry of Agriculture <strong>and</strong> Rural Development<br />

(MoARD/WCD) which is the responsible governmental body for the Omo <strong>and</strong> Mago national parks was<br />

requested to forward its comments towards the potential negative impacts of the project upon the parks <strong>and</strong><br />

the surrounding areas. These parks are situated on the right <strong>and</strong> left banks of the Omo River downstream of<br />

the hydropower project.<br />

According to the office, there is no wildlife that is entirely dependent on grass grown on floodplain. The<br />

livestock <strong>and</strong> wild animals have abundant grazing l<strong>and</strong>s outside the river courses <strong>and</strong> therefore they will not<br />

be affected by the project.<br />

There will also be no any significant effect upon the aquatic life in the National Park areas.<br />

Currently, a “community tourism“ is initiated <strong>and</strong> this is taking tourists from Lake Turkana to the upstream<br />

of the Omo River through small h<strong>and</strong> operated as well as motorized boats. By this package a tourist will visit<br />

the national parks as well as the indigenous people of the area. Therefore, the fluctuating water levels caused<br />

by operation of the plant (reduction in discharge when no energy is generated from the power station <strong>and</strong> the<br />

increased discharge as the power station begins to operate) may affect the operation of this programme.<br />

8.6.2 Views of the Office of National Parks <strong>and</strong> CHA<br />

The Omo <strong>and</strong> Mago National Park <strong>and</strong> Murule Controlled Hunting Area (CHA) are found within the<br />

downstream of the <strong>Gibe</strong> <strong>III</strong> scheme. The potential impact of the project on these protected areas was assessed<br />

through consultations with the officials from the two parks <strong>and</strong> the CHA. As an introduction, the study team<br />

made brief presentation about the general features of the project. According to the information obtained from<br />

them, currently the parks have started community tourism program by means of boat transport from Lake<br />

Turkana via Omo gorge to the upstream of the parks. The officials’ perceive that the high fluctuation in the<br />

river flow may hinder boat transportation <strong>and</strong> could be a cause for the interruption of the program. Therefore,<br />

the operation of the hydropower scheme could have a significant negative impact on the program.<br />

CESI SpA - Mid-Day International Consulting Engineers Page 252