Runoff data<br />

Another fundamental hydrological parameter was considered in the elaborations reported in the following<br />

paragraphs: runoff. Unfortunately not as many gauging stations as rainfall ones are present in the basin under<br />

investigation, but few of them at located at key sites, thus assuming particular importance. Gauging stations<br />

are mainly maintained by the Hydrology Department of the Ethiopian Water Resources Authority which<br />

processes <strong>and</strong> archives data. The longest record is that of the Abelti station on the <strong>Gibe</strong> River, starting in<br />

1963.<br />

The following table reports the available hydrometric data:<br />

Station<br />

Table 5.11: Runoff stations of the EWRA <strong>and</strong> periods of observation<br />

Region Basin Longitude Latitude<br />

Location Catchment Observation<br />

Elevation<br />

masl<br />

CESI SpA - Mid-Day International Consulting Engineers Page 102<br />

Area<br />

km 2<br />

Mean<br />

elevation m asl<br />

Max<br />

elevation<br />

m asl<br />

1 GIBE nr LIMU<br />

GENET<br />

GIBE 36°56' 08°06' - 533 - - 14 84-04<br />

SEKA GIBE 36°45 07°36' - 280 - - 24 80-03<br />

3 GIBE river nr.<br />

ABELTI<br />

KEFA GIBE 37°35' 08°14' 1100 15746 2030 3386 40 63-04<br />

4 BIDRU AWANA<br />

nr. SEKORU<br />

KEFA GIBE 37°24' 07°55' 1500 41 2262 2536 20 81-03<br />

5 BULBULE nr.<br />

SERBO<br />

KEFA GIBE 37°02' 07°34' 1700 301 1977 2837 8 86-93<br />

6 MEGECHA nr.<br />

GUBRIE<br />

KEFA GIBE 37°28' 08°11' 1500 286 1750 2000 32 67-04<br />

7 GILGEL GIBE nr.<br />

ASENDABO<br />

KEFA GIBE 37°11' 07°45' 1650 2966 2200 3359 27 67-93<br />

8 REBU river nr.<br />

WOLKITIE<br />

SHEWA GIBE 37°47' 08°21' 1500 480 2067 2882 23 67-89<br />

9 WABI nr.<br />

WOLKITIE<br />

SHEWA GIBE 37°46' 08°15' 1700 1866 2487 3719 38 67-04<br />

10 GOGHEB river nr.<br />

ENDIBIR<br />

SHEWA GIBE 37°54' 08°06' - 190 - - 32 67-99<br />

11 GOJEB nr.<br />

SHEBE<br />

GOJEB 36°23' 07°25' 1080 3356 1976 3358 36 70-05<br />

12 GECHA nr.<br />

BONGA<br />

36°13' 07°17' - 175 - - 23 82-04<br />

13 SHETA nr.<br />

BONGA<br />

36°14' 07°17' - 191 - - 25 80-04<br />

It should be noted that for the station of Asendabo the runoff time series was derived from the Gilgel <strong>Gibe</strong><br />

Hydroelectric Project, Hydrological Report, <strong>and</strong> November 1995. Most of the stations show a sufficiently<br />

long period of record. In some cases of particular importance (Abelti <strong>and</strong> Wabi), as will be shown in the<br />

following paragraphs, the infilling of missing data was necessary to obtain 40 years long time series. The<br />

Serbo station, with an 6 years long period of record, was excluded from the elaborations. As it can be seen<br />

the Abelti station on the <strong>Gibe</strong> River has particular importance as it represents alone a considerable<br />

percentage of the entire area under investigation (almost 46%). Most of the gauging stations listed in Tab. 3<br />

are located upstream Abelti. Also the Wolkite station on the Wabi River is of great importance, as it covers<br />

an area, downstream Abelti, of 5% of the total area. The same consideration can be made for the Shebe<br />

gauging station on the Gojeb River (10% of the total area), but to enlarge the area covered by this station the<br />

runoff time series at the Gojeb Dam Site OM19 location was considered (15% of the total area), as reported<br />

in the Gojeb Medium Hydropower Project, Pre-Feasibility Study, Vol.1 - Executive Summary, Vol. 3 -<br />

Annex A, Hydrology, Oct 1996. The data reported for OM19 were suitably infilled for the years following<br />

1996 according to the Shebe runoff, following the deterministic correlation existing between these two sites.<br />

n.<br />

year<br />

Period