Searle MSP- INV: M&S Inverter Packs
Searle MSP- INV: M&S Inverter Packs Searle MSP- INV: M&S Inverter Packs
Searle MSP- INV: M&S Inverter Packs Part Number 272-000-294 iss3 September 2007
- Page 2 and 3: MSP-INV Installation and Operating
- Page 4 and 5: MSP-INV Installation and Operating
- Page 6 and 7: MSP-INV Installation and Operating
- Page 8 and 9: MSP-INV Installation and Operating
- Page 10 and 11: MSP-INV Installation and Operating
- Page 12 and 13: MSP-INV Installation and Operating
- Page 14 and 15: MSP-INV Installation and Operating
- Page 16 and 17: MSP-INV Installation and Operating
- Page 18 and 19: MSP-INV Installation and Operating
- Page 20 and 21: MSP-INV Installation and Operating
- Page 22 and 23: MSP-INV Installation and Operating
- Page 24 and 25: This document is protected by copyr
- Page 26 and 27: This document is protected by copyr
- Page 28 and 29: This document is protected by copyr
- Page 30 and 31: This document is protected by copyr
- Page 32 and 33: This document is protected by copyr
- Page 34 and 35: This document is protected by copyr
- Page 36 and 37: This document is protected by copyr
- Page 38 and 39: This document is protected by copyr
- Page 40 and 41: This document is protected by copyr
- Page 42 and 43: This document is protected by copyr
- Page 44 and 45: This document is protected by copyr
- Page 46 and 47: This document is protected by copyr
- Page 48 and 49: This document is protected by copyr
- Page 50 and 51: This document is protected by copyr
<strong>Searle</strong> <strong>MSP</strong>- <strong>INV</strong>: M&S <strong>Inverter</strong> <strong>Packs</strong><br />
Part Number 272-000-294 iss3 September 2007
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 0. Index<br />
Issue 3 Page - 2 -<br />
September 2007<br />
<strong>MSP</strong>-<strong>INV</strong>, <strong>MSP</strong>L-<strong>INV</strong> & MSHP <strong>Inverter</strong> Pack Sets INDEX<br />
Sheet No’s Issue No<br />
1 Health & Safety 3 1<br />
2 Installations and Commissioning 4 � 12 1<br />
3 Operating Limits 13 1<br />
4 Maintenance Instructions 14 �21 1<br />
5 Guarantee 22 1<br />
6 Wiring Diagrams 23 � 56 1<br />
7 Controls Logic & Settings 57 � 70 1<br />
8 Layout Diagrams 71 � 81 1<br />
9 Spares Lists 82 � 86 1<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 1. Health & Safety<br />
Issue 3 Page - 3 -<br />
September 2007<br />
1. Health & Safety<br />
This concerns the hazards that may be encountered when installing and maintaining<br />
this equipment. It is therefore important that these instructions are followed.<br />
All Electrical connections to the unit should be made in accordance with IEE regulations,<br />
16 th Edition, with further attention to applicable local by-laws.<br />
All work must be undertaken by trained personnel only.<br />
Before installation<br />
Ensure that the voltage, working fluid and the maximum working pressure stated on the product<br />
nameplate is suitable for the working environment.<br />
Ensure that the proposed method of mounting is adequate to support the total operational weight of the<br />
unit.<br />
During installation and maintenance<br />
Ensure that:<br />
1. the unit is installed and maintained by qualified personnel only.<br />
2. the electrical supply is isolated and secured from accidental reconnection.<br />
3. the working area is adequately ventilated.<br />
4. the temperature of coils with vinyl coated fins does not exceed 150°C (e.g. during brazing) as toxic<br />
fumes would be produced.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 4 -<br />
September 2007<br />
2. Installation and Commissioning INDEX<br />
Page No’s Issue No<br />
2.1 Before Installation 5 1<br />
2.2 Handling & Lifting 6 1<br />
2.3 Installation and Location Guidance 6 1<br />
2.4 Floor / Roof Mounting 6 1<br />
2.5 Pack Assembly 7 1<br />
2.6 Pipework & Brazing 8 1<br />
2.7 Pressure Testing 8 1<br />
2.8 Electrical 9 1<br />
2.9 Evacuation 10 1<br />
2.9.1 Holding Charge 10 1<br />
2.9.2 Open shut off valves 10 1<br />
2.9.3 Compressor crank case heaters 10 1<br />
2.9.4 Evacuation 10 1<br />
2.10 Refrigerant Charging 11 1<br />
2.11 Oil Recovery and Oil Charging 11 1<br />
2.12 Compressor Mounting Feet adjustment 11 1<br />
2.13 Initial Starting / Running 12 1<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
2
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 5 -<br />
September 2007<br />
2.1 Before Installation<br />
Upon receipt and prior to installation of the unit a Post Delivery Inspection should be carried out, with<br />
any discrepancies being reported to the supplier within 7 days.<br />
The unit should be checked for damage and that all loose items have been supplied.<br />
Loose Items Supplied :<br />
Electrical Box Key x 1<br />
Oil separator Spare Element x 1<br />
Polyolester oil, 3.8L x 1<br />
(Loose or pre-charged in separator)<br />
Anti-Vibration Mounting feet x4 (x8 for Split Pack)<br />
Discharge & Suction PRV’s fitted<br />
Unit free from Damage<br />
Comments :<br />
When Shipped Upon Delivery<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
2
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 6 -<br />
September 2007<br />
2.2 Handling & Lifting<br />
Lifting lugs in the unit base frame(s) are provided, and it is essential when lifting that stage spreader<br />
bars be used to prevent damage to the unit. When handling the unit into position, it should be kept as<br />
low as possible and should not be tilted more than 30 degrees to the horizontal.<br />
2.3 Installation and Location Guidance<br />
Consideration should be given to pipework associated with the installation, which can become an<br />
obstruction to service and maintenance of the unit.<br />
Consideration should also be given to servicing requirements - there should be adequate space of at<br />
least 1 metre clearance on all access doors and panels.<br />
2.4 Floor / Roof Mounting<br />
The main base frame of the unit must be secured to the intended supporting surface using the antivibration<br />
mounts provided.<br />
Any supporting surface must be rated to support the total operational weight of the unit, including the<br />
additional refrigerant charge and any other equipment that has been added, i.e. pipework, cabling etc.<br />
If the unit is mounted directly to the roof it is recommended that isolation material be used between the<br />
unit frame and the roof itself.<br />
Dry weights of the Split units are :<br />
<strong>MSP</strong>L050-<strong>INV</strong> (Split) = 746 kg<br />
<strong>MSP</strong>L060-<strong>INV</strong> (Split) = 834 kg<br />
<strong>MSP</strong>L080-<strong>INV</strong> (Split) = 871 kg<br />
<strong>MSP</strong>L100-<strong>INV</strong> (Split) = 923 kg<br />
Dry weights of the 1 Piece units are :<br />
<strong>MSP</strong>050-<strong>INV</strong> = 676 kg<br />
<strong>MSP</strong>060-<strong>INV</strong> = 764 kg<br />
<strong>MSP</strong>080-<strong>INV</strong> = 801 kg<br />
<strong>MSP</strong>100-<strong>INV</strong> = 853 kg<br />
Dry weights of the Housed units are :<br />
MSHP050-<strong>INV</strong> = 1923 kg<br />
MSHP060-<strong>INV</strong> = 2011 kg<br />
MSHP080-<strong>INV</strong> = 2048 kg<br />
MSHP100-<strong>INV</strong> = 2100 kg<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
2
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 7 -<br />
September 2007<br />
2.5 Pack Assembly (Applies to Split <strong>Packs</strong> only, <strong>MSP</strong>L-<strong>INV</strong>)<br />
The pack is supplied in 2 halves to allow for location and transportation via a standard goods lift.<br />
The unit should be handled with care, avoiding any strain or damage to components whilst being<br />
maneuvered. Do not use any pipework or component fittings to maneuver the unit, use the main<br />
steel frame only.<br />
2<br />
Assemble the two halves of the pack together as follows :-<br />
1. Butt up the two halves of the pack together and mark off the pipework connections for the<br />
Suction and the Discharge interconnection pieces.<br />
2. Remove the pipe clamps at the ends of the headers ready for cutting back.<br />
3. Ensure the holding charge is released carefully, then cut back the 4 connections<br />
4. Ease the halves apart and loosely fit the interconnection pieces to the suction and discharge.<br />
5. Butt the two halves together again, and securely fit the front and back fishplates, using all fixing<br />
positions.<br />
6. Carefully braze the interconnection pieces, at all 4 joints.<br />
7. Unreel the oil return hoses on the LH section, and fit them to the compressor traxoil inlets on<br />
compressors 2, 3 and 4.<br />
8. Pressure test and leak test the assembly and all joints made.<br />
9. Fully evacuate the assembly as described in section 2.10 page 11.<br />
10. Open the compressor control cabinets and remove the front trunking covers.<br />
11. Unreel compressor number 2, 3 and 4’s 10mm2 power cables and feed them through the<br />
trunking, and into the LH control assembly.<br />
12. Securely connect the compressor power cables to the appropriate stud terminal, ensuring all<br />
phasing is correct and in the right rotation.<br />
13. Unreel the compressor 1 cable loom, and fit via the glanding entry point on the RH control box.<br />
14. Plug up the compressor 1 cable loom into the RH control box connections, ensuring all<br />
connections are made ok.<br />
15. Mark off and drill all the mounting feet into the supporting floor, securing with suitable fixings.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 8 -<br />
September 2007<br />
2.6 Pipework & Brazing<br />
Pipework to and from the unit should be selected to suit the application and not the connection size of<br />
the unit. Pipework sizes should be selected to ensure pressure drop does not exceed an equivalent of 2K<br />
at full load conditions.<br />
Pipework must be designed to ensure good oil return, especially during low load conditions.<br />
Pipework should be supported independently from the condensing unit in a way that prevents the<br />
transmission of vibration to the units.<br />
A competent engineer should install the refrigerant pipework to a high standard of refrigeration<br />
practice. All pipework used must be clean and to refrigeration quality, all cuts should be made using a<br />
pipe cutter, never a hacksaw, and care must be taken to remove all burrs and swarf.<br />
Braze using silver bearing brazing rod and ensure that all joints are cleaned before brazing.<br />
During brazing care should be taken to ensure that all components near joints should not be excessively<br />
overheated, a wet cloth should be applied where necessary. Dry nitrogen should be passed through the<br />
pipework during brazing to minimise oxidisation.<br />
During brazing ensure the temperature of coils with vinyl coated fins does not exceed 150°C<br />
as toxic fumes would be produced.<br />
The Suction inlet and Discharge outlet connection stubs are located towards the rear of the, the suction<br />
stub is 2 5/8”, the Discharge stub is 1 5/8”, ensure the holding charge has been safely released and cut<br />
back the stubs and prepare the connections as required to match the system pipework, and braze<br />
accordingly.<br />
When brazing and leak testing are complete the suction line should be insulated with 3/4" thick Class ‘O’<br />
insulation.<br />
2.7 Pressure Testing<br />
The unit has been thoroughly pressure tested during manufacture however after on site brazing is<br />
complete all pipework should be pressure tested for leaks.<br />
When pressure testing it is imperative that low and high side components are not over pressurised.<br />
Low side components must not be subjected to any pressure greater than 12.6 Barg, high side<br />
components must not be subjected to any pressure greater than 22.5 Barg.<br />
Failure to adhere to these pressures will activate the safety bursting discs and relief valves, requiring<br />
replacement.<br />
During pressure testing the main Manual Reset High pressure switches may trip, ensure all switches are<br />
reset, if required, after pressure testing.<br />
Pressure testing must be by a currently recognised method.<br />
Pressure testing using refrigerant must never be undertaken.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
2
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 9 -<br />
September 2007<br />
2.8 Electrical<br />
NOTE : All Electrical connections to the unit should be made in accordance with IEE<br />
regulations, 16 th Edition, with further attention to applicable local by-laws.<br />
The units have been designed to accept multiple incoming 63A feeds, or with a single sub-main<br />
supply with the Busbars, fitted to the unit.<br />
IMPORTANT : If Separate incoming feeds are used the Busbars MUST BE REMOVED,<br />
before wiring commences.<br />
For a multiple supply 5 separate feeds are required as follows :<br />
3 x TP&N for Compressor’s<br />
1 x SP&N for Controls<br />
1 x SP&N for RCD Socket, Lighting and Housing Evaporator.<br />
All cabling should be of the correct rating and type, also adhering to M&S specifications.<br />
Incoming connections should be made via the Main’s Incoming compartment situated on the far left of<br />
the pack control panel. Cables should be routed through the bottom Glanding plate as shown in Fig. 2.<br />
Cables should also be glanded or restrained to the glanding plate incorporated in the base of the mains<br />
incoming termination panel.<br />
Fig 2<br />
The glanding plates may be removed for ease<br />
of working.<br />
Note : the glanding plates are not rated<br />
to support weight of the incoming<br />
supply cables, which must be supported<br />
independently from the unit.<br />
Incoming supplies should be connected to the<br />
post terminals ensuring correct phase rotation<br />
in all cases.<br />
All incoming supplies should be properly<br />
identified with special care being taken to<br />
prevent any cross phasing between supplies.<br />
IMPORTANT :<br />
The supply to the RCD Socket MUST be<br />
disconnected before any High Voltage<br />
Insulation tests are carried out. Failure<br />
to so will irrevocably damage the RCD<br />
Socket.<br />
See wiring diagram on page 39 for further<br />
details.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
2
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 10 -<br />
September 2007<br />
2.9 EVACUATION<br />
2.9.1 Holding Charge : The unit has been leak tested, dehydrated and filled with a holding charge of<br />
‘dry air’ during manufacture. The holding charge should be released to atmosphere in a controlled<br />
manner via the suction stub, liquid stub, and receiver service ports, not into the housing<br />
compartment. Any valve opened to atmosphere must be closed after releasing the holding<br />
charge.<br />
2.9.2 Ensure that all system shut off valves are open as follows :<br />
1. 2 5/8” Suction Ball Valve, under control panel, open.<br />
2. Compressor Suction Service valves (Back seated with sealing cap on), on rear or top of<br />
compressors.<br />
3. Compressor Discharge Service valves (Back seated with sealing cap on) on top of compressors.<br />
4. Compressor Oil return line shut off valves (Back seated with sealing cap on), on top of oil return<br />
header x4.<br />
5. All Valves in the condensing circuit installation.<br />
6. Receiver service valves, (Back seated with sealing cap on).<br />
7. Liquid filter bypass arrangement, top valve open, centre valve shut, bottom valve open. The<br />
refrigerant flow must go through the drier.<br />
8. Solenoid valves on the oil level floats and compartment cooler should be opened with manual solenoid<br />
valve operating magnets.<br />
Warning : Never energise any Solenoid coil when not fitted to its solenoid stem.<br />
2.9.3 Compressor crank case heaters should be on during evacuation as follows :<br />
1. Turn off all Isolators on the electrical cabinet compartment doors.<br />
2. Open each compressor compartment door.<br />
3. Switch all Compressor Overloads to the Off or ‘0’ position.<br />
4. Switch MCB’s 1CB1, 2CB1, and 3CB1 to the on position<br />
5. Switch all other MCB’s to the off position.<br />
6. Close all electrical compartment doors.<br />
7. Turn on Compressor 1, 2, and 3 isolators ONLY, do not turn on the common controls or Condenser<br />
compartment isolators. The crank case heaters will now be energised.<br />
2.9.4 The entire system should be evacuated prior to charging as follows:<br />
Connect vacuum pump to the 1/4” flare connections on the suction and discharge service valves of<br />
compressor 1 and 2, and if possible the receiver service valves. Ensure each service valve is mid seated,<br />
the valve spindles should be screwed in a few turns from the back seated position to open the ports, and<br />
the sealing caps replaced.<br />
Evacuate the system to below 225 microns (0.3 mbar). The pump should be isolated and the system<br />
pressure monitored. A rapid continuous rise could indicate a leak in the system.<br />
Warning : DO NOT Start or Insulation Test the Compressors under Vacuum.<br />
After evacuation all Solenoid coils MUST be replaced on their solenoid stems.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
2
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 11 -<br />
September 2007<br />
2.10 Refrigerant Charging<br />
The unit should be charged with the specified refrigerant R404A until the sight glass is just clear at the<br />
normal operating condition. R404A refrigerant must be charged as a Liquid, and never as a gas.<br />
Charge the unit whilst under vacuum with liquid refrigerant via the access valve on top of the liquid<br />
filter drier. Additional charge should be added at the evaporator distributor or immediately after<br />
the expansion valve.<br />
Liquid charging direct to the suction line is not permitted under any circumstances.<br />
If after charging the unit is left with the power supply turned off, the compressor crankcase heaters<br />
should be switched on for a minimum of 3 hours before the unit is started. This will ensure that the<br />
compressor sumps are free from liquid refrigerant, see section 2.10.3 p12 for further info.<br />
Warning : DO NOT allow Compressors to Short Cycle under low pressure whilst Charging.<br />
2.11 Oil Recovery and Oil Charging<br />
The unit is fitted with a High Pressure oil management system, which must be charged to its final oil<br />
level during initial system operation. The oil separator incorporates an oil reservoir, which is pre-charged<br />
with Polyolester oil, each compressor is also pre-charged with Polyolester oil.<br />
If the unit is installed into a new installation some oil will be lost into the system pipework.<br />
If the unit is installed into an existing installation oil may return to the separator from the rest of the<br />
system due to the increased efficiency of the separator.<br />
For a new installation add oil to maintain a level in the upper sight glass of the reservoir.<br />
For an existing installation maintain an oil level in the lower sight glass of the reservoir.<br />
After two days of system operation the oil level should be checked, and if required add or remove oil to<br />
maintain a level in the upper sight glass of the reservoir for new and existing installations.<br />
Add oil into the service connection on the shut off valve at the base of the separator/reservoir, ensure<br />
the valve is back seated before removing the flare cap. Only suitable Polyolester oil, such as Bitzer BSE<br />
32, or equivalent should be used. During normal operation each oil management float should show a<br />
level between ½ and ¾ full sight glass.<br />
2.12 Compressor Mounting Feet<br />
All compressor mounting feet fixings should be checked to ensure they are<br />
fully tightened, and re-tightened if necessary.<br />
Check the fittings on the top of each compressor foot (1), the fitting (2)<br />
should be firmly screwed on to the centre studding, and not be able to be<br />
moved. See Fig 3.<br />
Fig. 3.<br />
SOLID<br />
MOUNT<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1<br />
2<br />
2
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 2. Installation & Commissioning<br />
Issue 3 Page - 12 -<br />
September 2007<br />
2.13 Initial Starting / Running<br />
Before operating the unit for the first time, check that components, motors, compressors, mountings and<br />
electrical covers are secure.<br />
When the unit has been installed, the relevant oil and refrigerant charges have been added, and the<br />
correct controller settings entered it may be set in to normal operation as follows :<br />
1. Ensure all shut off valves are open, (suction line, liquid line, condenser inlet valves, receiver inlet<br />
and outlet valves, compartment cooler liquid and suction (MSHP only), and compressor discharge,<br />
suction and oil return shut off valves).<br />
2. Ensure the liquid filter drier bypass valve is closed and the refrigerant directed to pass through the<br />
filter drier.<br />
3. Ensure all solenoid-operating coils removed during evacuation have been replaced.<br />
4. Turn off all electrical compartment isolators.<br />
5. Open all compartments and ensure all MCB’s and Overloads are switched on or in the ‘1’ position.<br />
Close all Compartment doors but leave isolators switched off.<br />
6. Turn on the main control panel isolator and condenser panel isolator (if fitted), leaving compressor<br />
isolators off.<br />
7. Allow the controller to initialise, the suction pressure will be shown on the display, the discharge<br />
pressure can be monitored on the backup millennium controller inside the common controls panel.<br />
8. Turn on the isolator for compressor 1, and energise the evaporator liquid line solenoids. After the<br />
compressor on delay the first stage will start under inverter control, increasing from low speed. Ensure<br />
correct compressor operation.<br />
9. Repeat step 7 one stage at a time until all compressors are running. If all compressors will not run at<br />
the desired suction setting ensure all evaporators are running and that the system is adequately<br />
charged. Ambient temperature conditions may also affect the number of stages required.<br />
10. Check that the remote condenser fans operate and rotate in the correct direction. The airflow<br />
direction is commonly across the motor and out through the fan guard.<br />
11. Allow the unit to operate as normal for 48 hours and then carry out the 48 hours operation after<br />
Initial Start-up Maintenance, as described in section 4.0.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
2
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 3. Operating Limits<br />
3. Operating Limits<br />
The <strong>MSP</strong>-<strong>INV</strong> pack is designed for Medium<br />
temperature applications, and its operation<br />
must stay within the application envelope<br />
shown in fig 4.<br />
<strong>MSP</strong>100 and 080-<strong>INV</strong> compressor stages 2 & 3<br />
can operate in the Blue area, compressor stage<br />
1 may safely operate in the Blue and Red areas.<br />
<strong>MSP</strong>060-<strong>INV</strong> and 050-<strong>INV</strong> Compressor stages 2<br />
and 3 can operate in the Blue area, compressor<br />
stage 1 may safely operate in the Blue and Red<br />
areas.<br />
It is important that the Main controller and<br />
Protection/Control pressure switches are not set<br />
outside of the application envelope, otherwise<br />
compressor malfunction may occur.<br />
Failure to observe these limits will void the<br />
compressor warranty.<br />
Condensing Temperature °C<br />
Issue 3 Page - 13 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
60<br />
50<br />
40<br />
30<br />
20<br />
-50 -40 -30 -20 -10 -0 +10<br />
Saturated Suction Temperature [°C]<br />
All Compressor Stages<br />
For R404A the Pressure vs. Temperature relationship is as shown (Fig 5).<br />
R404A<br />
0.5<br />
1<br />
1.5<br />
2<br />
3<br />
4<br />
5<br />
°C<br />
6 7 8 9 10<br />
<strong>MSP</strong>100 & 080 - Comp Stage 1 only<br />
<strong>MSP</strong>050 & 060 - Comp Stages 1 & 2 only<br />
-35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70<br />
BarG<br />
Multiple Evaporator Applications<br />
Where one unit is connected to multiple evaporators, operated independently from one another, it is vital<br />
that the minimum saturated suction temperature remains within the operating envelope when the unit is<br />
operating in low load conditions.<br />
Staging of Compressors<br />
The sequence controller incorporates a maximum number of starts for each compressor stage. This is<br />
factory set to 10 starts per hour for all compressors and must not be raised.<br />
Should plant pressures change rapidly during operation the controller will react accordingly starting and<br />
stopping compressors as required.<br />
Number of starts per hour higher than those above will reduce plant stability, increase power<br />
consumption and lead to reduced component life and possible failure.<br />
Failure to observe these limits will void the compressor warranty.<br />
15<br />
20<br />
25<br />
30<br />
35<br />
Fig 5.<br />
Fig 4.<br />
3
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 4. Maintenance<br />
Issue 3 Page - 14 -<br />
September 2007<br />
4. Maintenance INDEX<br />
Page No’s Issue No<br />
4.1 48 hours operation after Initial Start-up 15 1<br />
4.1.1 Oil Separator Element 15 1<br />
4.1.2 Suction filter elements 15 1<br />
4.1.3 Oil Separator Level 16 1<br />
4.1.4 Liquid Filter Drier / Wetech Indicator 16 1<br />
4.2 Every 3-6 months 17 1<br />
4.3 Every 12 months 17 1<br />
4.4 Suction filters & Compressor Burn out 19 1<br />
4.5 When Necessary 19 1<br />
4.5.1 Changing of Pressure Switches / Transducers 19 1<br />
4.5.2 Replacement of a Compressor 20-21 1<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
4
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 4. Maintenance<br />
Issue 3 Page - 15 -<br />
September 2007<br />
WARNING! The Unit must be Electrically Isolated before Maintenance Work is undertaken<br />
The following routine maintenance is required:<br />
4.1 48 hours operation after Initial Start-up<br />
4.1.1 Oil Separator Element<br />
The oil separator filter element should be changed for the spare filter supplied, as follows :<br />
1. Turn off all Compressor Isolators, 1, 2, and 3, and the Condenser panel Isolator (If fitted).<br />
2. Front seat all compressor discharge valves.<br />
Warning : DO NOT operate any compressor with the Discharge valve shut or blocked.<br />
3. Front seat the separator’s oil return valve.<br />
4. Close the discharge outlet stub’s ball valve.<br />
5. Connect a reclaim/recovery unit from the schraeder on the separator outlet pipe to the Suction<br />
schraeder, and recover any residual gas in the separator.<br />
6. Disconnect the reclaim unit.<br />
7. Undo the 10 bolts on the top of the separator, and remove the separator lid.<br />
4<br />
8. Undo the bolt on the top of the separator element and remove the used element.<br />
9. Install the new separator element ensuring the ‘O’ ring is in place, and replace the securing nut.<br />
10. Replace the separator lid and bolts, and ensure all bolts are tightened.<br />
11. Connect a vacuum pump to the schraeder connection on the separator outlet, and run pump to<br />
remove any air from the separator.<br />
12. Back seat all compressor discharge valves.<br />
13. Open the condenser isolation valve.<br />
Warning : Check all compressor discharge valves are open before proceeding<br />
14. Turn on the Condenser panel isolator (if fitted), and all Compressor panel isolators.<br />
15. Leak test the separator lid.<br />
4.1.2 Suction filter elements<br />
The suction line filter elements should be removed as follows :<br />
1. Turn off all Compressor Isolators, 1, 2 and 3.<br />
2. Front seat all compressor suction valves.<br />
3. Close the pack suction inlet ball valve.<br />
4. Connect a reclaim/recovery unit from the Suction schraeder after the filter to the Liquid line<br />
schraeder, and recover any residual gas in the suction filter and header. Disconnect the reclaim unit.<br />
5. Remove the insulation cover on the end of the filter shell.<br />
6. Undo the central bolt 1 turn on the filter cap, rotate the cap and remove.<br />
7. Remove the filter cage and store safely within the unit for future use. Permanent use of suction line<br />
filters is not recommended due to increased pressure drop and risk of break up after long periods of<br />
operation.<br />
8. Replace the cap and turn until the alignment marks meet, tighten the centre bolt until hand tight, then<br />
tighten one full turn with a spanner.<br />
9. Connect a vacuum pump to the Suction schraeder after the filter, and run to remove air in the filter.<br />
10. Back seat all compressor suction valves.<br />
11. Open the suction inlet ball valve.<br />
Warning : Check all compressor suction valves are open before proceeding<br />
12. Turn on all Compressor Isolators<br />
13. Leak check the suction filter cap connection, and replace the filter insulation cover.<br />
4.1.3 Oil Separator Level<br />
The separator reservoir oil level should be checked and oil added or removed to maintain a level in the<br />
upper sight glass, as described in section 2.12, page 13.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 4. Maintenance<br />
Issue 3 Page - 16 -<br />
September 2007<br />
4.1.4 Liquid Filter Drier / KMC Wetech Moisture Indicator on Receiver Assembly / filter pack<br />
1. Changeover the liquid bypass valve arrangement, Top valve closed, Centre valve open, bottom valve<br />
closed, to divert the refrigerant around the filter drier, see fig 6.<br />
2. Connect a reclaim/recovery unit from the Drier service valve to the Suction schraeder, back seat the<br />
drier service valve and recover any residual gas in the separator. Front seat the drier service valve when<br />
complete.<br />
3. Undo the central bolt 1 turn on the filter cap, rotate the cap and remove<br />
4. Remove the core & cage assembly and unscrew the end.<br />
5. Open the new cores and re-assemble onto the cage.<br />
6. Insert the new core & cage into the drier shell, replacing the holding spring in front of the cage.<br />
7. Replace the cap and turn until the alignment marks meet, tighten the centre bolt until hand tight, then<br />
tighten one full turn.<br />
8. Connect a vacuum pump to the Drier service valve, and run to remove air in the filter. Front seat<br />
the drier service valve when complete, and replace it’s sealing cap.<br />
9. Changeover the liquid bypass valve arrangement, Top Valve open, Centre valve shut, bottom<br />
valve open, to restore the refrigerant flow through the filter.<br />
Warning : The bypass arrangement must not be used for long periods of time as<br />
contaminants and moisture will be allowed to pass through to the rest of the system.<br />
The relative moisture level of the system can be monitored via the KMC (Wetech) detection alarm light<br />
on the main control panel door.<br />
After commissioning the moisture level Alarm light should not illuminate. If the moisture level increases<br />
and the Alarm light illuminates action must be undertaken to reduce system moisture levels.<br />
Fig 6.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
4
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 4. Maintenance<br />
Issue 3 Page - 17 -<br />
September 2007<br />
4.2 Every 3-6 months<br />
The remote condensers should be cleaned to ensure correct operation of the condensing unit. When the<br />
condenser coil is obstructed by dirt or rubbish, the unit will experience high condensing temperatures<br />
which will result in higher running costs, loss of compressor efficiency and ultimately overheating of the<br />
compressor and/or condenser fans.<br />
The pressure drop across all filters should be measured, if above 0.5 Bar the filter elements should be<br />
changed.<br />
The sight glass moisture indicator and Wetech monitor should also be checked, and appropriate action<br />
taken if moisture is shown to be present.<br />
Warning : Safety Goggles must be worn when<br />
inspecting or changing any pressure device.<br />
The pressure relief valves and burst discs should be<br />
inspected for any pressure release.<br />
All burst discs are fitted with indicator gauges, and will<br />
show system pressure if a release has occurred, see Fig 7.<br />
Suction PRV’s should be manually inspected for a release.<br />
Rupture Disc<br />
Intact, No Release<br />
(Needle at zero)<br />
Rupture Disc blown,<br />
Release has occurred<br />
(Needle in Red band)<br />
If a release has occurred or there is a requirement by the<br />
customer maintenance schedule the relief valves and burst discs should be changed.<br />
Main receiver and suction relief devices are connected via a changeover valve.<br />
The changeover valve should be ‘back’ seated to the side requiring maintenance, the burst disc and/or<br />
pressure relief valve can then be changed.<br />
Warning : Beware of any residual refrigerant charge when removing PRV’s and Burst Discs,<br />
Safety Goggles and Gloves must be worn.<br />
The pressure relief valve and burst disc on the liquid filter bypass arrangement should be changed in a<br />
similar fashion to the liquid filter cores, by first putting the liquid path into bypass, then reclaiming any<br />
refrigerant. See section 4.1.4, p18 for further details.<br />
A suitable thread sealant should be applied when fitting replacement equipment. Care must be taken<br />
when tightening the replacement parts, by always using two spanners in a ‘scissor’ motion on the correct<br />
area of the parts. Any replacement parts used must be of an equivalent specification and compliant with<br />
applicable EC Directives.<br />
Note : All PRV’s and Bursting Discs MUST be changed every 3 years , whether they have<br />
vented or not.<br />
4.3 Every 12 months<br />
Check security of fixings, especially fans, motor and compressor mountings.<br />
Check fan motors (fans should rotate freely).<br />
Check refrigerant pipeline for damage and leaks.<br />
Check tightness of all screwed components, including compressor service valves, component service<br />
valves, and all pressure switch connections and hoses.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Fig 7.<br />
4
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 4. Maintenance<br />
Issue 3 Page - 18 -<br />
September 2007<br />
4.4 In the event of Compressor Burn out<br />
If suction line burn out filters are used they must not be left in the system indefinitely, as the pressure<br />
drop across the filter will impair the system performance.<br />
The oil separator element and liquid filter cores should also be replaced.<br />
4.5 When Necessary<br />
Additional maintenance in accordance with customer specifications may also be required.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 4. Maintenance<br />
Issue 3 Page - 19 -<br />
September 2007<br />
4.5.2 Changing of Control Pressure Switches and Transducers<br />
Should any pressure switch or transducer require changing follow the procedures below.<br />
Main Dual HP/LP Pressure Switch<br />
1. Turn off all panel isolators including, common controls, condenser and all compressor panel isolators.<br />
Warning : Safety Goggles and Gloves must be worn whilst changing pressure switches.<br />
Ensure the electrical supply to the component is isolated before commencing. Do not allow<br />
any compressor or the condenser to operate when any control switch is removed.<br />
2. The Dual pressure switch hoses are fitted to a schraeder connection on the pipework end only.<br />
Remove the relevant 1/4" connection from this end first, using two spanners in a ‘scissor’ motion, one on<br />
the schraeder fitting and one on the 1/4" connection.<br />
Warning : Do not disconnect the pressure hose at the switch end first, as this will vent<br />
refrigerant.<br />
3. The dual pressure switch may now be removed, and the hose connections at the switch end<br />
disconnected using 2 spanners in a ‘scissor’ motion.<br />
4<br />
4. Fit and wire in the Dual new pressure switch, ensuring the wiring is correct,<br />
see wiring diagrams on pages 23 and onwards for further details.<br />
5. Oil the cone fittings of the pressure hoses.<br />
6. Reconnect the pressure hose connections at the pressure switch end first using 2 spanners in a<br />
‘scissor’ motion.<br />
7. Reconnect the pressure hose connection at the pipework end, using 2 spanners in a scissor motion.<br />
This connection must be made rapidly to prevent loss of refrigerant.<br />
7. Open the 3/8” Liquid line and 1/2" Suction line shut off valves.<br />
8. Leak test the connection to the replaced switch.<br />
9. Ensure all wiring work undertaken is correct.<br />
10. Turn on all compressor isolators and condenser isolators to return the unit to normal operation.<br />
Compressor Pressure Switches & Transducers<br />
1. Turn off the relevant panel isolators, common controls, condenser and/or compressor panel isolators.<br />
Warning : Safety Goggles and Gloves must be worn whilst changing pressure switches.<br />
Ensure the electrical supply to the component is isolated before commencing. Do not allow<br />
any compressor or the condenser to operate when any control switch is removed.<br />
2. All pressure switches are fitted to a schraeder connection directly on the compressor body. Remove<br />
the relevant pressure switch 1/4" connection using two spanners in a ‘scissor’ motion, one on the<br />
schraeder fitting and one on the Hex part of the switch or transducer.<br />
All transducers are connected via a flexible pressure hose to a common HP or LP manifold.<br />
Unscrew the pressure hose at the manifold end first to isolate the line from the system, then unscrew<br />
the transducer from the 1/4" flare union.<br />
Note : When removing a pressure switch from the compressor body take care not to unscrew the 1/8”<br />
NPT to 1/4" flare adapter beneath the switch connection.<br />
3. Wire in the new pressure switch or transducer, ensuring the wiring is correct,<br />
see wiring diagrams on page 35 onwards for further details.<br />
Warning : Transducers will be irrevocably damaged if wired incorrectly.<br />
4. Oil the cone fittings of the replacement part.<br />
5. Reconnect the pressure switch or transducer to the correct schraeder connection using 2 spanners in<br />
a ‘scissor’ motion. For switches with fixed leads, rotate them 3 turns anticlockwise before fitting, so the<br />
wires are untangled when fitted.<br />
8. Leak test the connection to the replaced switch.<br />
9. Ensure all wiring work undertaken is correct.<br />
10. Turn on all compressor isolators and condenser isolators to return the unit to normal operation.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 4. Maintenance<br />
Issue 3 Page - 20 -<br />
September 2007<br />
4.5.3 Replacement of a Compressor<br />
In the unlikely event that a compressor needs changing, the following procedure should be followed :<br />
Warning : Compressors are heavy, adequate provision must be made for their lifting<br />
without risk to personnel, manual lifting/handling should be avoided.<br />
Ensure the compressor electrical supply is isolated before commencing work.<br />
Any oil spillage must be cleaned up immediately.<br />
Before commencing work familiarise all personnel with the operating instructions supplied with the<br />
compressor, and read the relevant wiring diagrams. If in any doubt consult the equipment supplier via<br />
the approved escalation procedure.<br />
1. Turn off the relevant compressor isolator, and ensure it is secured from accidental re-connection.<br />
The rest of the unit may operate as normal<br />
2. Ensure the faulty compressor suction and discharge service valves are Back seated.<br />
4<br />
3. Connect a Recovery/Reclaim unit from the compressor suction and discharge service ports to the<br />
main suction header schraeder.<br />
4. Front seat the compressor suction and discharge service valves, and the relevant oil return hose<br />
shut off valve.<br />
5. Remove the Traxoil level regulator solenoid coil, and use a magnet to open the solenoid valve.<br />
6. Recover any residual refrigerant in the compressor.<br />
7. Ensure the electrical supply to the compressor is isolated, and open the compressor terminal box.<br />
8. Make note of the connections for future reference, also read the relevant wiring diagrams in section 6.<br />
9. Ensure the electrical supply to the compressor is isolated, and remove all electrical connections from<br />
the main junction box.<br />
10. Unscrew the plastic ‘Kopex’ conduit back nuts in the terminal box connecting to the main control<br />
panel and remove the Kopex and wiring. Leave other Kopex’s and wiring connected until the compressor<br />
is removed.<br />
11. Unscrew the compressor mounting feet top nuts.<br />
12. Unscrew the compressor Discharge and Suction valve rotalock connection, or remove the valve from<br />
the compressor body and ease the compressor pipework away ready for removal.<br />
13. Remove any Magnet fitted to the Traxoil regulator solenoid, and disconnect the oil return line from<br />
the Traxoil regulator’s inlet connection, sealing both connections to avoid oil spillage.<br />
14. Remove HP/LP pressure switches, and the oil pressure sensor if fitted.<br />
Note : Identify the switches before removal, ie. with tape or labels, to simplify replacement.<br />
14. Using a suitable lifting method, lift the compressor above its mounting feet and then out from the<br />
frame.<br />
15. Remove the compressor from the unit to a safe working area.<br />
16. Remove the remaining accessories from the compressor and replace onto the new compressor,<br />
ensuring all connections are made in an identical fashion.<br />
All taper thread connections should be made using a suitable thread sealant.<br />
Tip the compressor away from the oil connection before removing the Traxoil level regulator to minimise<br />
oil loss or spillage.<br />
Warning :<br />
The compressor is charged with Polyolester oil, DO NOT leave it open to atmosphere.<br />
17. Ensure the new compressor terminal box lid is fitted. Open up the required connection holes in the<br />
terminal box, it is recommended that a hole saw is used instead of a hammer to avoid damage to the<br />
box.<br />
18. Important : Re-use the mounting feet on the frame, if the replacement compressor is supplied with<br />
different mounting feet to the original’s DO NOT use the new parts. Observe the correct layout and<br />
usage of any components.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 4. Maintenance<br />
Issue 3 Page - 21 -<br />
September 2007<br />
19. Using a suitable lifting method, lift the compressor into the unit and onto the frame, ensure the<br />
mounting feet locate correctly.<br />
20. Fit and tighten the mounting feet fixings as shown in section 2.1 page 11.<br />
21. Replace any gaskets removed with new gaskets supplied with the compressor. Most gaskets do not<br />
need oiling, check with the compressor literature.<br />
22. Replace the pipework connections, and tighten to the correct torque, see compressor literature.<br />
23. Replace the oil return line to the Traxoil level regulator.<br />
24. Replace the compressor HP/LP pressure switches and oil pressure sensor if fitted.<br />
23. Re-fit the remaining Kopex’s to the terminal box, ensuring all gland back nuts are replaced.<br />
24. Re-wire all remaining connections to the terminal box, following the appropriate wiring diagrams.<br />
25. Check all wiring connections for continuity and check compressor earth bonding.<br />
26. Connect a vacuum pump to the compressor suction and discharge service valves, and run to draw a<br />
vacuum below 225 microns (0.3 mbar). The pump should be isolated and the pressure monitored. A<br />
rapid continuous rise could indicate a leak in the system.<br />
27. Isolate, and remove the vacuum pump.<br />
4<br />
28. When satisfied that all components and connections have been made correctly back seat the<br />
compressor suction and discharge valves.<br />
29. Turn on the compressor isolator and ensure it starts and runs correctly.<br />
30. Leak test all connections.<br />
Warning :<br />
If the removed compressor has ‘burnt-out’ an acid test must be performed on the<br />
refrigerant and oil. If the system is acidic appropriate action must be taken immediately to<br />
prevent further damage to components.<br />
The failed compressor must be sealed from atmosphere and if covered under warranty,<br />
returned to the supplier for warranty purposes. It is recommended that spare valves, sight<br />
glasses etc. from the new compressor be used to seal the faulty compressor, other methods<br />
may not ensure proper sealing.<br />
Leaving a compressor open to atmosphere will invalidate its warranty.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 5. Guarantee<br />
5. Guarantee<br />
The standard supplier guarantee covers the unit from date of delivery as follows :<br />
Compressors : 2 years<br />
All other components : 1 Year<br />
Issue 3 Page - 22 -<br />
September 2007<br />
Warranty matters should be resolved with the supplier as per the Standard Conditions of Sale.<br />
Failure to install, set up or put to work any part of the equipment in a manner specified in<br />
this manual could invalidate the guarantees set out in the <strong>Searle</strong> standard Terms and<br />
Conditions of Sale.<br />
Adjustment of settings outside Operating Limits in section 3 will invalidate warranty.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
5
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
Issue 3 Page - 23 -<br />
September 2007<br />
6. Wiring Diagrams<br />
Note : The wiring diagrams in this document cover all versions of the <strong>MSP</strong> packs, some drawings include extra details for the MSHP housed<br />
packs such as lights etc. or are different for the <strong>MSP</strong>L split pack, dedicated wiring diagrams are shown below where relevant.<br />
Ref Plant Details Drawing Description 050 060 080 100 Page<br />
1 <strong>MSP</strong>-050-670-<strong>INV</strong>.01.drg <strong>MSP</strong>050-<strong>INV</strong> : Plant Details x 24<br />
2 <strong>MSP</strong>-060-670-<strong>INV</strong>.01.drg <strong>MSP</strong>060-<strong>INV</strong> : Plant Details x 25<br />
3 <strong>MSP</strong>-080-670-<strong>INV</strong>.01.drg <strong>MSP</strong>080-<strong>INV</strong> : Plant Details x 26<br />
4 <strong>MSP</strong>-100-670-<strong>INV</strong>.01.drg <strong>MSP</strong>100-<strong>INV</strong> : Plant Details x 27<br />
Ref Main supply tails Drawing Description 050 060 080 100 Page<br />
5 <strong>MSP</strong>-050-600-<strong>INV</strong>.01.drg Main Supply Tails : <strong>MSP</strong>050/100-<strong>INV</strong> x x x x 28<br />
Ref Compressor Start Panels Schematics Drawing Description 050 060 080 100 Page<br />
6 <strong>MSP</strong>-050-611D-<strong>INV</strong>.01.drg Comp 1 SCH (<strong>INV</strong>) - <strong>MSP</strong>050-100-<strong>INV</strong> x x x x 29<br />
7 <strong>MSP</strong>-050-612D-<strong>INV</strong>.01.drg Comp 2 DOL Schematic - <strong>MSP</strong>050/060-<strong>INV</strong> x x 30<br />
8 <strong>MSP</strong>-050-613P-<strong>INV</strong>.01.drg Comp 3 PWS Schematic - <strong>MSP</strong>050/060-(<strong>INV</strong>) x x 31<br />
9 <strong>MSP</strong>-080-612P-<strong>INV</strong>.01.drg Comp2 PWS(OFF/L) - <strong>MSP</strong>080-<strong>INV</strong> x 32<br />
10 <strong>MSP</strong>-080-613P-<strong>INV</strong>.01.drg Comp 3 PWS Schematic - <strong>MSP</strong>080/100-(<strong>INV</strong>) x x 33<br />
11 <strong>MSP</strong>-100-612P-<strong>INV</strong>.01.drg Comp2 PWS(OFF/L) - <strong>MSP</strong>100-<strong>INV</strong> x 34<br />
Ref Common controls Schematics Drawing Description 050 060 080 100 Page<br />
13 <strong>MSP</strong>-050-631-<strong>INV</strong>.01.drg Common Ctrls Sht 1 - <strong>MSP</strong>50-<strong>INV</strong> (Standard) x x x x 35<br />
14 <strong>MSP</strong>-050-632-<strong>INV</strong>.01.drg Common Ctrls Sht 2 - <strong>MSP</strong>050-<strong>INV</strong> (Standard) x x x x 36<br />
15 <strong>MSP</strong>L-050-631-<strong>INV</strong>.01.drg Common Ctrls Sht 1– <strong>MSP</strong>L-050-<strong>INV</strong> (Split) x x x x 37<br />
16 <strong>MSP</strong>L-050-632-<strong>INV</strong>.01.drg Common Ctrls Sht 2– <strong>MSP</strong>L-050-<strong>INV</strong> (Split) x x x x 38<br />
17 MSHP-050-631-<strong>INV</strong>.01.drg Common Ctrls Sht 1– MSHP-050-<strong>INV</strong> (Housed) x x x x 39<br />
18 MSHP-050-632-<strong>INV</strong>.01.drg Common Ctrls Sht 2– MSHP-050-<strong>INV</strong> (Housed) x x x x 40<br />
Ref Compressor panels layouts Drawing Description 050 060 080 100 Page<br />
20<br />
21<br />
22<br />
<strong>MSP</strong>-050-621D-<strong>INV</strong>.01.drg<br />
<strong>MSP</strong>-050-622D-<strong>INV</strong>.01.drg<br />
<strong>MSP</strong>-050-623P-<strong>INV</strong>.01.drg<br />
Comp 1 DOL Layout: <strong>MSP</strong>050/080-<strong>INV</strong><br />
Comp 2 DOL Layout: <strong>MSP</strong>050-<strong>INV</strong><br />
Comp 3 PWS Layout: <strong>MSP</strong>050-<strong>INV</strong><br />
x<br />
x<br />
x<br />
x x 41<br />
6 42<br />
43<br />
23 <strong>MSP</strong>-060-622D-<strong>INV</strong>.01.drg Comp 2 DOL Layout: <strong>MSP</strong>060-<strong>INV</strong> x 44<br />
24 <strong>MSP</strong>-060-623P-<strong>INV</strong>.01.drg Comp 3 PWS Layout: <strong>MSP</strong>060/080-<strong>INV</strong> x x 45<br />
25 <strong>MSP</strong>-080-622P-<strong>INV</strong>.01.drg Comp 2 PWS Layout: <strong>MSP</strong>080-<strong>INV</strong> x 46<br />
26 <strong>MSP</strong>-100-621D-<strong>INV</strong>.01.drg Comp 1 DOL Layout: <strong>MSP</strong>-100-<strong>INV</strong> x 47<br />
27 <strong>MSP</strong>-100-622P-<strong>INV</strong>.01.drg Comp 2 PWS Layout: <strong>MSP</strong>100-<strong>INV</strong> x 48<br />
28 <strong>MSP</strong>-100-623P-<strong>INV</strong>.01.drg Comp 3 PWS Layout: <strong>MSP</strong>100-<strong>INV</strong> x 49<br />
Ref Common Controls Layout Diagrams Drawing Description 050 060 080 100 Page<br />
29 <strong>MSP</strong>-050-634-<strong>INV</strong>.01.drg Common Ctrls Layout : <strong>MSP</strong>-<strong>INV</strong> (Standard) x x x x 50<br />
30 <strong>MSP</strong>L-050-634-<strong>INV</strong>.01.drg Common Ctrls Layout : <strong>MSP</strong>L-<strong>INV</strong> (Split) x x x x 51<br />
31 MSHP-080-363-<strong>INV</strong>.01.drg Common Ctrls Layout : MSHP080-<strong>INV</strong> (Housed) x x x x 52<br />
Ref Controller Settings Drawing Description 050 060 080 100 Page<br />
34 <strong>MSP</strong>-050-630-<strong>INV</strong>.01.drg RDM Pack & Condenser ctrl <strong>MSP</strong>050-<strong>INV</strong> x 53<br />
35 <strong>MSP</strong>-060-630-<strong>INV</strong>.01.drg RDM Pack & Condenser ctrl <strong>MSP</strong>060-<strong>INV</strong> x 54<br />
36 <strong>MSP</strong>-080-630-<strong>INV</strong>.01.drg RDM Pack & Condenser ctrl <strong>MSP</strong>080-<strong>INV</strong> x 55<br />
37 <strong>MSP</strong>-100-630-<strong>INV</strong>.01.drg RDM Pack & Condenser ctrl <strong>MSP</strong>100-<strong>INV</strong> x 56<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
<strong>MSP</strong>050-<strong>INV</strong> PLANT ELECTRICAL DETAILS<br />
MB2 RATING<br />
FLA STARTING MB1 RATING<br />
MODEL<br />
10 TO 16A<br />
DOL<br />
9.2A<br />
4FC-3.2Y<br />
COMPRESSOR 1<br />
10 TO 16A<br />
DOL<br />
10.7A<br />
4EC-4.2Y<br />
COMPRESSOR 2<br />
10 TO 16A<br />
10 TO 16A<br />
PWS<br />
21A<br />
4PCS-10.2Y<br />
COMPRESSOR 3<br />
TOTAL FLA 40.9A<br />
Issue 3 Page - 24 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>050-<strong>INV</strong><br />
01<br />
<strong>MSP</strong>050-<strong>INV</strong> : PLANT DETAILS<br />
<strong>MSP</strong>-050-670-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
29/06/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
NS<br />
NS<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
<strong>MSP</strong>060-<strong>INV</strong> PLANT ELECTRICAL DETAILS<br />
MB2 RATING<br />
FLA STARTING MB1 RATING<br />
MODEL<br />
10 TO 16A<br />
DOL<br />
10.7A<br />
4EC-4.2Y<br />
COMPRESSOR 1<br />
10 TO 16A<br />
DOL<br />
13.5A<br />
4DC-5.2Y<br />
COMPRESSOR 2<br />
10 TO 16A<br />
10 TO 16A<br />
PWS<br />
24A<br />
4NCS-12.2Y<br />
COMPRESSOR 3<br />
TOTAL FLA 48.2A<br />
Issue 3 Page - 25 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>060-<strong>INV</strong><br />
01<br />
<strong>MSP</strong>060-<strong>INV</strong> : PLANT DETAILS<br />
<strong>MSP</strong>-060-670-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
29/06/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
NS<br />
NS<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
<strong>MSP</strong>080-<strong>INV</strong> PLANT ELECTRICAL DETAILS<br />
MB2 RATING<br />
FLA STARTING MB1 RATING<br />
MODEL<br />
10 TO 16A<br />
DOL<br />
13.5A<br />
4DC-5.2Y<br />
COMPRESSOR 1<br />
10 TO 16A<br />
10 TO 16A<br />
PWS<br />
21A<br />
4PCS-10.2Y<br />
COMPRESSOR 2<br />
10 TO 16A<br />
10 TO 16A<br />
PWS<br />
27A<br />
4J-13.2Y<br />
COMPRESSOR 3<br />
TOTAL FLA 61.5A<br />
Issue 3 Page - 26 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>080-<strong>INV</strong><br />
01<br />
<strong>MSP</strong>080-<strong>INV</strong> : PLANT DETAILS<br />
<strong>MSP</strong>-080-670-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
29/06/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
NS<br />
NS<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
<strong>MSP</strong>100-<strong>INV</strong> PLANT ELECTRICAL DETAILS<br />
MB2 RATING<br />
FLA STARTING MB1 RATING<br />
MODEL<br />
16 TO 20A<br />
DOL<br />
15.9A<br />
4CC-6.2Y<br />
COMPRESSOR 1<br />
10 TO 16A<br />
10 TO 16A<br />
PWS<br />
27A<br />
4J-13.2Y<br />
COMPRESSOR 2<br />
16 TO 20A<br />
16 TO 20A<br />
PWS<br />
37A<br />
4G-20.2Y<br />
COMPRESSOR 3<br />
TOTAL FLA 79.9A<br />
Issue 3 Page - 27 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>100-<strong>INV</strong><br />
01<br />
<strong>MSP</strong>100-<strong>INV</strong> : PLANT DETAILS<br />
<strong>MSP</strong>-100-670-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
29/06/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
NS<br />
NS<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
COMPRESSOR 1<br />
1L1<br />
1L2<br />
1L3<br />
1N1<br />
1PE<br />
2L1<br />
2L2<br />
COMPRESSOR 2<br />
2L3<br />
2N1<br />
2PE<br />
3L1<br />
3L2<br />
COMPRESSOR 3<br />
3L3<br />
3N1<br />
3PE<br />
INCOMING SUPPLIES<br />
Issue 3 Page - 28 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
6L1<br />
6N1<br />
6PE<br />
COMMON CONTROLS<br />
7L1<br />
7N1<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
01<br />
<strong>MSP</strong>-(050 to 100)-620-<strong>INV</strong><br />
MAIN SUPPLY TAILS: <strong>MSP</strong>050/100-<strong>INV</strong><br />
<strong>MSP</strong>-050-600-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
15/03/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
3 Core Screened<br />
696<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Tw/Pr<br />
Inv Cntls to Common Controls Sheet 2<br />
692<br />
Tw/Pr<br />
695<br />
102<br />
628<br />
100<br />
600<br />
112<br />
611<br />
ISOLATOR<br />
Aux<br />
101<br />
606<br />
101<br />
61<br />
13<br />
Brn<br />
Blk<br />
Grey<br />
11<br />
12<br />
1L1<br />
1L2<br />
13<br />
1L3<br />
1MS1/1<br />
61<br />
14<br />
Blu<br />
1N1<br />
101<br />
112<br />
1CB1<br />
4A<br />
1MS1<br />
5<br />
9<br />
101<br />
6<br />
1R1/1<br />
62<br />
1R2/1<br />
9<br />
1<br />
5<br />
10<br />
1R2/2<br />
3<br />
1R2/3<br />
190<br />
100<br />
Blu<br />
62<br />
11<br />
63<br />
3 Core Screened<br />
16<br />
15<br />
14<br />
108<br />
Issue 3 Page - 29 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Tw/Pr<br />
Tw/Pr<br />
102<br />
110<br />
109<br />
101<br />
13<br />
108<br />
1Pl2/Skt2 3<br />
1Pl2/Skt2 2<br />
1Pl2/Skt2 1<br />
1Pl1/Skt1 3<br />
1Pl1/Skt1 2<br />
1Pl1/Skt1 1<br />
1R2<br />
1R1<br />
190<br />
14<br />
R<br />
G G<br />
696<br />
692<br />
695<br />
100<br />
Scrn<br />
Clr<br />
Blk<br />
Red<br />
Blk<br />
Red<br />
TRIP<br />
1R1<br />
TRIP<br />
RELAY<br />
Blk<br />
Red<br />
RUN<br />
RELAY<br />
RUN<br />
SUPPLY<br />
HEALTHY<br />
18<br />
27<br />
12<br />
55<br />
53<br />
50<br />
05<br />
04<br />
69<br />
68<br />
Fault 0-5V Inv Run<br />
RS485<br />
Compressor<br />
Box<br />
Terminals<br />
106<br />
105<br />
104<br />
N<br />
<strong>Inverter</strong><br />
Connections<br />
1 2 3 4 5 7 8 9<br />
U V W<br />
L1 L2L3<br />
108<br />
Blk<br />
Brn<br />
Blu<br />
Blu<br />
Brn<br />
N<br />
63<br />
107<br />
Cabling 0.75mm & 1mm<br />
61-69 Brown 230V AC functions<br />
Blue Neutral<br />
100 White 24V 50Hz 0V<br />
101- 149 Violet 24V 50Hz<br />
190,196 Twisted Pair (Inv Control)<br />
192 Small 3 Core Screened<br />
N<br />
62<br />
R Mp 1 2 12 11 14 B1 B2<br />
LP Safety<br />
TRAXOIL<br />
HP Safety<br />
3~ M<br />
THERMISTOR INT69 VS<br />
CRANKCASE<br />
HEATER<br />
COMPRESSOR<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
02<br />
COMP 1 SCH (<strong>INV</strong>) - <strong>MSP</strong>050/100-<strong>INV</strong><br />
02 692 & 696 CORRECTED<br />
N/A 01/08/06<br />
<strong>MSP</strong>-050-611D-<strong>INV</strong>.02<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
202<br />
629<br />
200<br />
600<br />
212<br />
612<br />
ISOLATOR<br />
Aux<br />
201<br />
607<br />
201<br />
71<br />
13<br />
Brn<br />
Blk<br />
Grey<br />
21<br />
22<br />
2L1<br />
2L2<br />
23<br />
2L3<br />
71<br />
14<br />
2MS1<br />
Blu<br />
2N1<br />
203<br />
201<br />
212<br />
2CB1<br />
4A<br />
2MS1<br />
201<br />
3<br />
201<br />
4<br />
13<br />
2R1/1<br />
72<br />
2R2/1<br />
3<br />
2<br />
4<br />
14<br />
2K1/2<br />
21<br />
2K1/1<br />
200<br />
203<br />
Blu<br />
72<br />
22<br />
208<br />
73<br />
Issue 3 Page - 30 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
211<br />
210<br />
208<br />
2Pl2/Skt2 3<br />
2Pl2/Skt2 2<br />
2Pl2/Skt2 1<br />
2Pl1/Skt1 7<br />
2Pl1/Skt1 6<br />
2Pl1/Skt1 5<br />
2K1<br />
202<br />
209<br />
201<br />
26<br />
25<br />
24<br />
2R2<br />
2K1<br />
2R1<br />
R<br />
G G<br />
200<br />
2Pl/Skt1 1-4<br />
CONTACTOR<br />
TRIP<br />
2R1<br />
TRIP<br />
RELAY<br />
26<br />
25<br />
24<br />
E<br />
RUN<br />
RELAY<br />
RUN<br />
SUPPLY<br />
HEALTHY<br />
Compressor<br />
Box<br />
Terminals<br />
206<br />
205<br />
204<br />
N<br />
1 2 3 4 5 7 8 9<br />
208<br />
207<br />
Blk<br />
Brn<br />
Blu<br />
Blu<br />
Brn<br />
N<br />
73<br />
Cabling 0.75mm & 1mm<br />
71-79 Brown 230V AC functions<br />
Blue Neutral<br />
200 White 24V 50Hz 0V<br />
201- 249 Violet 24V 50Hz<br />
N<br />
72<br />
R Mp 1 2 12 11 14 B1 B2<br />
3~ M<br />
LP Safety<br />
TRAXOIL<br />
HP Safety<br />
COMPRESSOR<br />
THERMISTOR INT69 VS<br />
CRANKCASE<br />
HEATER<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
01<br />
COMP 2 DOL SCHEMATIC - <strong>MSP</strong>050/060-<strong>INV</strong><br />
<strong>MSP</strong>-050-612D-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
11/02/04 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
302<br />
630<br />
300<br />
600<br />
312<br />
613<br />
ISOLATOR<br />
Aux<br />
301<br />
608<br />
13<br />
313<br />
13<br />
301<br />
301<br />
4<br />
3R2/1<br />
3<br />
301<br />
312<br />
31 Brn 81<br />
32 Blk<br />
33Grey<br />
Blu<br />
81<br />
3MS1 3MS2<br />
3CB1<br />
4A<br />
3L1<br />
3L2<br />
3L3<br />
14<br />
3MS2<br />
14<br />
3MS1<br />
3N1<br />
303<br />
403<br />
3<br />
13<br />
201<br />
3R1/1<br />
82<br />
311<br />
2<br />
4<br />
14<br />
3K1/2<br />
83<br />
21<br />
3k1/1<br />
300<br />
303<br />
Blu<br />
308<br />
82<br />
22<br />
83<br />
3K1/4<br />
84<br />
Issue 3 Page - 31 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
308<br />
311<br />
310<br />
3Pl2/Skt2 3<br />
3Pl2/Skt2 2<br />
3Pl2/Skt2 1<br />
3Pl1/Skt1 7<br />
3Pl1/Skt1 6<br />
3Pl1/Skt1 5<br />
3K1<br />
3K1<br />
302<br />
314<br />
309<br />
301<br />
3R1<br />
39<br />
38<br />
37<br />
36<br />
35<br />
34<br />
3R2<br />
3K1<br />
3K2<br />
3Pl1/Skt1 1-7<br />
R<br />
G G<br />
300<br />
RUN<br />
RELAY<br />
CONTACTOR<br />
CONTACTOR<br />
TRIP<br />
RUN<br />
SUPPLY<br />
HEALTHY<br />
TRIP<br />
RELAY<br />
39<br />
38<br />
37<br />
36<br />
35<br />
34<br />
E<br />
Compressor<br />
Box<br />
Terminals<br />
306<br />
305<br />
304<br />
N<br />
1 2 3 4 5 7 8 9<br />
308<br />
307<br />
Blk<br />
Brn<br />
Blu<br />
Blu<br />
Brn<br />
N<br />
83<br />
304<br />
303<br />
N<br />
82<br />
Cabling 0.75mm & 1mm<br />
81-89 Brown 230V AC functions<br />
Blue Neutral<br />
300 White 24V 50Hz 0V<br />
301-349 Violet 24V 50Hz<br />
R Mp 1 2 12 11 14 B1 B2<br />
1U1 2U1<br />
37<br />
38<br />
1V1 M 2V1<br />
1W1 2W1<br />
39<br />
E<br />
34<br />
35<br />
36<br />
LP Safety<br />
TRAXOIL<br />
HP Safety<br />
THERMISTOR INT69 VS<br />
CRANKCASE<br />
HEATER<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
02<br />
COMP 3 PWS SCH - <strong>MSP</strong>050/060-<strong>INV</strong><br />
02 3K2 CONTACTOR COIL ADDED<br />
N/A 19/7/06<br />
<strong>MSP</strong>-050-613P-<strong>INV</strong>.02<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
214<br />
630<br />
202<br />
629<br />
200<br />
600<br />
212<br />
612<br />
ISOLATOR<br />
Aux<br />
201<br />
607<br />
4<br />
71<br />
13<br />
213<br />
13<br />
201<br />
2R2/1<br />
Brn<br />
Blk<br />
Grey<br />
3<br />
216 201<br />
21<br />
22<br />
2L1<br />
2L2<br />
23<br />
2L3<br />
71<br />
14<br />
2MS2<br />
14<br />
2MS1<br />
Blu<br />
2N1<br />
203<br />
201<br />
212<br />
2MS1 2MS2<br />
2CB1<br />
4A<br />
3<br />
53<br />
201<br />
83<br />
2R1/1<br />
72<br />
217<br />
2K1/3<br />
2<br />
4<br />
54<br />
2K1/2<br />
2<br />
84<br />
21<br />
21<br />
2R3/1<br />
2k2/1<br />
2k1/1<br />
210<br />
3<br />
209<br />
200<br />
203<br />
Blu<br />
72<br />
22<br />
Issue 3 Page - 32 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
8 8<br />
2R2 2R3<br />
1 1<br />
215<br />
8<br />
3R1<br />
210<br />
2Pl3/Sk3 3<br />
2Pl2/Skt2 5 Blu<br />
22<br />
2Pl2/Skt2 4 74<br />
73<br />
2Pl3/Sk3 2<br />
2Pl3/Sk3 1<br />
2Pl2/Skt2 3<br />
2Pl2/Skt2 2<br />
2Pl2/Skt2 1<br />
2K2<br />
2K1<br />
214<br />
202<br />
A1 A1<br />
2K2 2K1<br />
A2 A2<br />
216<br />
217<br />
211<br />
201<br />
2Pl3/Sk3 4<br />
29<br />
28<br />
27<br />
26<br />
25<br />
24<br />
2Pl1/Skt1 1-7<br />
R<br />
G G<br />
1<br />
300<br />
No Connection<br />
To Compressor<br />
LOAD<br />
RELAY<br />
RUN<br />
RELAY<br />
CONTACTORS<br />
TRIP<br />
RUN<br />
SUPPLY<br />
HEALTHY<br />
3R1<br />
TRIP<br />
RELAY<br />
29<br />
28<br />
27<br />
26<br />
25<br />
24<br />
E<br />
210<br />
206<br />
205<br />
204<br />
N<br />
Compressor<br />
Box<br />
Terminals<br />
3<br />
11<br />
1 2 3 4 6 8 9 10<br />
209<br />
208<br />
207<br />
Blk<br />
Brn<br />
Blu<br />
Brn<br />
Blu<br />
N<br />
73<br />
204<br />
203<br />
N<br />
72<br />
Cabling 0.75mm & 1mm<br />
71-79 Brown 230V AC functions<br />
Blue Neutral<br />
200 White 24V 50Hz 0V<br />
201-249 Violet 24V 50Hz<br />
R Mp 1 2 12 11 14 B1 B2<br />
Off Loader<br />
1U1 2U1<br />
27<br />
28<br />
1V1 M 2V1<br />
1W1 2W1<br />
29<br />
E<br />
24<br />
25<br />
26<br />
LP Safety<br />
TRAXOIL<br />
HP Safety<br />
THERMISTOR INT69 VS<br />
CRANKCASE<br />
HEATER<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
02<br />
COMP2 PWS(OFF/L) - <strong>MSP</strong>080-<strong>INV</strong><br />
<strong>MSP</strong>-080-612P-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
302<br />
630<br />
300<br />
600<br />
312<br />
613<br />
ISOLATOR<br />
Aux<br />
301<br />
608<br />
81<br />
301<br />
4<br />
13<br />
313<br />
13<br />
301<br />
Brn<br />
Blk<br />
Grey<br />
31<br />
32<br />
3L1<br />
3L2<br />
33<br />
3L3<br />
81<br />
Blu<br />
3R2/1<br />
14<br />
3MS2<br />
14<br />
3MS1<br />
3N1<br />
3<br />
303<br />
301<br />
312<br />
3MS1 3MS2<br />
3CB1<br />
4A<br />
13<br />
301<br />
3<br />
13<br />
301<br />
3R1/1<br />
82<br />
13<br />
14<br />
3K2/2<br />
2<br />
4<br />
14<br />
3K1/2<br />
21<br />
3k1/1<br />
309<br />
300<br />
3K2/1<br />
300<br />
303<br />
Blu<br />
14<br />
84<br />
82<br />
22<br />
83<br />
Issue 3 Page - 33 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
309<br />
311<br />
310<br />
3Pl2/Skt2 3<br />
3Pl2/Skt2 2<br />
3Pl2/Skt2 1<br />
3Pl2/Skt2 3<br />
3Pl2/Skt2 2<br />
3Pl2/Skt2 1<br />
3K1<br />
3K1<br />
302<br />
313<br />
314<br />
301<br />
3Pl2/Skt2 5<br />
3Pl2/Skt2 4<br />
3R1<br />
39<br />
38<br />
37<br />
36<br />
35<br />
34<br />
3R2<br />
3K1<br />
3K2<br />
3Pl1/Skt1 1-7<br />
R<br />
G G<br />
300<br />
RUN<br />
RELAY<br />
CONTACTORS<br />
TRIP<br />
RUN<br />
SUPPLY<br />
HEALTHY<br />
TRIP<br />
RELAY<br />
39<br />
38<br />
37<br />
36<br />
35<br />
34<br />
E<br />
306<br />
305<br />
304<br />
N<br />
13<br />
12<br />
11<br />
1 2 3 4 6 8 9 10<br />
309<br />
308<br />
307<br />
Blk<br />
Brn<br />
Blu<br />
Brn<br />
N<br />
73<br />
N<br />
84<br />
Blu<br />
304<br />
303<br />
N<br />
82<br />
Cabling 0.75mm & 1mm<br />
81-89 Brown 230V AC functions<br />
Blue Neutral<br />
300 White 24V 50Hz 0V<br />
301-349 Violet 24V 50Hz<br />
Orn<br />
Blk<br />
Brn<br />
Red<br />
R Mp 1 2 12 11 14 B1 B2<br />
1U1 2U1<br />
37<br />
38<br />
1V1 M 2V1<br />
1W1 2W1<br />
39<br />
E<br />
34<br />
35<br />
36<br />
Oil Diff<br />
LP Safety<br />
TRAXOIL<br />
HP Safety<br />
THERMISTOR INT69 VS<br />
CRANKCASE<br />
HEATER<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
01<br />
COMP 3 PWS SCH- <strong>MSP</strong>080/100-<strong>INV</strong><br />
<strong>MSP</strong>-080-613P-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
218<br />
625<br />
202<br />
629<br />
200<br />
600<br />
214<br />
612<br />
ISOLATOR<br />
Aux<br />
201<br />
607<br />
4<br />
71<br />
13<br />
213<br />
13<br />
201<br />
2R2/1<br />
Brn<br />
Blk<br />
Grey<br />
3<br />
216 201<br />
21<br />
22<br />
2L1<br />
2L2<br />
23<br />
2L3<br />
71<br />
14<br />
2MS2<br />
14<br />
2MS1<br />
Blu<br />
2N1<br />
203<br />
201<br />
214<br />
2MS1 2MS2<br />
2CB1<br />
4A<br />
3<br />
13<br />
201<br />
33<br />
2R1/1<br />
72<br />
217<br />
2K1/3<br />
2<br />
4<br />
14<br />
2K1/2<br />
2<br />
34<br />
33<br />
21<br />
2R3/1<br />
2k2/1<br />
2k1/1<br />
308<br />
3<br />
209<br />
200<br />
203<br />
Blu<br />
72<br />
22<br />
Issue 3 Page - 34 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
210<br />
215<br />
2Pl3/Sk3 3<br />
2Pl2/Skt2 5 Blu<br />
34<br />
2Pl2/Skt2 4 74<br />
73<br />
2Pl3/Sk3 2<br />
2Pl3/Sk3 1<br />
2Pl2/Skt2 3<br />
2Pl2/Skt2 2<br />
2Pl2/Skt2 1<br />
2K2<br />
2K1<br />
218<br />
202<br />
3R1<br />
29<br />
28<br />
27<br />
26<br />
25<br />
24<br />
2R2<br />
A1 A1<br />
3K2 3K1<br />
A2 A2<br />
216<br />
217<br />
211<br />
201<br />
2Pl3/Sk3 4<br />
2R3<br />
2Pl1/Skt1 1-7<br />
R<br />
G G<br />
300<br />
LOAD<br />
RELAY<br />
RUN<br />
RELAY<br />
CONTACTORS<br />
TRIP<br />
RUN<br />
SUPPLY<br />
HEALTHY<br />
3R1<br />
TRIP<br />
RELAY<br />
29<br />
28<br />
27<br />
26<br />
25<br />
24<br />
E<br />
Compressor<br />
Box<br />
Terminals<br />
206<br />
205<br />
204<br />
N<br />
3<br />
13<br />
12<br />
11<br />
1 2 3 4 6 8 9 10<br />
209<br />
210<br />
208<br />
207<br />
Blk<br />
Brn<br />
Blu<br />
Brn<br />
Blu<br />
N<br />
73<br />
N<br />
74<br />
204<br />
203<br />
N<br />
72<br />
Cabling 0.75mm & 1mm<br />
71-79 Brown 230V AC functions<br />
Blue Neutral<br />
200 White 24V 50Hz 0V<br />
201-249 Violet 24V 50Hz<br />
Orn<br />
Blk<br />
Brn<br />
Red<br />
R Mp 1 2 12 11 14 B1 B2<br />
Off Loader<br />
1U1 2U1<br />
27<br />
28<br />
1V1 M 2V1<br />
1W1 2W1<br />
29<br />
E<br />
24<br />
25<br />
26<br />
Oil Diff<br />
LP Safety<br />
TRAXOIL<br />
HP Safety<br />
THERMISTOR INT69 VS<br />
CRANKCASE<br />
HEATER<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
02<br />
COMP2 PWS(OFF/L) -<strong>MSP</strong>100-<strong>INV</strong><br />
<strong>MSP</strong>-100-612P-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
11/02/04 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Front Panel<br />
Cabling 0.75mm & 1mm<br />
61-99 Brown 230V AC functions<br />
6N and 7N Blue Neutral<br />
600 White 24V 50Hz 0V<br />
601-649 Violet 24V 50Hz<br />
650 White RDM Com 0V<br />
651-659 Orange RDM 5V<br />
670 Black 24V DC 0V<br />
671-679 Red 24V DC<br />
681-689 Twisted Pair<br />
602<br />
602<br />
602<br />
602<br />
601<br />
65<br />
78<br />
2<br />
Low<br />
Liquid<br />
Sensor<br />
1<br />
5<br />
7<br />
7<br />
604<br />
605<br />
6R8/2<br />
6R9/2<br />
6R6/2<br />
X<br />
6CB2 10A<br />
X X<br />
3<br />
6CB1 4A<br />
7CB2 6A<br />
6 6 6<br />
618<br />
617<br />
616<br />
635<br />
1<br />
6R9<br />
8<br />
11<br />
602<br />
600<br />
602<br />
66<br />
78<br />
Primary<br />
Healthy<br />
Backup<br />
Operated<br />
Wetec<br />
Alarm<br />
Low<br />
Liquid<br />
Pressure<br />
Trip<br />
Supply Shutdowm<br />
Healthy Operatted<br />
601<br />
66<br />
HP/LP<br />
Master<br />
200VA<br />
Transformer<br />
230 12<br />
0<br />
1 2 4<br />
6F3 3.15A<br />
6F2 3.15A<br />
6F1 3.15A<br />
12<br />
0<br />
0<br />
603<br />
602<br />
608<br />
607<br />
66<br />
78<br />
L +<br />
230V<br />
24VDC<br />
Millenium PS<br />
N -<br />
Issue 3 Page - 35 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
602<br />
603<br />
RCD 13A<br />
Socket<br />
602 Controllers Supply<br />
603 Controls Feed<br />
7N<br />
75<br />
6N<br />
65<br />
N<br />
L3<br />
L2<br />
L1<br />
671<br />
670<br />
608 Compressor 3 Cabinet<br />
600<br />
6N<br />
E<br />
7N<br />
607 Compressor 2 Cabinet<br />
6ISO<br />
32A<br />
606 Compressor 1 Cabinet<br />
T3<br />
T2<br />
T1<br />
N<br />
613 Compressor 3 Cabinet<br />
612 Compressor 2 Cabinet<br />
7N1<br />
6N1<br />
6L1<br />
7L1<br />
611 Compressor 1 Cabinet<br />
1<br />
6R1<br />
8<br />
1<br />
6R2<br />
8<br />
6R3<br />
8<br />
1<br />
1<br />
6R6<br />
8<br />
600 (24V Return All Cabinets)<br />
671 24V DC+ Supply<br />
670 24V DC OV<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
02<br />
COMMON CONTROLS SHT 1 - <strong>MSP</strong>050/100-<strong>INV</strong><br />
02 BACKUP LIGHT R10/3 REFERENCE REMOVED<br />
N/A 18/07/06<br />
<strong>MSP</strong>-050-631-<strong>INV</strong>.02<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Suction TX<br />
4<br />
656<br />
3 6R8/1<br />
Wetec Alarm<br />
2<br />
655<br />
3 6R9/1<br />
Liquid Level Alarm<br />
Wet Tech Sensor<br />
Backup control<br />
Cabling 0.75mm<br />
600 White 24V 50Hz 0V<br />
601-649 Violet 24V 50Hz<br />
650 White RDM Com 0V<br />
651-669 Orange RDM 5V<br />
670 Black 24V DC 0V<br />
671-679 Red 24V DC<br />
690-696 Red 10V DV<br />
681-689 Twisted Pair<br />
694-699 Twisted Pair<br />
Suction Temperature<br />
Suction TX<br />
671<br />
Auto<br />
653<br />
6R7/1<br />
590R<br />
Wht<br />
Brn<br />
2<br />
3 6R3/1<br />
Comp 3 Fault<br />
2<br />
3 6R2/1<br />
Comp 2 Fault<br />
2<br />
3 6R1/1<br />
Comp 1 Fault<br />
3<br />
NO<br />
1<br />
NC<br />
Man<br />
2<br />
652<br />
4<br />
NO<br />
2<br />
NC<br />
672<br />
3<br />
Blk<br />
Grn<br />
Wht<br />
Red<br />
2x1K<br />
Wht<br />
Brn<br />
NO<br />
3<br />
673<br />
650<br />
657<br />
658<br />
Blk<br />
Red<br />
Reset<br />
651<br />
Not Used<br />
Blk<br />
602<br />
Red<br />
Blk<br />
670<br />
686<br />
Red<br />
4<br />
NO<br />
674<br />
650<br />
683<br />
670<br />
Blk<br />
<strong>Inverter</strong><br />
692<br />
Alarm<br />
683<br />
682<br />
674<br />
672<br />
692<br />
Red<br />
640<br />
641<br />
642<br />
686<br />
671<br />
Red<br />
Red<br />
Blk<br />
Blk<br />
650<br />
655<br />
656<br />
Red<br />
Blk<br />
650<br />
650<br />
651<br />
652<br />
650<br />
653<br />
Com<br />
1<br />
2<br />
Com<br />
3<br />
4<br />
Com<br />
5<br />
6<br />
Com<br />
MERCURY 11-10 STEP CONTROLLER<br />
0-10V OUT<br />
+ - I1 I2 I3 I4 I5 I6 I7 I8 I9 I10 I11 I12<br />
Analogue Inputs<br />
Com<br />
6<br />
7<br />
Com<br />
8<br />
9<br />
Com<br />
10<br />
11<br />
Com<br />
CH2<br />
CH1<br />
Sig<br />
GND<br />
1<br />
2<br />
Com<br />
3<br />
4<br />
Com<br />
5<br />
Com<br />
24V<br />
DC<br />
Coms<br />
5v INPUTS<br />
Transducers<br />
MERCURY 11-10P<br />
Red<br />
Blk<br />
5v INPUTS<br />
SA20 MILLENIUM CONTROLLER<br />
Relays<br />
Relays<br />
Relays CONTROLLER Relays<br />
Compressors<br />
Danfoss<br />
Master<br />
8 9<br />
Issue 3 Page - 36 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
690<br />
24V<br />
0V<br />
78C<br />
6C<br />
0V<br />
24V<br />
45C<br />
23C<br />
1C<br />
24V<br />
0V<br />
6C<br />
0V<br />
24V<br />
1C<br />
O1 O2 O3 O4 O5 O6 O7 O8<br />
Com<br />
N/O<br />
N/O<br />
N/O<br />
Com<br />
N/O<br />
N/O<br />
Com<br />
N/O<br />
N/O<br />
N/O<br />
N/C<br />
N/O<br />
Com<br />
602<br />
600<br />
600<br />
602<br />
602<br />
600<br />
602<br />
624<br />
604<br />
625<br />
626<br />
604<br />
624<br />
605<br />
625<br />
626<br />
605<br />
600<br />
695<br />
602<br />
622 622<br />
642<br />
640<br />
641<br />
604<br />
605<br />
6R1/25<br />
628Compressor<br />
1<br />
6246<br />
603<br />
602<br />
629 Compressor 2<br />
6R2/2<br />
6 5<br />
6R3/2 5<br />
625<br />
630 Compressor 3<br />
6<br />
626<br />
604<br />
605<br />
<strong>INV</strong> Comms<br />
695<br />
Red<br />
6R7/2 6<br />
7<br />
Red<br />
605<br />
Red<br />
696<br />
<strong>Inverter</strong> control<br />
Clr<br />
Blk<br />
696<br />
696<br />
Clr<br />
5<br />
690<br />
Blk<br />
Blk<br />
1<br />
6R8<br />
8<br />
1<br />
6R7<br />
8<br />
600LV Return<br />
600<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
02<br />
COMMON CONTROLS SHT 2 - <strong>MSP</strong>050/100-<strong>INV</strong><br />
02 TERMINAL 695 REMOVED<br />
N/A 02/08/06<br />
<strong>MSP</strong>-050-632-<strong>INV</strong>.02<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Front Panel<br />
Cabling 0.75mm & 1mm<br />
61-99 Brown 230V AC functions<br />
6N and 7N Blue Neutral<br />
600 White 24V 50Hz 0V<br />
601-649 Violet 24V 50Hz<br />
650 White RDM Com 0V<br />
651-659 Orange RDM 5V<br />
670 Black 24V DC 0V<br />
671-679 Red 24V DC<br />
681-689 Twisted Pair<br />
602<br />
602<br />
602<br />
602<br />
601<br />
65<br />
75<br />
605<br />
2<br />
Low Liqid<br />
Sensor<br />
1 3<br />
5<br />
7<br />
7<br />
604<br />
6R8/2<br />
6R9/2<br />
6R6/2<br />
X<br />
6CB2 10A<br />
X X X X<br />
3 7<br />
6CB1 4A<br />
7CB3 4A<br />
7CB2 6A<br />
7CB1 4A<br />
6R10/3<br />
6 6 6<br />
618<br />
617<br />
616<br />
635<br />
1<br />
6R9<br />
8<br />
602<br />
600<br />
11<br />
602<br />
66<br />
79<br />
78<br />
76<br />
Primary<br />
Healthy<br />
Backup<br />
Operated<br />
Wetec<br />
Alarm<br />
Low<br />
Liquid<br />
Pressure<br />
Trip<br />
Shutdowm<br />
Operatted<br />
Supply<br />
Healthy<br />
76<br />
76<br />
Ligt Sw<br />
601<br />
66<br />
HP/LP<br />
Master<br />
6F3 3.15A<br />
6F2 3.15A<br />
6F1 3.15A<br />
200VA<br />
Transformer<br />
230 12<br />
0<br />
76<br />
77<br />
1 2 4<br />
12<br />
0<br />
0<br />
603<br />
602<br />
608<br />
607<br />
66<br />
JG 5 Cooler<br />
79<br />
78<br />
L +<br />
230V<br />
24VDC<br />
Millenium PS<br />
N -<br />
24V Sloenoid<br />
Maintained<br />
Houising<br />
Fluorescent<br />
Issue 3 Page - 37 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
602<br />
603<br />
Fan<br />
Motor<br />
RCD 13A<br />
Socket<br />
602 Controllers Supply<br />
603 Controls Feed<br />
7N<br />
75<br />
6N<br />
65<br />
N<br />
L3<br />
L2<br />
L1<br />
671<br />
670<br />
608 Compressor 3 Cabinet<br />
600<br />
6N<br />
7N<br />
7N<br />
7N<br />
607 Compressor 2 Cabinet<br />
6ISO<br />
32A<br />
606 Compressor 1 Cabinet<br />
T3<br />
T2<br />
T1<br />
N<br />
613 Compressor 3 Cabinet<br />
612 Compressor 2 Cabinet<br />
7N1<br />
6N1<br />
6L1<br />
7L1<br />
611 Compressor 1 Cabinet<br />
1<br />
6R1<br />
8<br />
1<br />
6R2<br />
8<br />
6R3<br />
8<br />
1<br />
1<br />
6R6<br />
8<br />
600 (24V Return All Cabinets)<br />
671 24V DC+ Supply<br />
670 24V DC OV<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
01<br />
COMMON CONTROLS SHT 1 - <strong>MSP</strong>L-050-<strong>INV</strong><br />
<strong>MSP</strong>L-050-631-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
06/07/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Suction TX<br />
4<br />
656<br />
6R8/1<br />
Wetec Alarm<br />
2<br />
655<br />
6R9/1<br />
Liquid Level Alarm<br />
Wet Tech Sensor<br />
Backup control<br />
3<br />
Cabling 0.75mm<br />
600 White 24V 50Hz 0V<br />
601-649 Violet 24V 50Hz<br />
650 White RDM Com 0V<br />
651-669 Orange RDM 5V<br />
670 Black 24V DC 0V<br />
671-679 Red 24V DC<br />
690-696 Red 10V DV<br />
681-689 Twisted Pair<br />
694-699 Twisted Pair<br />
Suction Temperature<br />
3<br />
Suction TX<br />
653<br />
Suction Temperature<br />
671<br />
PT1000<br />
Auto<br />
2<br />
6R7/1<br />
652<br />
590R<br />
3<br />
Wht<br />
Brn<br />
2<br />
3 6R3/1<br />
Comp 3 Fault<br />
2<br />
3 6R2/1<br />
Comp 2 Fault<br />
2<br />
3 6R1/1<br />
Comp 1 Fault<br />
3<br />
NO<br />
1<br />
NC<br />
Man<br />
4<br />
NO<br />
2<br />
NC<br />
672<br />
673<br />
Wht<br />
Red<br />
602 Blk<br />
Red Grn<br />
2x1K<br />
Wht<br />
NO<br />
3<br />
Brn<br />
Reset<br />
650<br />
657<br />
658<br />
Blk<br />
Red<br />
Blk<br />
Red<br />
Not Used<br />
Blk<br />
Blk<br />
670<br />
Red<br />
4<br />
NO<br />
686<br />
674<br />
651<br />
650<br />
684<br />
683<br />
670<br />
Blk<br />
<strong>Inverter</strong><br />
692<br />
Alarm<br />
670<br />
670<br />
683<br />
682<br />
674<br />
672<br />
692<br />
Red<br />
640<br />
641<br />
642<br />
686<br />
671<br />
671<br />
671<br />
Red<br />
Blk<br />
656<br />
Blk<br />
Red<br />
650<br />
655<br />
Red<br />
Blk<br />
650<br />
650<br />
651<br />
652<br />
650<br />
653<br />
1<br />
2<br />
3<br />
688<br />
MERCURY 11-10 STEP CONTROLLER<br />
0-10V OUT<br />
Com<br />
1<br />
2<br />
Com<br />
3<br />
4<br />
Com<br />
5<br />
6<br />
Com<br />
+ - I1 I2 I3 I4 I5 I6 I7 I8 I9 I10 I11 I12<br />
Analogue Inputs<br />
Com<br />
6<br />
7<br />
Com<br />
8<br />
9<br />
Com<br />
10<br />
11<br />
Com<br />
CH2<br />
CH1<br />
Sig<br />
GND<br />
1<br />
2<br />
Com<br />
3<br />
4<br />
Com<br />
5<br />
Com<br />
Coms<br />
5v INPUTS<br />
Transducers<br />
5v INPUTS<br />
MERCURY 11-10P<br />
Relays CONTROLLER<br />
Relays<br />
Compressors<br />
690<br />
Red<br />
Blk<br />
SA20 MILLENIUM CONTROLLER<br />
Relays<br />
Relays<br />
PT1000 -V<br />
Out<br />
+V<br />
24V<br />
DC<br />
Danfoss<br />
Master<br />
+-<br />
8 9<br />
Issue 3 Page - 38 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
24V<br />
0V<br />
78C<br />
6C<br />
0V<br />
24V<br />
23C<br />
1C<br />
24V<br />
0V<br />
6C<br />
0V<br />
45C<br />
1C<br />
4<br />
5<br />
6<br />
O1 O2 O3 O4 O5 O6 O7 O8<br />
Com<br />
N/O<br />
N/O<br />
N/O<br />
Com<br />
N/O<br />
N/O<br />
Com<br />
N/O<br />
N/O<br />
N/O<br />
N/C<br />
N/O<br />
Com<br />
602<br />
600<br />
600<br />
602<br />
684<br />
624<br />
604<br />
625<br />
626<br />
604<br />
624<br />
605<br />
625<br />
626<br />
605<br />
600<br />
602<br />
600<br />
602<br />
695<br />
602<br />
622 622<br />
642<br />
640<br />
641<br />
604<br />
605<br />
6R1/25<br />
628Compressor<br />
1<br />
6246<br />
603<br />
602<br />
629 Compressor 2<br />
6R2/2<br />
6 5<br />
6R3/2 5<br />
625<br />
630 Compressor 3<br />
6<br />
626<br />
604<br />
605<br />
<strong>INV</strong> Comms<br />
695<br />
Red<br />
6R7/2 6<br />
7<br />
Red<br />
605<br />
696<br />
<strong>Inverter</strong> control<br />
Red<br />
Clr<br />
Blk<br />
696<br />
696<br />
Clr<br />
5<br />
690<br />
Blk<br />
Blk<br />
1<br />
6R8<br />
8<br />
1<br />
6R7<br />
8<br />
600LV Return<br />
600<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
PART<br />
02<br />
COMMON CONTROLS SHT 2 - <strong>MSP</strong>L050/100-<strong>INV</strong><br />
DATE SCALE<br />
06/07/06 1:1<br />
02 TERMINAL 695 REMOVED<br />
N/A 02/08/06<br />
<strong>MSP</strong>L-050-632-<strong>INV</strong>.02<br />
JOB No. DRG. FILE REF<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Front Panel<br />
Cabling 0.75mm & 1mm<br />
61-99 Brown 230V AC functions<br />
6N and 7N Blue Neutral<br />
600 White 24V 50Hz 0V<br />
601-649 Violet 24V 50Hz<br />
650 White RDM Com 0V<br />
651-659 Orange RDM 5V<br />
670 Black 24V DC 0V<br />
671-679 Red 24V DC<br />
681-689 Twisted Pair<br />
602<br />
602<br />
602<br />
602<br />
601<br />
65<br />
75<br />
605<br />
2<br />
Low<br />
Liquid<br />
Sensor<br />
1<br />
5<br />
7<br />
7<br />
604<br />
6R8/2<br />
6R9/2<br />
6R6/2<br />
X<br />
6CB2 10A<br />
X X X X<br />
3 7<br />
3<br />
6CB1 4A<br />
7CB3 4A<br />
7CB2 6A<br />
7CB1 4A<br />
6R10/3<br />
6 6 6<br />
618<br />
617<br />
616<br />
635<br />
1<br />
6R9<br />
8<br />
602<br />
600<br />
11<br />
602<br />
66<br />
79<br />
78<br />
76<br />
Primary<br />
Healthy<br />
Backup<br />
Operated<br />
Wetec<br />
Alarm<br />
Low<br />
Liquid<br />
Pressure<br />
Trip<br />
Shutdown<br />
Operated<br />
Supply<br />
Healthy<br />
76<br />
76<br />
Ligt Sw<br />
601<br />
66<br />
HP/LP<br />
Master<br />
6F3 3.15A<br />
6F2 3.15A<br />
6F1 3.15A<br />
76<br />
77<br />
1 2 4<br />
200VA<br />
Transformer<br />
230 12<br />
0<br />
12<br />
0<br />
0<br />
603<br />
602<br />
608<br />
607<br />
606<br />
66<br />
JG 5 Cooler<br />
79<br />
78<br />
L +<br />
230V<br />
24VDC<br />
Millenium PS<br />
N -<br />
24V Sloenoid<br />
Maintained<br />
Houising<br />
Fluorescent<br />
Issue 3 Page - 39 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
602<br />
603<br />
Fan<br />
Motor<br />
RCD 13A<br />
Socket<br />
602 Controllers Supply<br />
603 Controls Feed<br />
7N<br />
75<br />
6N<br />
65<br />
N<br />
L3<br />
L2<br />
L1<br />
671<br />
670<br />
608 Compressor 3 Cabinet<br />
600<br />
6N<br />
7N<br />
7N<br />
7N<br />
607 Compressor 2 Cabinet<br />
6ISO<br />
32A<br />
606 Compressor 1 Cabinet<br />
N<br />
T3<br />
T2<br />
T1<br />
613 Compressor 3 Cabinet<br />
612 Compressor 2 Cabinet<br />
7N1<br />
6N1<br />
6L1<br />
7L1<br />
611 Compressor 1 Cabinet<br />
1<br />
6R1<br />
8<br />
1<br />
1<br />
6R3<br />
8<br />
1<br />
1<br />
6R6<br />
8<br />
600 (24V Return All Cabinets)<br />
8<br />
8<br />
671 24V DC+ Supply<br />
670 24V DC OV<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
02<br />
COMMON CONTROLS SHT 1 - MSHP080/100-ECI<br />
MSHP-080-631-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
21/08/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Suction TX<br />
4<br />
656<br />
6R8/1<br />
Wetec Alarm<br />
2<br />
655<br />
6R9/1<br />
Liquid Level Alarm<br />
Wet Tech Sensor<br />
Backup control<br />
3<br />
Cabling 0.75mm<br />
600 White 24V 50Hz 0V<br />
601-649 Violet 24V 50Hz<br />
650 White RDM Com 0V<br />
651-669 Orange RDM 5V<br />
670 Black 24V DC 0V<br />
671-679 Red 24V DC<br />
690-696 Red 10V DV<br />
681-689 Twisted Pair<br />
694-699 Twisted Pair<br />
Suction Temperature<br />
3<br />
Suction TX<br />
671<br />
Auto<br />
653<br />
6R7/1<br />
590R<br />
Wht<br />
2<br />
6R3/1<br />
Comp 3 Fault<br />
2<br />
6R2/1<br />
Comp 2 Fault<br />
2<br />
6R1/1<br />
Comp 1 Fault<br />
NO<br />
1<br />
NC<br />
3<br />
Man<br />
2<br />
Housing Temp (PT1000)<br />
3<br />
652<br />
4<br />
NO<br />
2<br />
NC<br />
3<br />
672<br />
3<br />
673<br />
Blk<br />
Grn<br />
Wht<br />
Red<br />
Brn<br />
2x1K<br />
Wht<br />
Brn<br />
NO<br />
3<br />
3<br />
650<br />
657<br />
658<br />
Red<br />
Blk<br />
Reset<br />
686<br />
651<br />
Blk<br />
Red<br />
Not Used<br />
Red<br />
Blk<br />
602<br />
Blk<br />
670<br />
Red<br />
4<br />
NO<br />
674<br />
650<br />
684<br />
683<br />
670<br />
Blk<br />
<strong>Inverter</strong><br />
692<br />
Alarm<br />
683<br />
682<br />
674<br />
672<br />
692<br />
Red<br />
640<br />
641<br />
642<br />
686<br />
671<br />
671<br />
670<br />
671<br />
Red<br />
Blk<br />
Blk<br />
656<br />
Blk<br />
Red<br />
650<br />
655<br />
Red<br />
Blk<br />
650<br />
650<br />
651<br />
652<br />
650<br />
653<br />
1<br />
2<br />
3<br />
Red<br />
688<br />
MERCURY 11-10 STEP CONTROLLER<br />
0-10V OUT<br />
5<br />
6<br />
3<br />
4<br />
1<br />
2<br />
-V<br />
Out<br />
+V<br />
+ - I1 I2 I3 I4 I5 I6 I7 I8 I9 I10 I11 I12<br />
Analogue Inputs<br />
Com<br />
6<br />
7<br />
Com<br />
8<br />
9<br />
Com<br />
10<br />
11<br />
Com<br />
CH2<br />
12VDC<br />
CH1<br />
12VDC<br />
Sig<br />
GND<br />
1<br />
2<br />
Com<br />
3<br />
4<br />
Com<br />
5<br />
Com<br />
24V<br />
DC<br />
Coms<br />
5v INPUTS<br />
Transducers<br />
MERCURY 11-10P<br />
5v INPUTS<br />
Blk<br />
Red<br />
SA20 MILLENIUM CONTROLLER<br />
Relays<br />
Relays<br />
Relays CONTROLLER Relays<br />
Compressors<br />
PT1000<br />
Danfoss<br />
Master<br />
+-<br />
8 9<br />
Issue 3 Page - 40 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
690<br />
24V<br />
0V<br />
78C<br />
6C<br />
0V<br />
24V<br />
45C<br />
1C<br />
0V<br />
6C<br />
0V<br />
1C<br />
4<br />
5<br />
6<br />
O1 O2 O3 O4 O5 O6 O7 O8<br />
Com<br />
N/O<br />
N/O<br />
N/O<br />
Com<br />
N/O<br />
N/O<br />
Com<br />
N/O<br />
N/O<br />
N/O<br />
N/C<br />
N/O<br />
Com<br />
600<br />
602<br />
600<br />
602<br />
600<br />
602<br />
605<br />
624<br />
605<br />
625<br />
626<br />
605<br />
627<br />
600<br />
602<br />
604<br />
624<br />
604<br />
625<br />
626<br />
604<br />
627<br />
684<br />
695<br />
602<br />
622 622<br />
642<br />
640<br />
641<br />
604<br />
605<br />
628Compressor<br />
1<br />
629 Compressor 2<br />
630 Compressor 2<br />
Loader<br />
631 Compressor 3<br />
6R1/25<br />
6R2/25<br />
6R2/34<br />
6R3/25<br />
6246<br />
625 6<br />
626 3<br />
627 6<br />
603<br />
602<br />
604<br />
605<br />
<strong>INV</strong> Comms<br />
695<br />
Red<br />
6R7/2 6<br />
7<br />
Red<br />
Red<br />
696<br />
<strong>Inverter</strong> control<br />
Clr<br />
Blk<br />
696<br />
696<br />
Clr<br />
5<br />
690<br />
Blk<br />
Blk<br />
605<br />
623 Cooler Sol<br />
1<br />
6R8<br />
8<br />
1<br />
6R7<br />
8<br />
600LV Return<br />
600<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
PART<br />
01<br />
COMMON CONTROLS SHT 2 - MSHP080/100-<strong>INV</strong><br />
DATE SCALE<br />
21/08/06 1:1<br />
02/08/06<br />
N/A<br />
MSHP-080-632-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
108<br />
100<br />
103<br />
N<br />
63<br />
62<br />
100<br />
63<br />
108<br />
103<br />
N<br />
62<br />
1Pl2/Skt2<br />
1Pl1/Skt1<br />
190<br />
16<br />
15<br />
14<br />
E<br />
Issue 3 Page - 41 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1N1 Main<br />
Earth<br />
N<br />
N<br />
35mm trunking<br />
35mm trunking<br />
1L3<br />
25 mm trunking<br />
1L2<br />
1MS1 1CB1<br />
MCB<br />
260.0<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
T2<br />
4<br />
1L1<br />
1<br />
3<br />
L1 L2 L3<br />
1R1 1R2<br />
10-16A<br />
N<br />
N<br />
Test<br />
1 L1 2 L2 3 L3<br />
T1<br />
2<br />
606<br />
22<br />
14<br />
13<br />
21<br />
101<br />
14<br />
22<br />
21<br />
13<br />
628<br />
611<br />
600<br />
102<br />
112<br />
100<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
01<br />
COMP 1 DOL LAYOUT: <strong>MSP</strong>050/080-<strong>INV</strong><br />
<strong>MSP</strong>-050-621D-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
ew<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
26 73<br />
208<br />
200<br />
203<br />
N<br />
72<br />
200<br />
208<br />
203<br />
N<br />
72<br />
73<br />
26<br />
24<br />
E<br />
25<br />
25<br />
2Pl1/Skt1 2Pl2/Skt2<br />
24<br />
E<br />
Issue 3 Page - 42 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
E<br />
Main<br />
Earth<br />
2N1<br />
N<br />
N<br />
2L3<br />
35mm trunking<br />
2K1 2R1 2R2<br />
35mm trunking<br />
2L2<br />
2MS1 2CB1<br />
MCB<br />
260.0<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
T2<br />
4<br />
1 L1 2 L2 3 L3<br />
25 mm trunking<br />
N<br />
N<br />
Test<br />
2L1<br />
T1<br />
2<br />
1<br />
3<br />
L1 L2 L3<br />
12A<br />
607<br />
22<br />
14<br />
13<br />
21<br />
201<br />
14<br />
22<br />
21<br />
13<br />
629<br />
612<br />
600<br />
202<br />
212<br />
200<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>-050-622D-<strong>INV</strong><br />
01<br />
COMP 2 DOL LAYOUT<strong>MSP</strong>050-<strong>INV</strong><br />
<strong>MSP</strong>-050-622D-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
ew<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
39<br />
38<br />
37<br />
36<br />
35<br />
34<br />
34<br />
E<br />
E<br />
E<br />
35<br />
308<br />
308<br />
300<br />
300<br />
303<br />
303<br />
N N<br />
84<br />
84<br />
N<br />
N<br />
83<br />
83<br />
82<br />
82<br />
39<br />
38<br />
37<br />
36<br />
3Pl3/Skt3<br />
3Pl2/Skt2<br />
3R2<br />
3Pl1/Skt1<br />
Issue 3 Page - 43 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Main<br />
Earth<br />
3N1<br />
35mm trunking<br />
3K1 3K2 3R1<br />
35mm trunking<br />
3L3<br />
3MS1 3MS2 3CB1<br />
MCB<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
N<br />
N<br />
25 mm trunking<br />
260.0<br />
Test<br />
1 L1 2 L2 3 L3<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
3L2<br />
T2<br />
4<br />
N<br />
N<br />
Test<br />
1 L1 2 L2 3 L3<br />
3L1<br />
T1<br />
2<br />
1<br />
3<br />
L1 L2 L3<br />
608<br />
22<br />
14<br />
13<br />
21<br />
301<br />
14<br />
22<br />
21<br />
13<br />
630<br />
613<br />
600<br />
302<br />
312<br />
300<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>-(050 & 060)-623P-<strong>INV</strong><br />
02<br />
COMP 3 PWS LAYOUT: <strong>MSP</strong>050-<strong>INV</strong><br />
02 TERMINAL 309 CHANGED TO BE 308<br />
N/A 19/07/06<br />
<strong>MSP</strong>-050-623P-<strong>INV</strong>.02<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
26 73<br />
208<br />
200<br />
203<br />
N<br />
72<br />
200<br />
208<br />
203<br />
N<br />
72<br />
73<br />
26<br />
24<br />
E<br />
25<br />
25<br />
2Pl1/Skt1 2Pl2/Skt2<br />
24<br />
E<br />
Issue 3 Page - 44 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
E<br />
Main<br />
Earth<br />
2N1<br />
N<br />
N<br />
2L3<br />
35mm trunking<br />
2K1 2R1 2R2<br />
35mm trunking<br />
2L2<br />
2MS1 2CB1<br />
MCB<br />
260.0<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
T2<br />
4<br />
1 L1 2 L2 3 L3<br />
25 mm trunking<br />
N<br />
N<br />
Test<br />
2L1<br />
T1<br />
2<br />
1<br />
3<br />
L1 L2 L3<br />
607<br />
22<br />
14<br />
13<br />
21<br />
201<br />
14<br />
22<br />
21<br />
13<br />
629<br />
612<br />
600<br />
202<br />
212<br />
200<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>-060-622D-<strong>INV</strong><br />
01<br />
COMP 2 DOL LAYOUT: <strong>MSP</strong>060-MPI<br />
<strong>MSP</strong>-060-622D-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
ew<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
39<br />
38<br />
37<br />
36<br />
35<br />
34<br />
34<br />
E<br />
E<br />
E<br />
35<br />
309<br />
309<br />
300<br />
300<br />
303<br />
303<br />
N N<br />
84<br />
84<br />
N<br />
N<br />
83<br />
83<br />
82<br />
82<br />
39<br />
38<br />
37<br />
36<br />
3Pl3/Skt3<br />
3Pl2/Skt2<br />
3R2<br />
3Pl1/Skt1<br />
Issue 3 Page - 45 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Main<br />
Earth<br />
3N1<br />
35mm trunking<br />
3K1 3K2 3R1<br />
35mm trunking<br />
3L3<br />
3MS1 3MS2 3CB1<br />
MCB<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
N<br />
N<br />
25 mm trunking<br />
260.0<br />
Test<br />
1 L1 2 L2 3 L3<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
3L2<br />
T2<br />
4<br />
N<br />
N<br />
Test<br />
1 L1 2 L2 3 L3<br />
3L1<br />
T1<br />
2<br />
1<br />
3<br />
L1 L2 L3<br />
608<br />
22<br />
14<br />
13<br />
21<br />
301<br />
14<br />
22<br />
21<br />
13<br />
630<br />
613<br />
600<br />
302<br />
312<br />
300<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>-(060 & 080)-623P-<strong>INV</strong><br />
01<br />
COMP 3 PWS LAYOUT: <strong>MSP</strong>060/080-<strong>INV</strong><br />
<strong>MSP</strong>-060-623P-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
24<br />
E<br />
25<br />
210<br />
209<br />
200<br />
203<br />
Not Used<br />
N<br />
73<br />
72<br />
29<br />
28<br />
27<br />
26<br />
210<br />
200<br />
209<br />
203<br />
N<br />
2Pl3/Skt3<br />
74<br />
N<br />
73<br />
2Pl2/Skt2<br />
72<br />
29<br />
38<br />
27<br />
2R2<br />
26<br />
25<br />
24<br />
2Pl1/Skt1<br />
E<br />
Issue 3 Page - 46 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
E<br />
Main<br />
Earth<br />
2N1<br />
35mm trunking<br />
2K1 2K2 2R1<br />
35mm trunking<br />
2L3<br />
2MS1 2MS2 2CB1<br />
MCB<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
N<br />
N<br />
25 mm trunking<br />
260.0<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
12A 12A<br />
Test<br />
1 L1 2 L2 3 L3<br />
2L2<br />
T2<br />
4<br />
N<br />
N<br />
Test<br />
1 L1 2 L2 3 L3<br />
2L1<br />
T1<br />
2<br />
1<br />
3<br />
L1 L2 L3<br />
608<br />
201<br />
202 629<br />
626<br />
626<br />
212<br />
612<br />
200<br />
600<br />
22<br />
14<br />
13<br />
21<br />
14<br />
22<br />
21<br />
13<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>-080-622P-<strong>INV</strong><br />
01<br />
COMP 2 PWS LAYOUT: <strong>MSP</strong>080-<strong>INV</strong><br />
<strong>MSP</strong>-080-622P-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
108<br />
100<br />
103<br />
N<br />
63<br />
62<br />
100<br />
63<br />
108<br />
103<br />
N<br />
62<br />
1Pl2/Skt2<br />
1Pl1/Skt1<br />
190<br />
16<br />
15<br />
14<br />
E<br />
Issue 3 Page - 47 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1N1 Main<br />
Earth<br />
N<br />
N<br />
35mm trunking<br />
35mm trunking<br />
1L3<br />
25 mm trunking<br />
1L2<br />
1MS1 1CB1<br />
MCB<br />
260.0<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
T2<br />
4<br />
1L1<br />
1<br />
3<br />
L1 L2 L3<br />
1R1 1R2<br />
16-20A<br />
N<br />
N<br />
Test<br />
1 L1 2 L2 3 L3<br />
T1<br />
2<br />
606<br />
22<br />
14<br />
13<br />
21<br />
101<br />
14<br />
22<br />
21<br />
13<br />
628<br />
611<br />
600<br />
102<br />
112<br />
100<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
01<br />
COMP 1 DOL LAYOUT: <strong>MSP</strong>-100-<strong>INV</strong><br />
<strong>MSP</strong>-100-621D-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
ew<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
210<br />
209<br />
200<br />
203<br />
N<br />
74<br />
N<br />
73<br />
72<br />
210<br />
200<br />
209<br />
203<br />
N<br />
2Pl3/Skt3<br />
74<br />
N<br />
73<br />
2Pl2/Skt2<br />
72<br />
24<br />
E<br />
25<br />
29<br />
28<br />
27<br />
26<br />
29<br />
28<br />
27<br />
2R2<br />
26<br />
25<br />
24<br />
2Pl1/Skt1<br />
E<br />
Issue 3 Page - 48 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
E<br />
Main<br />
Earth<br />
2N1<br />
35mm trunking<br />
2K1 2K2 2R1<br />
35mm trunking<br />
2L3<br />
2MS1 2MS2 2CB1<br />
MCB<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
N<br />
N<br />
25 mm trunking<br />
260.0<br />
Test<br />
1 L1 2 L2 3 L3<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
2L2<br />
T2<br />
4<br />
N<br />
N<br />
Test<br />
1 L1 2 L2 3 L3<br />
2L1<br />
T1<br />
2<br />
1<br />
3<br />
L1 L2 L3<br />
608<br />
201<br />
202 629<br />
626<br />
626<br />
212<br />
612<br />
200<br />
600<br />
22<br />
14<br />
13<br />
21<br />
14<br />
22<br />
21<br />
13<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>-100-622P-<strong>INV</strong><br />
01<br />
COMP 2 PWS LAYOUT: <strong>MSP</strong>100-<strong>INV</strong><br />
<strong>MSP</strong>-100-622P-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
580.0<br />
25 mm trunking<br />
39<br />
38<br />
37<br />
36<br />
35<br />
34<br />
34<br />
E<br />
E<br />
E<br />
35<br />
309<br />
309<br />
300<br />
300<br />
303<br />
303<br />
N N<br />
84<br />
84<br />
N<br />
N<br />
83<br />
83<br />
82<br />
82<br />
39<br />
38<br />
37<br />
36<br />
3Pl3/Skt3<br />
3Pl2/Skt2<br />
3R2<br />
3Pl1/Skt1<br />
Issue 3 Page - 49 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Main<br />
Earth<br />
3N1<br />
35mm trunking<br />
3K1 3K2 3R1<br />
35mm trunking<br />
3L3<br />
3MS1 3MS2 3CB1<br />
MCB<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
N<br />
N<br />
25 mm trunking<br />
260.0<br />
Test<br />
1 L1 2 L2 3 L3<br />
T3<br />
6<br />
5<br />
22<br />
14<br />
Aux<br />
13<br />
21<br />
PE<br />
PE<br />
3L2<br />
T2<br />
4<br />
N<br />
N<br />
Test<br />
1 L1 2 L2 3 L3<br />
3L1<br />
T1<br />
2<br />
1<br />
3<br />
L1 L2 L3<br />
608<br />
22<br />
14<br />
13<br />
21<br />
301<br />
14<br />
22<br />
21<br />
13<br />
630<br />
613<br />
600<br />
302<br />
312<br />
300<br />
35mm trunking<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>-100-623P-<strong>INV</strong><br />
01<br />
COMP 3 PWS LAYOUT: <strong>MSP</strong>100-<strong>INV</strong><br />
<strong>MSP</strong>-100-623P-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:2<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
To Controller<br />
Transducer<br />
Lead Blk/Wht<br />
Red<br />
Blk<br />
Tw Pair<br />
Screened or Tw Pair Red/Brn<br />
670<br />
RDM Termination<br />
Resistor<br />
657<br />
658<br />
650<br />
Sleeved Resistor 590R<br />
Sleeved Resistor(s)<br />
Transducer<br />
Termination<br />
Detail<br />
0<br />
220<br />
230<br />
240<br />
380<br />
400<br />
415<br />
440<br />
6R1<br />
6R2<br />
6R3<br />
6R6<br />
6R7<br />
6L1<br />
7L1<br />
6N<br />
PT1000<br />
200VA Transformer<br />
0<br />
0 12<br />
12<br />
7N<br />
696 Blk 692 Blk<br />
6R8<br />
6R9<br />
Comp 3 Comp 2<br />
6CB16CB27CB1<br />
Red<br />
Blk<br />
Red<br />
Comp 1<br />
Clr<br />
Blk<br />
Pack Control<br />
Backup Primary<br />
600<br />
602<br />
Red Blk 682<br />
670<br />
Red Blk 683<br />
602/600<br />
Red Blk<br />
Liquid level<br />
657 658<br />
NC 650<br />
600<br />
608<br />
613<br />
630<br />
600<br />
607<br />
612<br />
629<br />
600<br />
606<br />
611<br />
628<br />
692<br />
696<br />
E<br />
N<br />
78<br />
600<br />
602<br />
603<br />
623<br />
Wht/Brn<br />
Resistor<br />
Wht/Grn<br />
Blk/Red<br />
Wht/Brn<br />
602/600<br />
635<br />
Resistor<br />
PT1000<br />
686<br />
Common Control Items<br />
Issue 3 Page - 50 -<br />
September 2007<br />
6<br />
L1 L2 L3<br />
N<br />
1 2<br />
3 4<br />
24V DC PWS<br />
N<br />
5 6<br />
2 4 6<br />
600<br />
608<br />
613<br />
MCB MCB MCB<br />
630<br />
600<br />
607<br />
612<br />
629<br />
Comp 3 Comp 2<br />
600<br />
606<br />
611<br />
Red<br />
628<br />
Comp 1<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Blk<br />
692<br />
Red<br />
Clr<br />
Delay<br />
Between<br />
Stage<br />
Increase<br />
5s<br />
696<br />
Blk<br />
10s<br />
15s<br />
E<br />
RESOURCE DATA MANAGEMENT<br />
20s<br />
30s<br />
I1 I12<br />
N<br />
45s<br />
1m<br />
2m<br />
Millenium<br />
SA20<br />
O1 O2 O3/4 O5/6 O7/8<br />
Delay<br />
Between<br />
Stage<br />
Dectease<br />
680<br />
681<br />
686<br />
Red Blk 682<br />
670<br />
Red Blk 683<br />
602/600<br />
Red Blk<br />
78<br />
600<br />
602<br />
603<br />
623<br />
Wht/Brn<br />
Resistor<br />
Wht/Grn<br />
Blk/Red<br />
Wht/Brn<br />
602/600<br />
635<br />
Resistor<br />
PT1000<br />
Common Control Items<br />
5m<br />
10m<br />
OK<br />
Liquid level<br />
657 658<br />
NC 650<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
03 DANFOSS COMMS MODULE MOVED<br />
N/A 02/08/06<br />
03<br />
COMMON CNTRLS LAYOUT: <strong>MSP</strong>050/100-<strong>INV</strong><br />
02 TERMINALS 650/661 COND TX REMOVED<br />
N/A 180706<br />
<strong>MSP</strong>-050-634-<strong>INV</strong>.03<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
31/05/06 1:3<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
To Controller<br />
Transducer<br />
Lead Blk/Wht<br />
Blk<br />
Red<br />
Tw Pair<br />
Red/Brn<br />
Screened or Tw Pair<br />
670<br />
N<br />
E<br />
76<br />
77<br />
RDM Termination<br />
Resistor<br />
657<br />
658<br />
650<br />
Sleeved Resistor 590R<br />
Sleeved Resistor(s)<br />
Transducer<br />
Termination<br />
Detail<br />
0<br />
220<br />
230<br />
240<br />
380<br />
400<br />
415<br />
440<br />
Transformer MCB MCB MCB MCB MCB<br />
6CB1 6CB2 7CB1 7CB2 7CB3<br />
6R1<br />
6R2<br />
6R3<br />
6R6<br />
6R7<br />
6L1<br />
7L1<br />
6N<br />
7N<br />
PT1000<br />
200VA<br />
0<br />
0 12<br />
12<br />
696 Blk 692 Blk<br />
6R8<br />
6R9<br />
Comp 3 Comp 2<br />
Busbar<br />
Red<br />
Red<br />
Blk<br />
Red<br />
Blk<br />
Clr<br />
Comp 1<br />
Blk<br />
Pack Control<br />
Backup Primary<br />
600<br />
602<br />
Red Blk 681<br />
670<br />
Red Blk682<br />
670<br />
Red Blk 683<br />
602/600<br />
Red Blk 684<br />
Red Blk 685<br />
Red Blk 686<br />
600<br />
608<br />
613<br />
630<br />
600<br />
607<br />
612<br />
629<br />
600<br />
606<br />
611<br />
628<br />
692<br />
695<br />
696<br />
E<br />
N<br />
76<br />
77<br />
78<br />
79<br />
600<br />
602<br />
603<br />
623<br />
Wht/Brn<br />
Resistor<br />
Wht/Brn<br />
Resistor<br />
Wht/Grn<br />
Blk/Red<br />
Red/Blk<br />
Wht/Brn<br />
Wht/Brn<br />
602/600<br />
635<br />
Resistor<br />
PT1000<br />
Resistor<br />
Common Control Items<br />
Issue 3 Page - 51 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Liquid level<br />
657 658<br />
NC 650<br />
660/661<br />
NC 650<br />
6<br />
L1 L2 L3<br />
1 2<br />
N<br />
3 4<br />
24V DC PWS<br />
5 6 N<br />
2 4 6<br />
600<br />
608<br />
613<br />
630<br />
600<br />
607<br />
612<br />
629<br />
600<br />
Comp 3Comp<br />
2<br />
606<br />
611<br />
Red<br />
628<br />
Blk<br />
Red<br />
Blk<br />
692<br />
695<br />
696<br />
Comp 1<br />
Red<br />
Clr<br />
Blk<br />
Delay<br />
Between<br />
Stage<br />
Increase<br />
5s<br />
E<br />
10s<br />
N<br />
15s<br />
20s<br />
30s<br />
I1 I12<br />
RESOURCE DATA MANAGEMENT<br />
45s<br />
1m<br />
Delay<br />
Between<br />
Stage<br />
Dectease<br />
680<br />
681<br />
Red Blk 681<br />
670<br />
Red Blk 682<br />
670<br />
Red Blk 683<br />
602/600<br />
Red Blk 684<br />
Red Blk 685<br />
Red Blk<br />
76<br />
77<br />
78<br />
79<br />
600<br />
602<br />
603<br />
623<br />
Wht/Brn<br />
Resistor<br />
Wht/Brn<br />
Resistor<br />
Wht/Grn<br />
Blk/Red<br />
Red/Blk<br />
Wht/Brn<br />
Wht/Brn<br />
602/600<br />
635<br />
Resistor<br />
PT1000<br />
Resistor<br />
Common Control Items<br />
2m<br />
Millenium<br />
SA20<br />
O1 O2 O3/4 O5/6 O7/8<br />
5m<br />
10m<br />
1 2 3<br />
-VOut+V<br />
Power<br />
Fail<br />
+ -<br />
4 5 6<br />
OK<br />
686<br />
Liquid level<br />
657 658<br />
NC 650<br />
660/661<br />
NC 650<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
02<br />
COMMON CNTRLS LAYOUT: <strong>MSP</strong>L050/100-<strong>INV</strong><br />
02 DANFOSS COMMS MODULE MOVED<br />
N/A 02/08/06<br />
<strong>MSP</strong>L-050-634-<strong>INV</strong>.02<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
06/07/06 1:3<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
To Controller<br />
Transducer<br />
Lead Blk/Wht<br />
Red<br />
Blk<br />
Tw Pair<br />
Screened or Tw Pair Red/Brn<br />
670<br />
Sleeved Resistor 590R<br />
Sleeved Resistor(s)<br />
1 2<br />
3 4<br />
5 6<br />
Transducer<br />
Termination<br />
Detail<br />
N<br />
E<br />
76<br />
77<br />
RDM Termination<br />
Resistor<br />
657<br />
658<br />
650<br />
PT1000<br />
Busbar<br />
Transformer MCB MCB MCB MCB MCB<br />
6CB1 6CB2 7CB1 7CB2 7CB3<br />
6R1<br />
6R2<br />
6R2<br />
6R3<br />
6R6<br />
6R7<br />
6R2-1/2<br />
6R2-3/4<br />
0<br />
220<br />
230<br />
240<br />
380<br />
400<br />
415<br />
440<br />
L1 L2 L3<br />
N<br />
N<br />
2 4 6<br />
200VA<br />
0<br />
0 12<br />
12<br />
6L1<br />
7L1<br />
6N<br />
7N<br />
600<br />
608<br />
613<br />
696 Blk 692 Blk<br />
6R8<br />
6R9<br />
Comp 3 Comp 2<br />
Red<br />
Blk<br />
Red<br />
Comp 1<br />
Clr<br />
Blk<br />
Issue 3 Page - 52 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Pack Control<br />
Backup Primary<br />
600<br />
602<br />
Red Blk 681<br />
670<br />
Red Blk 682<br />
670<br />
Red Blk 683<br />
602/600<br />
Red Blk 684<br />
Red Blk 685<br />
Red Blk 686<br />
600<br />
608<br />
613<br />
630<br />
600<br />
607<br />
612<br />
625<br />
629<br />
630<br />
600<br />
606<br />
611<br />
628<br />
692<br />
696<br />
E<br />
N<br />
76<br />
77<br />
78<br />
79<br />
600<br />
602<br />
603<br />
623<br />
Wht/Brn<br />
Resistor<br />
699<br />
Resistor<br />
Wht/Grn<br />
Blk/Red<br />
Red/Blk<br />
Wht/Brn<br />
Wht/Brn<br />
602/600<br />
635<br />
Resistor<br />
PT1000<br />
Resistor<br />
630<br />
Comp 3<br />
600<br />
607<br />
612<br />
629<br />
625<br />
630<br />
600<br />
606<br />
Comp 2<br />
611<br />
628<br />
Red<br />
Comp 1<br />
Common Control Items<br />
Blk<br />
692<br />
Red<br />
Clr<br />
696<br />
Blk<br />
E<br />
N<br />
Delay<br />
Between<br />
Stage<br />
Increase<br />
5s<br />
10s<br />
15s<br />
20s<br />
Liquid level<br />
657 658<br />
NC 650<br />
660/661<br />
NC 650<br />
30s<br />
I1 I12<br />
RESOURCE DATA MANAGEMENT<br />
24V DC PWS<br />
Delay<br />
Between<br />
Stage<br />
Dectease<br />
680<br />
681<br />
Red Blk 681<br />
670<br />
Red Blk 682<br />
670<br />
Red Blk 683<br />
602/600<br />
Red Blk 684<br />
Red Blk 685<br />
Red Blk<br />
76<br />
77<br />
78<br />
79<br />
600<br />
602<br />
603<br />
623<br />
Wht/Brn<br />
Resistor<br />
699<br />
Resistor<br />
Wht/Grn<br />
Blk/Red<br />
Red/Blk<br />
Wht/Brn<br />
Wht/Brn<br />
602/600<br />
635<br />
Resistor<br />
PT1000<br />
Resistor<br />
Common Control Items<br />
45s<br />
1m<br />
2m<br />
Millenium<br />
SA20<br />
O1 O2 O3/4 O5/6 O7/8<br />
5m<br />
10m<br />
1 2 3<br />
-VOut+V<br />
Power<br />
Fail<br />
+ -<br />
4 5 6<br />
OK<br />
686<br />
Liquid level<br />
657 658<br />
NC 650<br />
660/661<br />
NC 650<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
CCU-(080 & 100)-636-ECI<br />
02<br />
COMMON CNTRLS LAYOUT: MSHP080/100-ECI<br />
MSHP-080-636-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
24/06/05 1:3<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Pack Controller Settings<br />
Number Parameter Range Step Units Default Factory Setting Site Setting<br />
<strong>MSP</strong>050/060-<strong>INV</strong> RDM STEP CONTROLLER SETTINGS<br />
Site Setting<br />
Value Units<br />
Factory Setting<br />
Value<br />
Low High Default<br />
Parameter Name<br />
Increase Delay 5 secs 10 ins 1 min 20 secs<br />
Decrease Delay 5 secs 10 ins 1 min 20 secs<br />
Number of Stages 1 10 10 3<br />
General Alarm Delay 00:00 15:00 00:10 5:00 mm:ss<br />
Capacity Delay 00:00 99:00 00:10 5:00 mm:ss<br />
Control Fault Delay 01:00 30:00 10:00 10:00 mm:ss<br />
Millenium Software Version:- <strong>MSP</strong>50-100-<strong>INV</strong><br />
Millenium Controller Inputs and Outputs<br />
Input Input Type Application Output Output Application Control Voltage<br />
Type<br />
I1 Digital Exit Backup O1 Relay Backup Signal 24V 50Hz<br />
I2 Digital Enter Backup O2 Relay 24V 50Hz<br />
I3 N/A O3 Relay 24V 50Hz<br />
I4 N/A O4 Relay 24V 50Hz<br />
I5 Analogue Discharge Transducer O5 Relay Load Compressors Signal<br />
24V 50Hz<br />
I6 Analogue Suction Transducer O6 Relay Unload Compressors Signal 24V 50Hz<br />
I7 Analogue Wet Tech Sensor O7 Relay Wet Tech Alarm<br />
24V 50Hz<br />
I8 N/A<br />
O8 Relay 24V 50Hz<br />
I9 N/A<br />
I10 N/A<br />
I11 N/A<br />
I12<br />
P-01 Target Pressure -3.4-38.6 0.1 BAR 2 3.5<br />
P-02 Transducer Span -3.4-38.6 0.1 BAR 13 18<br />
P-03 Transducer Offset -3.4-38.6 0.1 BAR 0 0<br />
P-85 Response On 1-15 1 10 Default<br />
P-86 Response Off 1-15 1 10 Default<br />
P-04 Number of Starts/hr -60 1 6 10<br />
P-05 Optomise Limit -3.4-38.6 1 30 Default<br />
P-80 Startup delay 0-5 Mins 1 0 Default<br />
P-82 Run Smallest 0=Off 1=On 1 0 Default<br />
P-98 Probe Offset -50<br />
-3.4-38.6<br />
-3.4-38.6<br />
-3.4-38.6<br />
o C 70 o Min/Sec<br />
o<br />
C 0.1 C 0 Default<br />
P-13 HP Alarm Pressure 0.1 BAR 4.1 7.5<br />
P-14 LP Alarm Pressure 0.1 BAR 0.2 1.5<br />
P-15 Shut Down Pressure 0.1 BAR 0.1 1.2<br />
P-16 Alarm Delay 0-99 1 Min/Sec 3 Mins Default<br />
P-81 General Alarm Delay 0-60 Mins 1 Min/Sec 4 Mins 45 Mins<br />
P-22 Stage 2 Type Compressor<br />
P-23 Stage 3 Type Compressor<br />
P-24 Stage 4 Type (0) None<br />
Unused<br />
P-25 Stage 5 Type (1)Unused<br />
Unused<br />
P-26 Stage 6 Type (2)Compressor<br />
P-27 Stage 7 Type (3)Loader<br />
P-28 Stage 8 Type (4)Fan<br />
P-29 Stage 9 Type<br />
P-30 Stage 10 Type<br />
P-51 Stage 1 Size 19.8<br />
P-52 Stage 2 Size 25<br />
P-53 Stage 3 Size 55.3<br />
P-54 Stage 4 Size<br />
P-55 Stage 5 Size<br />
0-60<br />
P-56 Stage 6 Size<br />
P-57 Stage 7 Size<br />
P-58 Stage 8 Size<br />
P-59 Stage 9 Size<br />
P-60 Stage 10 Size<br />
P-41 Stage 1 Input Type N/O Compressor 1<br />
P-42 Stage2 Input Type N/O Compressor 2<br />
P-43 Stage 3 Input Type N/O Compressor 3<br />
P-44 Stage 4 Input Type Unused<br />
(0)N/O<br />
P-45 Stage 5 Input Type Unused<br />
(1)N/C<br />
P-46 Stage 6 Input Type N/O Liquid Level<br />
(2)Unused<br />
P-47 Stage 7 Input Type N/O Moisture Detected<br />
P-48 Stage 8 Input Type N/O <strong>Inverter</strong> Fault<br />
P-49 Stage 9 Input Type<br />
P-50 Stage 10 Input Type<br />
Issue 3 Page - 53 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
PART<br />
RDM PACK & CONDENSER CONT <strong>MSP</strong>050-<strong>INV</strong><br />
DATE SCALE<br />
31/05/06 1:1<br />
01<br />
<strong>MSP</strong>-050-630-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Pack Controller Settings<br />
<strong>MSP</strong>050/060-<strong>INV</strong> RDM STEP CONTROLLER SETTINGS<br />
Site Setting<br />
Value Units<br />
Factory Setting<br />
Value<br />
Low High Default<br />
Parameter Name<br />
Increase Delay 5 secs 10 ins 1 min 20 secs<br />
Decrease Delay 5 secs 10 ins 1 min 20 secs<br />
Number of Stages 1 10 10 3<br />
General Alarm Delay 00:00 15:00 00:10 5:00 mm:ss<br />
Capacity Delay 00:00 99:00 00:10 5:00 mm:ss<br />
Control Fault Delay 01:00 30:00 10:00 10:00 mm:ss<br />
Millenium Software Version:- <strong>MSP</strong>50-100-<strong>INV</strong><br />
Millenium Controller Inputs and Outputs<br />
Input Input Type Application Output Output Application Control<br />
Type<br />
Voltage<br />
I1 Digital Exit Backup O1 Relay Backup Signal 24V 50Hz<br />
I2 Digital Enter Backup O2 Relay 24V 50Hz<br />
I3 N/A O3 Relay 24V 50Hz<br />
I4 N/A O4 Relay 24V 50Hz<br />
I5 Analogue Discharge Transducer O5 Relay Load Compressors Signal<br />
24V 50Hz<br />
I6 Analogue Suction Transducer O6 Relay Unload Compressors Signal 24V 50Hz<br />
I7 Analogue Wet Tech Sensor O7 Relay Wet Tech Alarm<br />
24V 50Hz<br />
I8 N/A<br />
O8 Relay 24V 50Hz<br />
I9 N/A<br />
I10 N/A<br />
I11 N/A<br />
I12<br />
Number Parameter Range Step Units Default Factory Setting Site Setting<br />
P-01 Target Pressure -3.4 - 38.6 0.1 BAR 2 3.5<br />
P-02 Transducer Span -3.4 - 38.6 0.1 BAR 13 18<br />
P-03 Transducer Offset -3.4 - 38.6 0.1 BAR 0 0<br />
P-85 Response On 1-15 1 10 Default<br />
P-86 Response Off 1-15 1 10 Default<br />
P-04 Number of Starts/hr --60 1 6 10<br />
P-05 Optomise Limit -50-560 1 30 Default<br />
P-80 Startup delay 0-5 Mins 1 0 Default<br />
P-82 Run Smallest 0=Off 1=On 1 0 Default<br />
P-98 Probe Offset -50<br />
-3.4 - 38.6<br />
-3.4 - 38.6<br />
-3.4 - 38.6<br />
o C 70 o Min/Sec<br />
o<br />
C 0.1 C 0 Default<br />
P-13 HP Alarm Pressure 0.1 BAR 4.1 7.5<br />
P-14 LP Alarm Pressure 0.1 BAR 0.2 1.5<br />
P-15 0.1 BAR 0.1 1.2<br />
P-16 Alarm Delay 0-99 1 Min/Sec 3 Mins Default<br />
P-81 0-60 Mins 1 Min/Sec 4 Mins 45 Mins<br />
P-22 Stage 2 Type Compressor<br />
P-23 Stage 3 Type Compressor<br />
P-24 Stage 4 Type (0) None<br />
Unused<br />
P-25 Stage 5 Type (1)Unused<br />
Unused<br />
P-26 Stage 6 Type (2)Compressor<br />
P-27 Stage 7 Type (3)Loader<br />
P-28 Stage 8 Type (4)Fan<br />
P-29 Stage 9 Type<br />
P-30 Stage 10 Type<br />
P-51 Stage 1 Size 21<br />
P-52 Stage 2 Size 25.6<br />
P-53 Stage 3 Size 53.4<br />
P-54 Stage 4 Size<br />
P-55 Stage 5 Size<br />
0-60<br />
P-56 Stage 6 Size<br />
P-57 Stage 7 Size<br />
P-58 Stage 8 Size<br />
P-59 Stage 9 Size<br />
P-60 Stage 10 Size<br />
P-41 Stage 1 Input Type N/O Compressor 1<br />
P-42 Stage2 Input Type N/O Compressor 2<br />
P-43 Stage 3 Input Type N/O Compressor 3<br />
P-44 Stage 4 Input Type Unused<br />
(0)N/O<br />
P-45 Stage 5 Input Type Unused<br />
(1)N/C<br />
P-46 Stage 6 Input Type N/O Liquid Level<br />
(2)Unused<br />
P-47 Stage 7 Input Type N/O Moisture Detected<br />
P-48 Stage 8 Input Type N/O <strong>Inverter</strong> Fault<br />
P-49 Stage 9 Input Type<br />
P-50 Stage 10 Input Type<br />
Issue 3 Page - 54 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
PART<br />
RDM PACK & CONDENSER CONT <strong>MSP</strong>060-<strong>INV</strong><br />
DATE SCALE<br />
31/05/06 1:1<br />
01<br />
<strong>MSP</strong>-060-630-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
Pack Controller Settings<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
<strong>MSP</strong>050/060-<strong>INV</strong> RDM STEP CONTROLLER SETTINGS<br />
Site Setting<br />
Value Units<br />
Factory Setting<br />
Value<br />
Low High Default<br />
Parameter Name<br />
Increase Delay 5 secs 10 ins 1 min 20 secs<br />
Decrease Delay 5 secs 10 ins 1 min 20 secs<br />
Number of Stages 1 10 10 3<br />
General Alarm Delay 00:00 15:00 00:10 5:00 mm:ss<br />
Capacity Delay 00:00 99:00 00:10 5:00 mm:ss<br />
Control Fault Delay 01:00 30:00 10:00 10:00 mm:ss<br />
Millenium Software Version:- <strong>MSP</strong>50-100-<strong>INV</strong><br />
Millenium Controller Inputs and Outputs<br />
Input Input Type Application Output Output Application Control<br />
Type<br />
Voltage<br />
I1 Digital Exit Backup O1 Relay Backup Signal 24V 50Hz<br />
I2 Digital Enter Backup O2 Relay 24V 50Hz<br />
I3 N/A O3 Relay 24V 50Hz<br />
I4 N/A O4 Relay 24V 50Hz<br />
I5 Analogue Discharge Transducer O5 Relay Load Compressors Signal 24V 50Hz<br />
I6 Analogue Suction Transducer O6 Relay Unload Compressors Signal 24V 50Hz<br />
I7 Analogue Wet Tech Sensor O7 Relay Wet Tech Alarm<br />
24V 50Hz<br />
I8 N/A<br />
O8 Relay 24V 50Hz<br />
I9 N/A<br />
I10 N/A<br />
I11 N/A<br />
I12<br />
Number Parameter Range Step Units Default Factory Setting Site Setting<br />
P-01 Target Pressure -3.4-38.6 0.1 BAR 2 3.5<br />
P-02 Transducer Span -3.4-38.6 0.1 BAR 13 18<br />
P-03 Transducer Offset -3.4-38.6 0.1 BAR 0 0<br />
P-85 Response On 1-15 1 10 Default<br />
P-86 Response Off 1-15 1 10 Default<br />
P-04 -60 1 6 10<br />
P-05 Optomise Limit -3.4-38.6 1 30 Default<br />
P-80 Startup delay 0-5 Mins 1 0 Default<br />
P-82 Run Smallest 0=Off 1=On 1 0 Default<br />
P-98 Probe Offset -50<br />
-3.4-38.6<br />
-3.4-38.6<br />
o C 70 o Min/Sec<br />
o<br />
C 0.1 C 0 Default<br />
P-13 HP Alarm Pressure 0.1 BAR 4.1 7.5<br />
P-14 LP Alarm Pressure 0.1 BAR 0.2 1.5<br />
P-15 -3.4-38.6 0.1 BAR 0.1 1.2<br />
P-16 Alarm Delay 0-99 1 Min/Sec 3 Mins Default<br />
P-81 0-60 Mins 1 Min/Sec 4 Mins 45 Mins<br />
P-22 Stage 2 Type Compressor<br />
P-23 Stage 3 Type Loader<br />
P-24 Stage 4 Type (0) None<br />
Compressor<br />
P-25 Stage 5 Type (1)Unused<br />
Unused<br />
P-26 Stage 6 Type (2)Compressor<br />
P-27 Stage 7 Type (3)Loader<br />
P-28 Stage 8 Type (4)Fan<br />
P-29 Stage 9 Type<br />
P-30 Stage 10 Type<br />
P-51 Stage 1 Size 19.2<br />
P-52 Stage 2 Size 17.5<br />
P-53 Stage 3 Size 17.5<br />
P-54 Stage 4 Size<br />
45.8<br />
P-55 Stage 5 Size<br />
0-60<br />
P-56 Stage 6 Size<br />
P-57 Stage 7 Size<br />
P-58 Stage 8 Size<br />
P-59 Stage 9 Size<br />
P-60 Stage 10 Size<br />
P-41 Stage 1 Input Type N/O Compressor 1<br />
P-42 Stage2 Input Type N/O Compressor 2<br />
P-43 Stage 3 Input Type N/O Compressor 2<br />
P-44 Stage 4 Input Type<br />
(0)N/O<br />
N/O<br />
Compressor 3<br />
P-45 Stage 5 Input Type Unused<br />
(1)N/C<br />
P-46 Stage 6 Input Type N/O Liquid Level<br />
(2)Unused<br />
P-47 Stage 7 Input Type N/O Moisture Detected<br />
P-48 Stage 8 Input Type N/O <strong>Inverter</strong> Fault<br />
P-49 Stage 9 Input Type<br />
P-50 Stage 10 Input Type<br />
Issue 3 Page - 55 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
01<br />
RDM PACK & CONDENSER CONT <strong>MSP</strong>080-<strong>INV</strong><br />
<strong>MSP</strong>-080-630-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
09/03/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
6<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 6. Wiring Diagrams<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Pack Controller Settings<br />
No. Parameter Range Step Units Default Factory Setting Site Setting<br />
P-01 Target Pressure FALSE 0.1 BAR 2 3.5<br />
P-02 Transducer Span FALSE 0.1 BAR 13 18<br />
P-03 Transducer Offset FALSE 0.1 BAR 0 0<br />
P-85 Response On 1-15 1 10 Default<br />
P-86 Response Off 1-15 1 10 Default<br />
P-04 Number of Starts/hr --60 1 6 10<br />
P-05 Optimise Limit -50-560 1 30 Default<br />
P-80 Startup delay 0-5 Mins 1 Min/Sec 0 Default<br />
<strong>MSP</strong>050/060-<strong>INV</strong> RDM STEP CONTROLLER SETTINGS<br />
Site Setting<br />
Value Units<br />
Factory Setting<br />
Value<br />
Low High Default<br />
Parameter Name<br />
Increase Delay 5 secs 10 ins 1 min 20 secs<br />
Decrease Delay 5 secs 10 ins 1 min 20 secs<br />
Number of Stages 1 10 10 3<br />
General Alarm Delay 00:00 15:00 00:10 5:00 mm:ss<br />
Capacity Delay 00:00 99:00 00:10 5:00 mm:ss<br />
Control Fault Delay 01:00 30:00 10:00 10:00 mm:ss<br />
Millenium Controller Inputs and Outputs<br />
Input Input Type Application Output Output Application Control Voltage<br />
Type<br />
I1 Digital Exit Backup O1 Relay Backup Signal 24V 50Hz<br />
I2 Digital Enter Backup O2 Relay 24V 50Hz<br />
I3 N/A O3 Relay 24V 50Hz<br />
I4 N/A O4 Relay 24V 50Hz<br />
I5 Analogue Discharge Transducer O5 Relay Load Compressors Signal 24V 50Hz<br />
I6 Analogue Suction Transducer O6 Relay Unload Compressors Signal 24V 50Hz<br />
I7 Analogue Wet Tech Sensor O7 Relay Wet Tech Alarm<br />
24V 50Hz<br />
I8 N/A<br />
O8 Relay 24V 50Hz<br />
I9 N/A<br />
I10 N/A<br />
I11 N/A<br />
I12<br />
P-82 Run Smallest 0=Off 1=On 1 0 Default<br />
P-98 Probe Offset -50 o C 70 o o<br />
C 0.1 C 0 Default<br />
P-13 HP Alarm Pressure FALSE 0.1 BAR 4.1 7.5<br />
P-14 LP Alarm Pressure FALSE 0.1 BAR 0.2 1.5<br />
P-15 Shut Down Pressure FALSE 0.1 BAR 0.1 1.2<br />
P-16 Alarm Delay 0-99 1 Min/Sec 3 Mins Default<br />
P-81 General Alarm Delay 0-60 Mins 1 Min/Sec 4 Mins 45 Mins<br />
P-22 Stage 2 Type Compressor<br />
P-23 Stage 3 Type Loader<br />
P-24 Stage 4 Type (0) None<br />
Compressor<br />
P-25 Stage 5 Type (1)Unused<br />
Unused<br />
P-26 Stage 6 Type (2)Compressor<br />
P-27 Stage 7 Type (3)Loader<br />
P-28 Stage 8 Type (4)Fan<br />
P-29 Stage 9 Type<br />
P-30 Stage 10 Type<br />
P-51 Stage 1 Size 17.5<br />
P-52 Stage 2 Size 17.7<br />
P-53 Stage 3 Size 17.7<br />
P-54 Stage 4 Size<br />
47.2<br />
P-55 Stage 5 Size<br />
0-60<br />
P-56 Stage 6 Size<br />
P-57 Stage 7 Size<br />
P-58 Stage 8 Size<br />
P-59 Stage 9 Size<br />
P-60 Stage 10 Size<br />
P-41 Stage 1 Input Type N/O Compressor 1<br />
P-42 Stage2 Input Type N/O Compressor 2<br />
P-43 Stage 3 Input Type N/O Compressor 2<br />
P-44 Stage 4 Input Type N/O<br />
(0)N/O<br />
Compressor 3<br />
P-45 Stage 5 Input Type Unused<br />
(1)N/C<br />
P-46 Stage 6 Input Type N/O Liquid Level<br />
(2)Unused<br />
P-47 Stage 7 Input Type N/O Moisture Detected<br />
P-48 Stage 8 Input Type N/O <strong>Inverter</strong> Fault<br />
P-49 Stage 9 Input Type<br />
P-50 Stage 10 Input Type<br />
Issue 3 Page - 56 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
Millenium Software Version:- <strong>MSP</strong>50-100-<strong>INV</strong><br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
01<br />
RDM PACK & CONDENSER CONT <strong>MSP</strong>100-<strong>INV</strong><br />
<strong>MSP</strong>-100-630-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
01/06/06 1:1<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
EW<br />
EW<br />
ISS MODIFICATION SCN DATE<br />
6
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
Issue 3 Page - 57 -<br />
September 2007<br />
7. Controls Logic INDEX<br />
Page No’s Issue No<br />
7.1 Compressor Sequencing 58 1<br />
7.1.1 Main Control – RDM Controller 58 1<br />
7.1.2 Backup Control, all units 58 1<br />
7.2 Compressor Safety Pressure Switches 59 1<br />
7.3 Controller Settings<br />
7.3.1 <strong>MSP</strong>050-<strong>INV</strong> Main Controller 60 1<br />
7.3.2 <strong>MSP</strong>060-<strong>INV</strong> Main Controller 61 1<br />
7.3.3 <strong>MSP</strong>080-<strong>INV</strong> Main Controller 62 1<br />
7.3.4 <strong>MSP</strong>100-<strong>INV</strong> Main Controller 63 1<br />
7.3.5 <strong>MSP</strong> Comp Backup Controller (RDM) 64 1<br />
7.3.6 <strong>MSP</strong> Main Controller Alarm Alias’s 64 1<br />
7.3.7 Millenium Backup Controller 64 1<br />
7.3.7.1 Millenium Control General 64 1<br />
7.3.7.2 Millenium Setting Adjustment 65 1<br />
7.3.7.3 Millenium Controller Factory Settings 65 1<br />
7.4 <strong>MSP</strong>-<strong>INV</strong>, MSHP, <strong>MSP</strong>L <strong>Inverter</strong> Settings 66 � 70 1<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
7.1 Compressor Sequencing<br />
Issue 3 Page - 58 -<br />
September 2007<br />
The <strong>MSP</strong>-<strong>INV</strong> range consists of 4 models, each with nominal capacities of 50, 60, 80 and 100 kw, fitted<br />
with RDM Mercury controls, hence named <strong>MSP</strong>050-<strong>INV</strong>, <strong>MSP</strong>60-<strong>INV</strong>, <strong>MSP</strong>80-<strong>INV</strong>, <strong>MSP</strong>100-<strong>INV</strong>.<br />
The controls are effectively the same for all three units, with the only difference being the <strong>MSP</strong>080 and<br />
100, which include a Cylinder Head unloader on the second compressor.<br />
All main controls are 24V AC 50Hz.<br />
Units also incorporate 240V and 415V Components.<br />
7.1.1 Main Control – RDM Controller<br />
The main control for <strong>MSP</strong>–<strong>INV</strong> unit’s compressor sequencing is the RDM Mercury 11-10V controller. The<br />
controller monitors the suction pressure transducer, it outputs a 0-10V signal to the inverter which runs<br />
the first compressor’s speed from 20Hz to 60Hz in response to the suction pressure changes.<br />
When the first compressor is running at full speed the controller stages in the second and third<br />
compressors as required to achieve the required duty. When a new compressor stage is bought in the<br />
inverter compressor drops back to minimum speed, and then modulates as required.<br />
Compressors 2 and 3 are fixed single speed units.<br />
Compressor control is achieved using the ‘Section 1’ parameters of the controller.<br />
The controller is factory set to maintain a suction pressure of 3.5 Barg (-9°C R404A).<br />
The RDM controller uses ‘Fuzzy-Logic’ to determine which compressors to run based on their equivalent<br />
size and deviation from the measured pressure to the set point.<br />
Fig. 8 RDM Main control<br />
7.1.2 Backup Control, all units<br />
Should the main controller fail or if the millennium controller detects an out of range suction pressure the<br />
backup controller is initiated and control transferred over from the main controller.<br />
The compressor backup controller uses an RDM step controller type 6-10.<br />
RDM 6-10 : the controller receives a signal from the Millennium controller to Stage Down or Stage Up.<br />
When a Stage up signal is received the next compressor stage is brought in after the delay on time,<br />
when a stage down signal is received the last compressor stage running is brought out after the delay<br />
off time.<br />
Compressors are sequenced in a simple 1 on, 2 on, 3 on manner with the first inverter compressor being<br />
run at 100% full speed.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
Issue 3 Page - 59 -<br />
September 2007<br />
Fig. 9 RDM Backup<br />
7.2 Compressor Safety Pressure Switches<br />
All compressors are protected by a pair of safety pressure switches directly mounted to the compressor<br />
heads. The LP switch (200-404-031), will cut the compressor out at 0.7 BarG, and cut back in at 2.2<br />
BarG. The HP switch (200-404-032), will cut the compressor out at 22.0 BarG, and cut back in at 16.0<br />
BarG. Both switches are Auto-Reset.<br />
Compressors fitted with an oil pump are also protected with a Oil Pressure monitoring sensor.<br />
(<strong>MSP</strong>100 = 2 & 3, <strong>MSP</strong>080 = Comp 3, <strong>MSP</strong>060 & <strong>MSP</strong>050 no oil sensors), this device monitors the pump<br />
outlet pressure and trips out should the pressure fall below a set level. The device is factory set and can<br />
not be adjusted. Should an Oil Differential switch trip a manual reset is required.<br />
In addition to this, all compressors are protected by a combined HP/LP switch, which trips should the<br />
unit try to operate outside of its application envelope.<br />
All compressor switches are directly mounted to the compressor HP and LP connections They are<br />
connected to the relevant compressor via a ¼” Schraeder connection.<br />
Should a switch require replacement or disconnection follow the procedure in 4.5.2 on page 21.<br />
Note : When removing a pressure switch from the compressor body take care not to unscrew the<br />
1/8” NPT to 1/4" flare adapter beneath the hose connection.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
7.3 Controller Settings<br />
7.3.1 <strong>MSP</strong>050-<strong>INV</strong> Main Controller Settings<br />
Issue 3 Page - 60 -<br />
September 2007<br />
Number Parameter Range Step Units Default Factory Setting Site Setting<br />
P-01 Target Pressure -3.4 – 38.6 0.1 BAR 2 3.5<br />
P-02 Transducer Span -3.4 – 38.6 0.1 BAR 13 18<br />
P-03 Transducer Offset -3.4 – 38.6 0.1 BAR 0 0<br />
P-85 Response On 1-15 1 10 10<br />
P-86 Response Off 1-15 1 10 10<br />
P-04 Number of Starts/hr 0 - 60 1 6 10<br />
P-05 Optimise Limit -3.4 – 38.6 1 BAR 2 2<br />
P-80 Startup Delay 0 - 5 mins 1 mins/sec 0 0<br />
P-82 Run Smallest 0 = off, 1 = on 1 0 0<br />
P-98 Probe Offset -50°C - 70°C 0.1 °C 0 0<br />
P-13 HP Alarm Pressure -3.4 – 38.6 0.1 BAR 4.1 7.5<br />
P-14 LP Alarm Pressure -3.4 – 38.6 0.1 BAR 0.2 1.5<br />
P-15 LP Shut-down Pressure -3.4 – 38.6 0.1 BAR 0.1 1.2<br />
P-16 Alarm Delay 0 - 99 1 mins 3 3<br />
P-81 General Alarm Delay 0 - 60 mins 1 mins/sec 4 45<br />
P-22 Stage 2 Type (0) None, 0 2 (Comp)<br />
P-23 Stage 3 Type (1) Unused, 0 2 (Comp)<br />
P-24 Stage 4 Type (2) Compressor, 0 1<br />
P-25 Stage 5 Type (3) Loader, 0 1<br />
P-26 Stage 6 Type (4) Fan 0 0<br />
P-27 Stage 7 Type 0 0<br />
P-28 Stage 8 Type 0 0<br />
P-29 Stage 9 Type 0 0<br />
P-30 Stage 10 type 0 0<br />
P-51 Stage 1 Size 0-60 1 0 19.8<br />
P-52 Stage 2 size 0 25<br />
P-53 Stage 3 size 0 55.3<br />
P-54 Stage 4 size 0 0<br />
P-55 Stage 5 size 0 0<br />
P-56 Stage 6 size 0 0<br />
P-57 Stage 7 size 0 0<br />
P-58 Stage 8 size 0 0<br />
P-59 Stage 9 size 0 0<br />
P-60 Stage 10 size 0 0<br />
P-41 Stage 1 Input Type (0) N/O 2 0 Compressor 1<br />
P-42 Stage 2 Input Type (1) N/C 2 0 Compressor 2<br />
P-43 Stage 3 Input Type (2) Unused, 2 0 Compressor 3<br />
P-44 Stage 4 Input Type 2 2<br />
P-45 Stage 5 Input Type 2 2<br />
P-46 Stage 6 Input Type 2 0 Liquid Level<br />
P-47 Stage 7 Input Type 2 0 Moisture Detected<br />
P-48 Stage 8 Input Type 2 0 <strong>Inverter</strong> Fault<br />
P-49 Stage 9 Input Type 2 2<br />
P-50 Stage 10 Input Type 2 2<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
7.3.2 <strong>MSP</strong>060-RDM Main Controller Settings<br />
Issue 3 Page - 61 -<br />
September 2007<br />
Number Parameter Range Step Units Default Factory Setting Site Setting<br />
P-01 Target Pressure -3.4 – 38.6 0.1 BAR 2 3.5<br />
P-02 Transducer Span -3.4 – 38.6 0.1 BAR 13 18<br />
P-03 Transducer Offset -3.4 – 38.6 0.1 BAR 0 0<br />
P-85 Response On 1-15 1 10 10<br />
P-86 Response Off 1-15 1 10 10<br />
P-04 Number of Starts/hr 0 - 60 1 6 10<br />
P-05 Optimise Limit -3.4 – 38.6 1 BAR 2 2<br />
P-80 Startup Delay 0 - 5 mins 1 mins/sec 0 0<br />
P-82 Run Smallest 0 = off, 1 = on 1 0 0<br />
P-98 Probe Offset -50°C - 70°C 0.1 °C 0 0<br />
P-13 HP Alarm Pressure -3.4 – 38.6 0.1 BAR 4.1 7.5<br />
P-14 LP Alarm Pressure -3.4 – 38.6E 0.1 BAR 0.2 1.5<br />
P-15 LP Shut-down Pressure -3.4 – 38.6 0.1 BAR 0.1 1.2<br />
P-16 Alarm Delay 0 - 99 1 mins 3 3<br />
P-81 General Alarm Delay 0 - 60 mins 1 mins/sec 4 45<br />
P-22 Stage 2 Type (0) None, 0 2 (Comp)<br />
P-23 Stage 3 Type (1) Unused, 0 2 (Comp)<br />
P-24 Stage 4 Type (2) Compressor, 0 1<br />
P-25 Stage 5 Type (3) Loader, 0 1<br />
P-26 Stage 6 Type (4) Fan 0 0<br />
P-27 Stage 7 Type 0 0<br />
P-28 Stage 8 Type 0 0<br />
P-29 Stage 9 Type 0 0<br />
P-30 Stage 10 type 0 0<br />
P-51 Stage 1 Size 0-60 1 0 21<br />
P-52 Stage 2 size 0 25.6<br />
P-53 Stage 3 size 0 53.4<br />
P-54 Stage 4 size 0 0<br />
P-55 Stage 5 size 0 0<br />
P-56 Stage 6 size 0 0<br />
P-57 Stage 7 size 0 0<br />
P-58 Stage 8 size 0 0<br />
P-59 Stage 9 size 0 0<br />
P-60 Stage 10 size 0 0<br />
P-41 Stage 1 Input Type (0) N/O 2 0 Compressor 1<br />
P-42 Stage 2 Input Type (1) N/C 2 0 Compressor 2<br />
P-43 Stage 3 Input Type (2) Unused, 2 0 Compressor 3<br />
P-44 Stage 4 Input Type 2 2<br />
P-45 Stage 5 Input Type 2 2<br />
P-46 Stage 6 Input Type 2 0 Liquid Level<br />
P-47 Stage 7 Input Type 2 0 Moisture Detected<br />
P-48 Stage 8 Input Type 2 0 <strong>Inverter</strong> Fault<br />
P-49 Stage 9 Input Type 2 2<br />
P-50 Stage 10 Input Type 2 2<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
7.3.3 <strong>MSP</strong>080-RDM Main Controller Settings<br />
Issue 3 Page - 62 -<br />
September 2007<br />
Number Parameter Range Step Units Default Factory Setting Site Setting<br />
P-01 Target Pressure -3.4 – 38.6 0.1 BAR 2 3.5<br />
P-02 Transducer Span -3.4 – 38.6 0.1 BAR 13 18<br />
P-03 Transducer Offset -3.4 – 38.6 0.1 BAR 0 0<br />
P-85 Response On 1-15 1 10 10<br />
P-86 Response Off 1-15 1 10 10<br />
P-04 Number of Starts/hr 0 - 60 1 6 10<br />
P-05 Optimise Limit -3.4 – 38.6 1 BAR 2 2<br />
P-80 Startup Delay 0 - 5 mins 1 mins/sec 0 0<br />
P-82 Run Smallest 0 = off, 1 = on 1 0 0<br />
P-98 Probe Offset -50°C - 70°C 0.1 °C 0 0<br />
P-13 HP Alarm Pressure -3.4 – 38.6 0.1 BAR 4.1 7.5<br />
P-14 LP Alarm Pressure -3.4 – 38.6 0.1 BAR 0.2 1.5<br />
P-15 LP Shut-down Pressure -3.4 – 38.6 0.1 BAR 0.1 1.2<br />
P-16 Alarm Delay 0 - 99 1 mins 3 3<br />
P-81 General Alarm Delay 0 - 60 mins 1 mins/sec 4 45<br />
P-22 Stage 2 Type (0) None, 0 2 (Comp)<br />
P-23 Stage 3 Type (1) Unused, 0 3 (Loader)<br />
P-24 Stage 4 Type (2) Compressor, 0 2 (Comp)<br />
P-25 Stage 5 Type (3) Loader, 0 1<br />
P-26 Stage 6 Type (4) Fan 0 0<br />
P-27 Stage 7 Type 0 0<br />
P-28 Stage 8 Type 0 0<br />
P-29 Stage 9 Type 0 0<br />
P-30 Stage 10 type 0 0<br />
P-51 Stage 1 Size 0-60 1 0 19.2<br />
P-52 Stage 2 size 0 17.5<br />
P-53 Stage 3 size 0 17.5<br />
P-54 Stage 4 size 0 45.8<br />
P-55 Stage 5 size 0 0<br />
P-56 Stage 6 size 0 0<br />
P-57 Stage 7 size 0 0<br />
P-58 Stage 8 size 0 0<br />
P-59 Stage 9 size 0 0<br />
P-60 Stage 10 size 0 0<br />
P-41 Stage 1 Input Type (0) N/O 2 0 Compressor 1<br />
P-42 Stage 2 Input Type (1) N/C 2 0 Compressor 2<br />
P-43 Stage 3 Input Type (2) Unused, 2 0 Compressor 2<br />
P-44 Stage 4 Input Type 2 0 Compressor 3<br />
P-45 Stage 5 Input Type 2 2<br />
P-46 Stage 6 Input Type 2 0 Liquid Level<br />
P-47 Stage 7 Input Type 2 0 Moisture Detected<br />
P-48 Stage 8 Input Type 2 0 <strong>Inverter</strong> Fault<br />
P-49 Stage 9 Input Type 2 2<br />
P-50 Stage 10 Input Type 2 2<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
7.3.4 <strong>MSP</strong>100 Main Controller Settings<br />
Issue 3 Page - 63 -<br />
September 2007<br />
Number Parameter Range Step Units Default Factory Setting Site Setting<br />
P-01 Target Pressure -3.4 – 38.6 0.1 BAR 2 3.5<br />
P-02 Transducer Span -3.4 – 38.6 0.1 BAR 13 18<br />
P-03 Transducer Offset -3.4 – 38.6 0.1 BAR 0 0<br />
P-85 Response On 1-15 1 10 10<br />
P-86 Response Off 1-15 1 10 10<br />
P-04 Number of Starts/hr 0 - 60 1 6 10<br />
P-05 Optimise Limit -3.4 – 38.6 1 BAR 2 2<br />
P-80 Startup Delay 0 - 5 mins 1 mins/sec 0 0<br />
P-82 Run Smallest 0 = off, 1 = on 1 0 0<br />
P-98 Probe Offset -50°C - 70°C 0.1 °C 0 0<br />
P-13 HP Alarm Pressure -3.4 – 38.6 0.1 BAR 4.1 7.5<br />
P-14 LP Alarm Pressure -3.4 – 38.6 0.1 BAR 0.2 1.5<br />
P-15 LP Shut-down Pressure -3.4 – 38.6 0.1 BAR 0.1 1.2<br />
P-16 Alarm Delay 0 - 99 1 mins 3 3<br />
P-81 General Alarm Delay 0 - 60 mins 1 mins/sec 4 45<br />
P-22 Stage 2 Type (0) None, 0 2 (Comp)<br />
P-23 Stage 3 Type (1) Unused, 0 3 (Loader)<br />
P-24 Stage 4 Type (2) Compressor, 0 2 (Comp)<br />
P-25 Stage 5 Type (3) Loader, 0 1<br />
P-26 Stage 6 Type (4) Fan 0 0<br />
P-27 Stage 7 Type 0 0<br />
P-28 Stage 8 Type 0 0<br />
P-29 Stage 9 Type 0 0<br />
P-30 Stage 10 type 0 0<br />
P-51 Stage 1 Size 0-60 1 0 17.5<br />
P-52 Stage 2 size 0 17.7<br />
P-53 Stage 3 size 0 17.7<br />
P-54 Stage 4 size 0 47.2<br />
P-55 Stage 5 size 0 0<br />
P-56 Stage 6 size 0 0<br />
P-57 Stage 7 size 0 0<br />
P-58 Stage 8 size 0 0<br />
P-59 Stage 9 size 0 0<br />
P-60 Stage 10 size 0 0<br />
P-41 Stage 1 Input Type (0) N/O 2 0 Compressor 1<br />
P-42 Stage 2 Input Type (1) N/C 2 0 Compressor 2<br />
P-43 Stage 3 Input Type (2) Unused, 2 0 Compressor 2<br />
P-44 Stage 4 Input Type 2 0 Compressor 3<br />
P-45 Stage 5 Input Type 2 2<br />
P-46 Stage 6 Input Type 2 0 Liquid Level<br />
P-47 Stage 7 Input Type 2 0<br />
Moisture<br />
Detected<br />
P-48 Stage 8 Input Type 2 0 <strong>Inverter</strong> Fault<br />
P-49 Stage 9 Input Type 2 2<br />
P-50 Stage 10 Input Type 2 2<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
7.3.5 <strong>MSP</strong> Compressor Backup Controller (RDM Stepper) – All Units<br />
Issue 3 Page - 64 -<br />
September 2007<br />
Parameter Name Low High Default Factory Setting Value Site Setting Value Units<br />
Increase Delay 5 secs 10 ins 1 min 20 secs<br />
Decrease Delay 5 secs 10 ins 1 min 20 secs<br />
Number of Stages 1 10 10 3<br />
General Alarm Delay 00:00 15:00 00:10 5:00 mm:ss<br />
Capacity Delay 00:00 99:00 00:10 5:00 mm:ss<br />
Control Fault Delay 01:00 30:00 10:00 10:00 mm:ss<br />
7.3.6 <strong>MSP</strong> Main Controller Alarm Alias’s (RDM) – All Units<br />
All <strong>MSP</strong> main controllers are factory set with the alarm names or ‘Aliases’ as shown in the tables above,<br />
these relate to the controller input that the alarm is ‘hard-wired’ into.<br />
To simplify identification it is recommended that these alarm Aliases are changed to reflect the nature of<br />
the alarm. This can be done on the Front End Data Director terminal, via the set-up options.<br />
Alarm aliases are as follows :<br />
RDM Controller Reading Alarm Delay Function<br />
(Factory Setting)<br />
(New Alarm Alias)<br />
Section 1 Stage 1 None Compressor No 1 Fault<br />
Section 1 Stage 2 None Compressor No 2 Fault<br />
Section 1 Stage 3 None Compressor No 3 Fault<br />
General Fault 1 45 Mins Low Liquid Level<br />
General Fault 2 45 Mins Moisture Detected<br />
Important : Changes to the Front End information must only be made by authorised<br />
personnel, if in doubt please contact RDM.<br />
The ‘Run Smallest’ setting in the compressor controls options should not be enabled as it<br />
will continue to hold off all other compressors if compressor 1 is held out on it’s anti cycle<br />
timer. This will cause the backup system to intervene and flag up an alarm on the network.<br />
The settings shown in this document must be adhered to, changes to the controller settings<br />
that cause undesirable operation will invalidate the unit warranty.<br />
7.3.7 Millennium Backup Controller<br />
7.3.7.1 General<br />
The Controller will monitor the operation of the Pack arrangement and if the Suction or Discharge<br />
pressures stray above the pre-set limits the controller will intervene and take over control of the Pack. If<br />
and when the suction pressure returns and remains within or below the preset dead band parameters<br />
the <strong>MSP</strong> will return to main control after a period of 10 minutes. Backup can be forced in or cancelled<br />
from the Main Controls panel front switch and reset button. The moisture content of the refrigerant is<br />
also monitored via the KMC moisture sensor, commonly known as Wet Tech and the controller will<br />
provide an alarm to the main RDM controller and controls panel above a preset level.<br />
For MSHP units the controller will monitor the Housing temperature and run the Unit Cooler if required.<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
Issue 3 Page - 65 -<br />
September 2007<br />
Millennium Controller Inputs and Outputs<br />
Input Input Type Application Output Output<br />
Type<br />
Application Control Voltage<br />
I1 Digital Exit Backup O1 Relay Backup Signal 24V DC<br />
I2 Digital Enter Backup O2 Relay 24V 50Hz<br />
I3 N/A O3 Relay 24V 50Hz<br />
I4 N/A O4 Relay 24V 50Hz<br />
I5 Analogue Discharge Transducer O5 Relay Load Compressors Signal RDM Control<br />
I6 Analogue Suction Transducer O6 Relay Unload Compressors Signal RDM Control<br />
I7 Analogue Wet Tech Sensor O7 Relay Wet Tech Alarm 24V 50Hz<br />
I8 N/A<br />
I9 N/A<br />
I10 N/A<br />
I11 N/A<br />
I12 N/A<br />
7.3.7.2 Millenium Controller Settings Adjustment<br />
The Controller Default Settings may entered at any time by pressing the buttons + and – at the same<br />
time. To adjust the parameter values press and hold down button A for 5 seconds. Use either the + or –<br />
buttons to alter the settings, and then press OK to move to the next parameter. To exit press the Esc<br />
button, the controller will exit the setting mode after 3 minutes automatically, see Fig. 10.<br />
Fig. 10<br />
The fixed and adjustable settings are shown below.<br />
‘+’ Button : Raise Parameter setting<br />
OK Button : Move to next Parameter<br />
‘-’ Button : Lower Parameter setting<br />
(Hold both + & - to restore Factory Defaults)<br />
ESC Button : Exit Parameter Setup<br />
Button B : No Function<br />
Button A : Enter Parameter Setup<br />
(Hold for 5 seconds)<br />
7.3.7.3 Millenium Controller Factory Settings<br />
Parameter Max Min Default/Fixed Type Remarks<br />
Backup entry delay from pressure fault NA NA 20 Seconds Fixed (No delay from Panel Switches)<br />
Backup Exit Delay Time NA NA 10 Minutes Fixed (No delay from Panel Switches)<br />
Suction Set point 5 2 3.5 Bar Adjustable<br />
Suction Dead Band 2 0.3 1 Bar Adjustable<br />
Suction Override Set Point NA NA SP +3.5 Bar Default Setting 7 Bar<br />
Wet Tech Set Point 100 10 44 Factor Adjustable<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
7
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
Issue 3 Page - 66 -<br />
September 2007<br />
7.4 <strong>MSP</strong>-<strong>INV</strong> <strong>Inverter</strong> Settings<br />
Please note : All parameters are identical for all unit sizes EXCEPT parameters 102 & 105, which are<br />
model dependent. Parameters shown in Grey are Default Settings.<br />
AKD type code: AKD5011 (<strong>MSP</strong>050 & 060), AKD5016 (<strong>MSP</strong>080 & 100) AK FC bus address: 2<br />
Application: Lead compressor control on <strong>Searle</strong> CCU-ECI units<br />
Parameter<br />
number<br />
Parameter description<br />
Operation and display Factory setting Setup 1 Factory Set up Setting<br />
001 Language English<br />
002 Local/remote control Remote control<br />
003 Local reference 30.0<br />
004 Active setup Setup 1 Multi Setup<br />
005 Programming setup Active setup<br />
006 Copying of setups No copying Copy from 1 to 2<br />
007 LCP copy No copying<br />
008 Display scaling of motor frequency 1<br />
009 Display line 2 Frequency [Hz]<br />
010 Display line 1.1 Reference [%]<br />
011 Display line 1.2 Motor current [A]<br />
012 Display line 1.3 Power [kW]<br />
013 Local control/configuration LCP digital control/as par 100<br />
014 Local stop Possible Disabled (After Setup)<br />
017 Local reset of trip Possible Enable<br />
018 Lock for data change Not locked Lock (After Setup)<br />
019 Power up Action Auto Restart Auto Restart<br />
Load and motor Factory setting Setup 1 Factory Set up Setting<br />
100 Configuration Speed control, open loop Speed Open Loop Open Loop 0<br />
101 Torque characteristics High - constant torque H-Constant Torque High C/T<br />
CCU050= 5.4kW<br />
1<br />
102 Motor power Depends on the unit Nameplate kW<br />
CCU060= 6.4kW<br />
CCU080= 8.0kW<br />
CCU100= 9.0kW<br />
103 Motor voltage Depends on the unit 400V Nameplate 415Volts<br />
104 Motor frequency 50 Hz / 60 Hz 50Hz Nameplate 50Hz<br />
CCU050=9.2A<br />
105 Motor current Depends on the unit Amps Nameplate<br />
CCU060=10.7A<br />
CCU080=13.5A<br />
CCU100=15.9A<br />
106 Rated motor speed Depends on the unit RPM Nameplate<br />
Run Adaptation<br />
1440rpm<br />
107 Automatic motor adaptation, AMA Adaptation off<br />
during commissioning<br />
108 Stator resistor Depends on the unit<br />
109 Stator reactance Depends on the unit<br />
113 Load compensation, low speed 100%<br />
114 Load compensation, high speed 100%<br />
115 Slip compensation 0%<br />
116 Slip compensation, time constant 0.5 sec<br />
117 Resonance Damp 100%<br />
118 Damp time constant<br />
120 Start Delay 0<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
121 Coast/Delay time start function<br />
122 Function at stop Coasting<br />
123 Min F Func Stop 0.00Hz<br />
124 DC holding current 0%<br />
125 DC braking current 50 %<br />
126 DC braking time 10.0 sec.<br />
127 DC brake cut-in frequency Off<br />
128 Motor thermal protection No protection No protection<br />
130 Start Frequency 0%<br />
131 Initial Voltage 0V<br />
Issue 3 Page - 67 -<br />
September 2007<br />
References and limits Factory setting Setup 1 Factory Set up Setting<br />
201 Output frequency low limit 30.0 Hz 30 Hz 20Hz<br />
202 Output frequency high limit 60.0 Hz 60 Hz 60Hz<br />
204 Minimum reference 30.0 Hz 0.000Hz 20Hz<br />
205 Maximum reference 60.0 Hz 60 Hz 60Hz<br />
207 Ramp-up time 1 0.7 sec. 5 sec 3sec<br />
208 Ramp-down time 1 1.0 sec. 5 sec 1sec<br />
209 Ramp-up time 2 5s<br />
210 Ramp-down time 2 1s<br />
211 Jog Ramp time 1s<br />
213 Jog Frequency 0.1Hz<br />
214 Reference function Sum External/Preset<br />
215 Preset reference 1 0.00 % 66% (Typical)<br />
216 Preset reference 2 0.00 %<br />
217 Preset reference 3 0.00 %<br />
218 Preset reference 4 0.00 %<br />
221 Torq. Limit motor 160% 110-180% 152<br />
223 Warning: Low Current 0.0 A 5.0A<br />
224 Warning: High current I,AKD,MAX (Maximum AKD "Amp")<br />
225 Warning: Low frequency 0 Hz 0 Hz<br />
226 Warning: High frequency 132 Hz 92<br />
227 Warning: Low feedback -4000.000<br />
228 Warning: High feedback 4000.000<br />
229 Frequency bypass, bandwidth OFF<br />
230 Frequency bypass 1 0.0 Hz<br />
231 Frequency bypass 2 0.0 Hz<br />
232 Frequency bypass 3 0.0 Hz<br />
233 Frequency bypass 4 0.0 Hz<br />
234 Motor Phase Monitor Enable<br />
Inputs and outputs Factory setting Setup 1 Factory Set up Setting<br />
300 Terminal 16, input No function [0] Reset<br />
301 Terminal 17, input No function [0]<br />
302 Terminal 18, start, input Start Start<br />
303 Terminal 19, input No Function<br />
304 Terminal 27, input Quick stop inverse [0] Coast Inverse<br />
305 Terminal 29, input No Function<br />
306 Terminal 32, input No function [0] Preset Reference On<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
307 Terminal 33, input Reset<br />
Setup Select LSB<br />
Speed Down<br />
308 Terminal 53, analogue input voltage Reference Reference<br />
Issue 3 Page - 68 -<br />
September 2007<br />
309 Terminal 53, min. scaling 0.0 V 0.0 V 0 volt<br />
310 Terminal 53, max. scaling 10.0 V 10.0 V 10 volt<br />
311 Terminal 54, analogue input voltage Thermistor No Function<br />
312 Terminal 54, min. scaling 0.0 V<br />
313 Terminal 54, max. scaling 10.0 V<br />
314 Terminal 60, analogue input current Reference<br />
315 Terminal 60, min. scaling 0.0 mA<br />
316 Terminal 60, max. scaling 20.0 mA<br />
317 Live zero time out 10 sec.<br />
318 Function after time out Freeze output [1]<br />
319 Terminal 42, output No function [0] Above Frequency Low<br />
Out Current Range<br />
321 Terminal 45, output No function [0]<br />
(Digital)<br />
323 Relay 01, output Ready signal [2] Alarm/Warning<br />
324 Relay 1-3 on delay 0.0 sec 60.0 sec<br />
325 Relay 1-3 off delay 0.0 sec 1.0 sec<br />
326 Relay 04, output Unit Ready/REM CTRL Alarm/Warning<br />
Special functions Factory setting Setup 1 Factory Set up Setting<br />
405 Reset function Automatic x 3 [3] Automatic x 3 [3]<br />
406 Automatic restart function 5 min<br />
407 Mains Failure No Function<br />
408 N/A<br />
409 Trip delay torq. OFF 15-30 sec (or as required) 20<br />
411 Switch frequency Depends on unit Factory Default 3.0 kHz<br />
Output frequency dependent switching<br />
412 frequency Disable<br />
414 Minimum feedback 0.000<br />
415 Maximum feedback 1500.000<br />
416 Process unit Bar<br />
422 U 0 voltage at 0 Hz 20.0 V<br />
423 U 1 voltage parameter 103<br />
424 F 1 frequency parameter 104<br />
425 U 2 voltage parameter 103<br />
426 F 2 frequency parameter 104<br />
427 U 3 voltage parameter 103<br />
428 F 3 frequency parameter 104<br />
429 U 4 voltage parameter 103<br />
430 F 4 frequency parameter 104<br />
431 U 5 voltage parameter 103<br />
432 F5 frequency parameter 104<br />
437 Process PID Normal/inverse control Normal<br />
438 Process PID anti windup On<br />
439 Process PID start frequency 0.0 Hz<br />
440 Process PID proportional gain 0.01<br />
441 Process PID integral time OFF<br />
444 Process PID lowpass filter time 0.01<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
445 Flying start Enable<br />
446 Switch Pattern SFAVM<br />
Issue 3 Page - 69 -<br />
September 2007<br />
Serial communications Factory setting Setup 1 Factory Set up Setting<br />
500 Address 1 2 2<br />
507 Selection of setup Logic or<br />
513 Bus time interval 1sec.<br />
514 Bus time interval function Off<br />
515 Data read-out: Reference % Via Lon or par 009-012<br />
516 Data read-out: Reference unit Via Lon or par 009-012<br />
517 Data read-out: Feedback Via Lon or par 009-012<br />
518 Data read-out: Frequency Via Lon or par 009-012<br />
520 Data read-out: Current Via Lon or par 009-012<br />
522 Data read-out: Power, kW Via Lon or par 009-012<br />
523 Data read-out: Power, HP Via Lon or par 009-012<br />
524 Data read-out: Motor voltage Via Lon or par 009-012<br />
525 Data read-out: DC link voltage Via Lon or par 009-012<br />
526 Data read-out: Motor temp. Via Lon or par 009-012<br />
527 Data read-out: AKD temp. Via Lon or par 009-012<br />
528 Data read-out: Digital input Via Lon or par 009-012<br />
Data read-out: Terminal 53, analogue<br />
529 input Via Lon or par 009-012<br />
Data read-out: Terminal 54, analogue<br />
530 input Via Lon or par 009-012<br />
Data read-out: Terminal 60, analogue<br />
531 input Via Lon or par 009-012<br />
533 Data read-out: External reference % Via Lon or par 009-012<br />
534 Data read-out: Status word, binary Par 009-012<br />
537 Data read-out: Heat sink temperature Via Lon or par 009-012<br />
538 Data read-out: Alarm word, binary Par 009-012<br />
539 Data read-out: AKD control word, binary Par 009-012<br />
540 Data read-out: Warning word, 1 Par 009-012<br />
541 Data read-out: Extended status word Par 009-012<br />
557 Data read-out: Motor RPM Via Lon or par 009-012<br />
558 Data read-out: Motor RPM x scaling Via Lon or par 009-012<br />
Technical functions Factory setting Setup 1 Factory Set up Setting<br />
600 Operating data: Operating hours<br />
601 Operating data: Hours run<br />
602 Operating data: kWh counter<br />
603 Operating data: Number of power-up’s<br />
Operating data: Number of over<br />
604 temperatures<br />
605 Operating data: Number of over voltages<br />
606 Data log: Digital input<br />
607 Data log: Bus commands<br />
608 Data log: Bus status word<br />
609 Data log: Reference<br />
610 Data log: Feedback<br />
611 Data log: Motor frequency<br />
612 Data log: Motor voltage<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 7. Controls Logic<br />
613 Data log: Motor current<br />
614 Data log: DC link voltage<br />
615 Fault log: Error code<br />
616 Fault log: Time<br />
617 Fault log: Value<br />
618 Reset of kWh counter No reset<br />
619 Reset of hours-run counter No reset<br />
620 Operating mode Normal function Normal function<br />
621 Nameplate: AKD type<br />
622 Nameplate: Power section<br />
623 Nameplate: AKD ordering number<br />
624 Nameplate: Software version no.<br />
625 Nameplate: LCP identification no.<br />
626 Nameplate: Database identification no.<br />
Nameplate: Power section identification<br />
627 no.<br />
628 Nameplate: Application option type<br />
Nameplate: Application option ordering<br />
629 no.<br />
630 Nameplate: Communication option type<br />
Nameplate: Communication option<br />
631 ordering no.<br />
Issue 3 Page - 70 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
Issue 3 Page - 71 -<br />
September 2007<br />
8. Layout Diagrams INDEX<br />
Page No’s Issue No<br />
8.1 Pipework Schematics<br />
8.1.1 <strong>MSP</strong>050-<strong>INV</strong> Pipework Schematic 72 1<br />
8.1.2 <strong>MSP</strong>060-<strong>INV</strong> Pipework Schematic 73 1<br />
8.1.3 <strong>MSP</strong>080-<strong>INV</strong> Pipework Schematic 74 1<br />
8.1.4 <strong>MSP</strong>100-<strong>INV</strong> Pipework Schematic 75 1<br />
8.2 Unit Dimensions 1<br />
8.2.1 <strong>MSP</strong>050 & 060-<strong>INV</strong> Dimensions 76 1<br />
8.2.2 <strong>MSP</strong>080 & 100-<strong>INV</strong> Dimensions 77 1<br />
8.2.3 <strong>MSP</strong>L-<strong>INV</strong> Dimensions 78 1<br />
8.2.4 MSHP Housing Dimensions 79 1<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
8
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.1.1 <strong>MSP</strong>050-<strong>INV</strong> Pipework Schematic<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
IF IN DOUBT ASK<br />
A2 DO NOT SCALE<br />
THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
DUAL PRV<br />
(24.8 BAR)<br />
INDICATOR<br />
GAUGES<br />
CHARGING<br />
Vv<br />
TEV<br />
ORIFICE 3<br />
ROTALOCK<br />
VALVE<br />
ROTALOCK<br />
VALVE<br />
RECEIVER<br />
ASSY.<br />
FILTER DRIER &<br />
SIGHTGLASS<br />
ASSY.<br />
CCU-JG5 EVAPORATOR<br />
: IMPORTANT :<br />
THIS DRAWING SHOWS THE POSITION<br />
OF THE COMPONENTS WITHIN THE<br />
REFRIGERATION SYSTEM. IT DOES NOT SHOW<br />
THE PHYSICAL POSITION OF COMPONENTS IN<br />
THE UNIT OR THEIR PRECISE APPEARANCE<br />
RUPTURE<br />
DISCS<br />
CHANGEOVER<br />
VALVE<br />
KMC MOISTURE<br />
SENSOR (WETECH)<br />
LIQUID<br />
FILTER<br />
DRIER<br />
LIQ LEVEL<br />
SIGHT GLASSES<br />
& ALARM<br />
LIQUID<br />
RECEIVER<br />
INDICATOR<br />
GAUGE PRV<br />
(24.8 BAR)<br />
S1<br />
TEV<br />
BULB<br />
EVAP<br />
SOLENOID<br />
DRAIN LINE<br />
RUPTURE<br />
DISC<br />
1 3/8"<br />
B.V.<br />
EQ. LINE<br />
REMOTE CONDENSER<br />
1 3/8"<br />
B.V.<br />
SCHR<br />
SCI<br />
SCO<br />
LIQUID BYPASS<br />
ARRANGEMENT<br />
1 3/8"<br />
B.V.<br />
HOUSING<br />
COOLING<br />
(MSHP ONLY)<br />
HGI1<br />
LO 1<br />
SIGHT<br />
GLASS<br />
VIB<br />
ELIM<br />
LIQUID STUB<br />
1 3/8" ODS<br />
SCHR<br />
SCHR<br />
HP / LP<br />
SAFETY<br />
COMPRESSOR<br />
<strong>INV</strong>ERTER<br />
ASSY<br />
3/8"<br />
B.V.<br />
1 5/8"<br />
BALL Vv.<br />
<strong>INV</strong>ERTER<br />
DISCHARGE HEADER<br />
MAIN HP<br />
TRANSDUCER<br />
BACKUP HP<br />
TRANSDUCER<br />
Issue 3 Page - 72 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1 5/8"<br />
N.R.V.<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
1/2"<br />
B.V.<br />
HP LP<br />
HP LP<br />
ROTALOK<br />
Vv<br />
HP LP<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
COALESCENT<br />
OIL SEPARATOR<br />
RESERVOIR<br />
CCH<br />
COMP 1<br />
4FC3.2Y (DOL)<br />
3/8"<br />
HOSE<br />
CCH<br />
3/8"<br />
HOSE<br />
CCH<br />
OIL<br />
SOV<br />
HOSE COMP 2<br />
4EC4.2Y (DOL)<br />
OIL<br />
SOV<br />
HOSE COMP 3<br />
4PCS10.2Y (PWS)<br />
3/8"<br />
HOSE<br />
OIL<br />
SOV<br />
OIL RETURN<br />
S.O.V.<br />
SCHR<br />
LIQUID STUB<br />
1 3/8" ODS<br />
MAIN LP<br />
TRANSDUCER<br />
BACKUP LP<br />
TRANSDUCER<br />
DUAL PRV<br />
(14 BAR)<br />
20mm CLASS 'O'<br />
INSULATION<br />
SUCTION HEADER<br />
SUCTION<br />
STRAINER<br />
2 5/8"<br />
B.V.<br />
CHANGE OVER<br />
VALVE<br />
3/8" MALE<br />
FLR PORT<br />
VIB<br />
ELIM<br />
SUCTION STUB<br />
2 5/8" ODS<br />
MATERIAL FINISH<br />
TOLERANCES ASSEMBLY UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
01<br />
DATE SCALE PART<br />
PART No. ISS<br />
23/05/03 1:1 CCU050-ECI PIPEWORK SCHEMATIC<br />
DRAWN CHECKED FOR<br />
JOB No. DRG. FILE REF<br />
NS NS <strong>MSP</strong> N/A <strong>MSP</strong>-050-800-<strong>INV</strong>.01<br />
ISS MODIFICATION SCN DATE<br />
8
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.1.2 <strong>MSP</strong>060-<strong>INV</strong> Pipework Schematic<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
IF IN DOUBT ASK<br />
A2 DO NOT SCALE<br />
THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
DUAL PRV<br />
(24.8 BAR)<br />
INDICATOR<br />
GAUGES<br />
CHARGING<br />
Vv<br />
TEV<br />
ORIFICE 3<br />
ROTALOCK<br />
VALVE<br />
ROTALOCK<br />
VALVE<br />
RECEIVER<br />
ASSY.<br />
FILTER DRIER &<br />
SIGHTGLASS<br />
ASSY.<br />
CCU-JG5 EVAPORATOR<br />
: IMPORTANT :<br />
THIS DRAWING SHOWS THE POSITION<br />
OF THE COMPONENTS WITHIN THE<br />
REFRIGERATION SYSTEM. IT DOES NOT SHOW<br />
THE PHYSICAL POSITION OF COMPONENTS IN<br />
THE UNIT OR THEIR PRECISE APPEARANCE<br />
RUPTURE<br />
DISCS<br />
CHANGEOVER<br />
VALVE<br />
KMC MOISTURE<br />
SENSOR (WETECH)<br />
LIQUID<br />
FILTER<br />
DRIER<br />
LIQ LEVEL<br />
SIGHT GLASSES<br />
& ALARM<br />
LIQUID<br />
RECEIVER<br />
INDICATOR<br />
GAUGE PRV<br />
(24.8 BAR)<br />
S1<br />
TEV<br />
BULB<br />
EVAP<br />
SOLENOID<br />
DRAIN LINE<br />
RUPTURE<br />
DISC<br />
1 3/8"<br />
B.V.<br />
EQ. LINE<br />
REMOTE CONDENSER<br />
1 3/8"<br />
B.V.<br />
SCHR<br />
SCI<br />
SCO<br />
LIQUID BYPASS<br />
ARRANGEMENT<br />
1 3/8"<br />
B.V.<br />
HOUSING<br />
COOLING<br />
(MSHP ONLY)<br />
HGI1<br />
LO 1<br />
SIGHT<br />
GLASS<br />
VIB<br />
ELIM<br />
LIQUID STUB<br />
1 3/8" ODS<br />
SCHR<br />
SCHR<br />
HP / LP<br />
SAFETY<br />
COMPRESSOR<br />
<strong>INV</strong>ERTER<br />
ASSY<br />
3/8"<br />
B.V.<br />
1 5/8"<br />
BALL Vv.<br />
<strong>INV</strong>ERTER<br />
DISCHARGE HEADER<br />
MAIN HP<br />
TRANSDUCER<br />
BACKUP HP<br />
TRANSDUCER<br />
Issue 3 Page - 73 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1 5/8"<br />
N.R.V.<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
1/2"<br />
B.V.<br />
HP LP<br />
HP LP<br />
ROTALOK<br />
Vv<br />
HP LP<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
COALESCENT<br />
OIL SEPARATOR<br />
RESERVOIR<br />
CCH<br />
COMP 1<br />
4EC-4.2Y (DOL)<br />
3/8"<br />
HOSE<br />
CCH<br />
3/8"<br />
HOSE<br />
CCH<br />
OIL<br />
SOV<br />
HOSE COMP 2<br />
4DC-5.2Y (DOL)<br />
OIL<br />
SOV<br />
HOSE COMP 3<br />
4NCS-12.2Y (PWS)<br />
3/8"<br />
HOSE<br />
OIL<br />
SOV<br />
OIL RETURN<br />
S.O.V.<br />
SCHR<br />
LIQUID STUB<br />
1 3/8" ODS<br />
MAIN LP<br />
TRANSDUCER<br />
BACKUP LP<br />
TRANSDUCER<br />
DUAL PRV<br />
(14 BAR)<br />
20mm CLASS 'O'<br />
INSULATION<br />
SUCTION HEADER<br />
SUCTION<br />
STRAINER<br />
2 5/8"<br />
B.V.<br />
CHANGE OVER<br />
VALVE<br />
3/8" MALE<br />
FLR PORT<br />
VIB<br />
ELIM<br />
SUCTION STUB<br />
2 5/8" ODS<br />
MATERIAL FINISH<br />
TOLERANCES ASSEMBLY UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
01<br />
DATE SCALE PART<br />
PART No. ISS<br />
23/05/03 1:1 <strong>MSP</strong>060-<strong>INV</strong> PIPEWORK SCHEMATIC<br />
DRAWN CHECKED FOR<br />
JOB No. DRG. FILE REF<br />
NS NS <strong>MSP</strong> N/A <strong>MSP</strong>-060-800-<strong>INV</strong>.01<br />
16/03/06<br />
N/A<br />
ISS MODIFICATION SCN DATE<br />
8
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.1.3 <strong>MSP</strong>080-RDM Pipework Schematic<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
IF IN DOUBT ASK<br />
A2 DO NOT SCALE<br />
THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
DUAL PRV<br />
(24.8 BAR)<br />
INDICATOR<br />
GAUGES<br />
CHARGING<br />
Vv<br />
TEV<br />
ORIFICE 3<br />
ROTALOCK<br />
VALVE<br />
ROTALOCK<br />
VALVE<br />
RECEIVER<br />
ASSY.<br />
FILTER DRIER &<br />
SIGHTGLASS<br />
ASSY.<br />
CCU-JG5 EVAPORATOR<br />
: IMPORTANT :<br />
THIS DRAWING SHOWS THE POSITION<br />
OF THE COMPONENTS WITHIN THE<br />
REFRIGERATION SYSTEM. IT DOES NOT SHOW<br />
THE PHYSICAL POSITION OF COMPONENTS IN<br />
THE UNIT OR THEIR PRECISE APPEARANCE<br />
RUPTURE<br />
DISCS<br />
CHANGEOVER<br />
VALVE<br />
KMC MOISTURE<br />
SENSOR (WETECH)<br />
LIQUID<br />
FILTER<br />
DRIER<br />
LIQ LEVEL<br />
SIGHT GLASSES<br />
& ALARM<br />
LIQUID<br />
RECEIVER<br />
INDICATOR<br />
GAUGE PRV<br />
(24.8 BAR)<br />
S1<br />
TEV<br />
BULB<br />
EVAP<br />
SOLENOID<br />
DRAIN LINE<br />
RUPTURE<br />
DISC<br />
1 3/8"<br />
B.V.<br />
EQ. LINE<br />
REMOTE CONDENSER<br />
1 3/8"<br />
B.V.<br />
SCHR<br />
SCI<br />
SCO<br />
LIQUID BYPASS<br />
ARRANGEMENT<br />
1 3/8"<br />
B.V.<br />
HOUSING<br />
COOLING<br />
(MSHP ONLY)<br />
HGI1<br />
LO 1<br />
SIGHT<br />
GLASS<br />
VIB<br />
ELIM<br />
LIQUID STUB<br />
1 3/8" ODS<br />
SCHR<br />
SCHR<br />
HP / LP<br />
SAFETY<br />
<strong>INV</strong>ERTER<br />
COMPRESSOR<br />
<strong>INV</strong>ERTER<br />
ASSY<br />
3/8"<br />
B.V.<br />
1 5/8"<br />
BALL Vv.<br />
DISCHARGE HEADER<br />
MAIN HP<br />
TRANSDUCER<br />
BACKUP HP<br />
TRANSDUCER<br />
Issue 3 Page - 74 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1 5/8"<br />
N.R.V.<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
1/2"<br />
B.V.<br />
HP LP<br />
HP LP<br />
ROTALOK<br />
Vv<br />
OFFLOADER<br />
HEAD<br />
HP LP<br />
OIL PUMP<br />
SENSOR<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
COALESCENT<br />
OIL SEPARATOR<br />
RESERVOIR<br />
CCH<br />
COMP 1<br />
4DC5.2Y (DOL)<br />
3/8"<br />
HOSE<br />
CCH<br />
3/8"<br />
HOSE<br />
CCH<br />
OIL<br />
SOV<br />
HOSE COMP 2<br />
4PCS10.2Y (PWS)<br />
OIL<br />
SOV<br />
HOSE COMP 3<br />
4J-13.2Y (PWS)<br />
3/8"<br />
HOSE<br />
OIL<br />
SOV<br />
OIL RETURN<br />
S.O.V.<br />
SCHR<br />
LIQUID STUB<br />
1 3/8" ODS<br />
MAIN LP<br />
TRANSDUCER<br />
BACKUP LP<br />
TRANSDUCER<br />
DUAL PRV<br />
(14 BAR)<br />
20mm CLASS 'O'<br />
INSULATION<br />
SUCTION HEADER<br />
SUCTION<br />
STRAINER<br />
2 5/8"<br />
B.V.<br />
CHANGE OVER<br />
VALVE<br />
3/8" MALE<br />
FLR PORT<br />
VIB<br />
ELIM<br />
SUCTION STUB<br />
2 5/8" ODS<br />
MATERIAL FINISH<br />
TOLERANCES ASSEMBLY UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
01<br />
DATE SCALE PART<br />
PART No. ISS<br />
23/05/03 1:1 <strong>MSP</strong>080-<strong>INV</strong> PIPEWORK SCHEMATIC<br />
DRAWN CHECKED FOR<br />
JOB No. DRG. FILE REF<br />
NS NS MSU N/A <strong>MSP</strong>-080-800-<strong>INV</strong>.01<br />
16/03/06<br />
N/A<br />
ISS MODIFICATION SCN DATE<br />
8
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.1.4 <strong>MSP</strong>100-RDM Pipework Schematic<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
IF IN DOUBT ASK<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
ROTALOCK<br />
VALVE<br />
DUAL PRV<br />
(24.8 BAR)<br />
INDICATOR<br />
GAUGES<br />
ROTALOCK<br />
VALVE<br />
RUPTURE<br />
DISCS<br />
CHANGEOVER<br />
VALVE<br />
A2 DO NOT SCALE<br />
THIRD ANGLE PROJECTION<br />
TEV<br />
FILTER DRIER &<br />
RECEIVER<br />
ORIFICE 3<br />
CHARGING<br />
SIGHTGLASS<br />
Vv<br />
CCU-JG5 EVAPORATOR<br />
ASSY.<br />
ASSY.<br />
LIQUID<br />
KMC MOISTURE<br />
FILTER<br />
SENSOR (WETECH)<br />
DRIER<br />
: IMPORTANT :<br />
THIS DRAWING SHOWS THE POSITION<br />
OF THE COMPONENTS WITHIN THE<br />
REFRIGERATION SYSTEM. IT DOES NOT SHOW<br />
THE PHYSICAL POSITION OF COMPONENTS IN<br />
THE UNIT OR THEIR PRECISE APPEARANCE<br />
LIQ LEVEL<br />
SIGHT GLASSES<br />
& ALARM<br />
LIQUID<br />
RECEIVER<br />
INDICATOR<br />
GAUGE PRV<br />
(24.8 BAR)<br />
S1<br />
TEV<br />
BULB<br />
EVAP<br />
SOLENOID<br />
DRAIN LINE<br />
RUPTURE<br />
DISC<br />
1 3/8"<br />
B.V.<br />
EQ. LINE<br />
REMOTE CONDENSER<br />
1 3/8"<br />
B.V.<br />
SCHR<br />
SCI<br />
SCO<br />
LIQUID BYPASS<br />
ARRANGEMENT<br />
1 3/8"<br />
B.V.<br />
HOUSING<br />
COOLING<br />
(MSHP ONLY)<br />
HGI1<br />
LO 1<br />
SIGHT<br />
GLASS<br />
VIB<br />
ELIM<br />
LIQUID STUB<br />
1 3/8" ODS<br />
SCHR<br />
SCHR<br />
HP / LP<br />
SAFETY<br />
<strong>INV</strong>ERTER<br />
COMPRESSOR<br />
<strong>INV</strong>ERTER<br />
ASSY<br />
3/8"<br />
B.V.<br />
1 5/8"<br />
BALL Vv.<br />
DISCHARGE HEADER<br />
MAIN HP<br />
TRANSDUCER<br />
BACKUP HP<br />
TRANSDUCER<br />
Issue 3 Page - 75 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1 5/8"<br />
N.R.V.<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
1/2"<br />
B.V.<br />
HP LP<br />
HP LP<br />
ROTALOK<br />
Vv<br />
OFFLOADER<br />
HEAD<br />
HP LP<br />
OIL PUMP<br />
SENSOR<br />
OIL PUMP<br />
SENSOR<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
ROTALOK<br />
Vv<br />
COALESCENT<br />
OIL SEPARATOR<br />
RESERVOIR<br />
CCH<br />
COMP 1<br />
4CC-6.2Y (DOL)<br />
3/8"<br />
HOSE<br />
CCH<br />
3/8"<br />
HOSE<br />
CCH<br />
OIL<br />
SOV<br />
HOSE COMP 2<br />
4J-13.2Y (PWS)<br />
OIL<br />
SOV<br />
HOSE COMP 3<br />
4G-20.2Y (PWS)<br />
3/8"<br />
HOSE<br />
OIL<br />
SOV<br />
OIL RETURN<br />
S.O.V.<br />
SCHR<br />
LIQUID STUB<br />
1 3/8" ODS<br />
MAIN LP<br />
TRANSDUCER<br />
BACKUP LP<br />
TRANSDUCER<br />
DUAL PRV<br />
(14 BAR)<br />
20mm CLASS 'O'<br />
INSULATION<br />
SUCTION HEADER<br />
SUCTION<br />
STRAINER<br />
2 5/8"<br />
B.V.<br />
CHANGE OVER<br />
VALVE<br />
3/8" MALE<br />
FLR PORT<br />
VIB<br />
ELIM<br />
SUCTION STUB<br />
2 5/8" ODS<br />
MATERIAL FINISH<br />
TOLERANCES ASSEMBLY UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
01<br />
DATE SCALE PART<br />
PART No. ISS<br />
23/05/03 1:1 <strong>MSP</strong>100-<strong>INV</strong> PIPEWORK SCHEMATIC<br />
DRAWN CHECKED FOR<br />
JOB No. DRG. FILE REF<br />
NS NS <strong>MSP</strong> N/A <strong>MSP</strong>-100-800-<strong>INV</strong>.01<br />
16/03/06<br />
N/A<br />
ISS MODIFICATION SCN DATE<br />
8
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.2.1 <strong>MSP</strong>050-<strong>INV</strong> Dimensions<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
86<br />
62 62<br />
243<br />
180<br />
475 MNTG CTRS<br />
POSITION OF M10 MOUNTING<br />
BOLT, TO COMPRESSOR PACK<br />
BASE FRAME.<br />
145<br />
DETAIL OF ISOLATOR FIXINGS<br />
TYPICAL 4 POSITIONS.<br />
SCALE ~ .1:5 1910 MNTG CTRS<br />
M8 CLEARANCE HOLE FOR<br />
FIXING OF ISOLATOR<br />
296<br />
1691 UNIT HEIGHT<br />
Issue 3 Page - 76 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1.5/8" DISCHARGE<br />
CONNECTION<br />
835<br />
244<br />
30<br />
825<br />
2.5/8" SUCTION<br />
CONNECTION<br />
2488<br />
863 UNIT WIDTH<br />
2689 OVERALL LENGTH<br />
FINISH<br />
MATERIAL<br />
TOLERANCES ASSEMBLY UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>050-<strong>INV</strong><br />
PART<br />
01<br />
COMPRESSOR PACK: <strong>MSP</strong>050-<strong>INV</strong><br />
1:20<br />
DATE SCALE<br />
26/06/06<br />
<strong>MSP</strong>050-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
CDS<br />
CDS<br />
ISS MODIFICATION SCN DATE<br />
8
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.2.2 <strong>MSP</strong>060-<strong>INV</strong> Dimensions<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
62 62<br />
86<br />
145 475 MNTG CTRS 243<br />
180<br />
POSITION OF M10 MOUNTING<br />
BOLT, TO COMPRESSOR PACK<br />
BASE FRAME.<br />
DETAIL OF ISOLATOR FIXINGS<br />
TYPICAL 4 POSITIONS.<br />
SCALE ~ .1:5<br />
M8 CLEARANCE HOLE FOR<br />
FIXING OF ISOLATOR<br />
1910 MNTG CTRS 296<br />
Issue 3 Page - 77 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1.5/8" DISCHARGE<br />
CONNECTION<br />
835<br />
244<br />
30 1695 UNIT HEIGHT<br />
825<br />
2.5/8" SUCTION<br />
CONNECTION<br />
863 UNIT WIDTH<br />
2488<br />
2689 OVERALL LENGTH<br />
FINISH<br />
MATERIAL<br />
TOLERANCES ASSEMBLY<br />
UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>060-<strong>INV</strong><br />
PART<br />
01<br />
COMPRESSOR PACK: <strong>MSP</strong>060-<strong>INV</strong><br />
1:20<br />
DATE SCALE<br />
26/06/06<br />
<strong>MSP</strong>060-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
CDS<br />
CDS<br />
ISS MODIFICATION SCN DATE
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.2.3 <strong>MSP</strong>080-<strong>INV</strong> Dimensions<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
62 62<br />
86<br />
145 475 MNTG CTRS 243<br />
180<br />
POSITION OF M10 MOUNTING<br />
BOLT, TO COMPRESSOR PACK<br />
BASE FRAME.<br />
DETAIL OF ISOLATOR FIXINGS<br />
TYPICAL 4 POSITIONS.<br />
SCALE ~ .1:5<br />
M8 CLEARANCE HOLE FOR<br />
FIXING OF ISOLATOR<br />
1910 MNTG CTRS 296<br />
Issue 3 Page - 78 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1.5/8" DISCHARGE<br />
CONNECTION<br />
837<br />
239<br />
30 1781 UNIT HEIGHT<br />
825<br />
2.5/8" SUCTION<br />
CONNECTION<br />
2488<br />
863 UNIT WIDTH<br />
2689 OVERALL LENGTH<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
ASSEMBLY<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>080-<strong>INV</strong><br />
01<br />
COMPRESSOR PACK: <strong>MSP</strong>080-<strong>INV</strong><br />
<strong>MSP</strong>080-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
26/06/06 1:20<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
CDS<br />
CDS<br />
ISS MODIFICATION SCN DATE
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.2.4 <strong>MSP</strong>100-<strong>INV</strong> Dimensions<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
62 62<br />
86<br />
145 475 MNTG CTRS 243<br />
180<br />
POSITION OF M10 MOUNTING<br />
BOLT, TO COMPRESSOR PACK<br />
BASE FRAME.<br />
DETAIL OF ISOLATOR FIXINGS<br />
TYPICAL 4 POSITIONS.<br />
SCALE ~ .1:5<br />
M8 CLEARANCE HOLE FOR<br />
FIXING OF ISOLATOR<br />
1910 MNTG CTRS 296<br />
Issue 3 Page - 79 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
2.5/8" DISCHARGE<br />
CONNECTION<br />
838<br />
244<br />
30 1781 UNIT HEIGHT<br />
863 UNIT WIDTH<br />
825<br />
2.5/8" SUCTION<br />
CONNECTION<br />
2689 OVERALL LENGTH<br />
2488<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
ASSEMBLY<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
PART No. ISS<br />
<strong>MSP</strong>100-<strong>INV</strong><br />
01<br />
COMPRESSOR PACK: <strong>MSP</strong>100-<strong>INV</strong><br />
<strong>MSP</strong>100-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
26/06/06 1:20<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
CDS<br />
CDS<br />
ISS MODIFICATION SCN DATE
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.2.5 <strong>MSP</strong>L050-<strong>INV</strong> Dimensions<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
62 62<br />
98<br />
86<br />
POSITION OF M10 MOUNTING<br />
BOLT, TO COMPRESSOR PACK<br />
BASE FRAME.<br />
863 FRAMEWORK DEPTH<br />
DETAIL OF ISOLATOR FIXINGS<br />
TYPICAL 4 POSITIONS.<br />
SCALE ~ .1:5<br />
M8 CLEARANCE HOLE FOR<br />
FIXING OF ISOLATOR<br />
90<br />
90<br />
570 MNTG<br />
90 1320 MNTG PAD CTRS<br />
180 PAD CTRS 90<br />
1671 OVERALL HEIGHT<br />
DISCHARGE & SUCTION<br />
VIBRATION ELIMINATORS<br />
SHOWN IN POSITION<br />
FOR INFORMATION ONLY<br />
(SUPPLIED LOOSE)<br />
Issue 3 Page - 80 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
1.5/8" DISCHARGE<br />
CONNECTION<br />
804<br />
542<br />
2.5/8"<br />
SUCTION<br />
CONNECTION<br />
823 MNTG CTRS<br />
750 FRAMEWORK<br />
LENGTH (RH)<br />
923 OVERALL WIDTH<br />
SPACE REQUIRED<br />
FOR FITMENT OF<br />
VIBRATION ELIMINATORS<br />
400<br />
2250 OVERALL LENGTH<br />
1500 FRAMEWORK LENGTH (LH)<br />
FINISH<br />
MATERIAL<br />
TOLERANCES UNLESS OTHERWISE STATED<br />
ASSEMBLY<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
NATURAL<br />
PART No. ISS<br />
<strong>MSP</strong>L050-<strong>INV</strong><br />
01<br />
SPLIT COMPRESSOR PACK: <strong>MSP</strong>L050-<strong>INV</strong><br />
<strong>MSP</strong>L050-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
29/08/06 1:20<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
CDS<br />
CDS<br />
ISS MODIFICATION SCN DATE
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 8.Layout Diagrams<br />
8.2.6 MSHP-<strong>INV</strong> Housing Dimensions<br />
This document is protected by copyright, and the design it contains is protected by<br />
both copyright and design right, all such rights being owned by ICG (UK) Limited.<br />
This document may also contain information which is confidential to that Company.<br />
Neither this document nor the design or information which it contains may therefore<br />
be used, sold, licensed, transferred, copied, lent, disclosed to any third party<br />
or otherwise reproduced in whole or in part in any manner or form other than with<br />
the prior written consent of that Company.<br />
"<br />
DO NOT SCALE IF IN DOUBT ASK<br />
A3 THIRD ANGLE PROJECTION<br />
[20 ] ICG (UK) Limited. All Rights Reserved."<br />
C<br />
Issue 3 Page - 81 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
FINISH<br />
MATERIAL<br />
TOLERANCES ASSEMBLY UNLESS OTHERWISE STATED<br />
MANUFACTURING COMPANY<br />
NEWGATE LANE FAREHAM HANTS PO14 1AR<br />
RAL7036<br />
PART No. ISS<br />
01<br />
80KW M&S HOUSED PACK RDM & <strong>INV</strong>ERTER<br />
MSHP080-<strong>INV</strong>.01<br />
JOB No. DRG. FILE REF<br />
DATE SCALE PART<br />
06/12/05 1:30<br />
DRAWN CHECKED FOR<br />
N/A N/A<br />
GWS<br />
GWS<br />
ISS MODIFICATION SCN DATE<br />
8
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 9. Spares List<br />
Issue 3 Page - 82 -<br />
September 2007<br />
9. Spares List INDEX<br />
Page No’s Issue No<br />
9.1 Compressors & Accessories 83 1<br />
9.2 Compressor Controls 84 1<br />
9.3 Pressure Relief Components 85 1<br />
9.4 Electrical Components 85 1<br />
9.5 Replaceable Elements 86 1<br />
9.6 Fixtures & Fittings 86 1<br />
9.7 Pressure Switches & Pressure Controls 86 1<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
9
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 9. Spares List<br />
9.1 Compressors & Accessories<br />
<strong>MSP</strong>100-<strong>INV</strong><br />
<strong>MSP</strong>080- <strong>INV</strong><br />
<strong>MSP</strong>060- <strong>INV</strong><br />
<strong>MSP</strong>050- <strong>INV</strong><br />
Component<br />
<strong>Searle</strong> Pt No.<br />
Type<br />
<strong>Searle</strong> Pt No.<br />
Type<br />
<strong>Searle</strong> Pt No.<br />
Type<br />
<strong>Searle</strong> Pt No.<br />
Type<br />
Description<br />
200-200-078<br />
4CC-6.2Y<br />
200-200-077<br />
4DC-5.2Y<br />
200-200-076<br />
4EC-4.2Y<br />
200-200-075<br />
4FC-3.2Y<br />
Compressor 1<br />
200-200-088-<br />
ULDH<br />
4J-13.2Y<br />
200-200-096-<br />
ULDH<br />
4PCS-10.2Y<br />
200-200-077<br />
4DC-5.2Y<br />
200-200-076<br />
4EC-4.2Y<br />
Compressor 2<br />
200-200-087<br />
4G-20.2Y<br />
200-200-088<br />
4J-13.2Y<br />
200-200-095<br />
4NCS-12.2Y<br />
200-200-096<br />
4PCS-10.2Y<br />
Compressor 3<br />
200-604-013<br />
OM3-CBB<br />
AL805032<br />
200-604-013<br />
OM3-CBB<br />
AL805032<br />
200-604-013<br />
OM3-CBB<br />
AL805032<br />
200-604-013<br />
OM3-CBB<br />
AL805032<br />
Oil Float Comp 1<br />
200-604-014<br />
OM3-CUA<br />
AL805030<br />
200-604-014<br />
OM3-CUA<br />
AL805030<br />
200-604-013<br />
OM3-CBB<br />
AL805032<br />
200-604-013<br />
OM3-CBB<br />
AL805032<br />
Oil Float Comp 2<br />
Issue 3 Page - 83 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
200-604-014<br />
OM3-CUA<br />
AL805030<br />
200-604-014<br />
OM3-CUA<br />
AL805030<br />
200-604-014<br />
OM3-CUA<br />
AL805030<br />
200-604-014<br />
OM3-CUA<br />
AL805030<br />
Oil Float Comp 3<br />
55-000-201<br />
TRAXOIL<br />
Cable Brkt<br />
55-000-201<br />
TRAXOIL<br />
Cable Brkt<br />
55-000-201<br />
TRAXOIL<br />
Cable Brkt<br />
55-000-201<br />
TRAXOIL<br />
Cable Brkt<br />
Oil Float Cable<br />
Bracket<br />
200-604-015<br />
OM3-P30<br />
AL805151<br />
200-604-015<br />
OM3-P30<br />
AL805151<br />
200-604-015<br />
OM3-P30<br />
AL805151<br />
200-604-015<br />
OM3-P30<br />
AL805151<br />
Oil Float Power<br />
Cable<br />
200-604-016<br />
OM3-N30<br />
AL805141<br />
200-604-016<br />
OM3-N30<br />
AL805141<br />
200-604-016<br />
OM3-N30<br />
AL805141<br />
200-604-016<br />
OM3-N30<br />
AL805141<br />
Oil Float Relay<br />
Cable<br />
49-060-450<br />
90° to 0°<br />
,0.77m<br />
49-060-450<br />
90° to 0°<br />
,0.77m<br />
49-060-450<br />
90° to 0°<br />
,0.77m<br />
49-060-450<br />
90° to 0°<br />
,0.77m<br />
Oil Return Hose<br />
200-200-510<br />
1/4" Flare Vv.<br />
200-200-510<br />
1/4" Flare Vv.<br />
200-200-510<br />
1/4" Flare Vv.<br />
200-200-510<br />
1/4" Flare Vv.<br />
Oil Return Shut off<br />
Valve<br />
291-200-183<br />
1/8" NPT x<br />
1/4" Flr Sch<br />
291-200-183<br />
1/8" NPT x<br />
1/4" Flr Sch<br />
291-200-183<br />
1/8" NPT x<br />
1/4" Flr Sch<br />
291-200-183<br />
1/8" NPT x<br />
1/4" Flr Sch<br />
HP/LP to Comp<br />
Adapter Straight<br />
Schraeder<br />
9
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 9. Spares List<br />
9.2 Compressor Controls<br />
<strong>MSP</strong>100-<strong>INV</strong><br />
<strong>MSP</strong>080-<strong>INV</strong><br />
<strong>MSP</strong>060-<strong>INV</strong><br />
<strong>MSP</strong>050-<strong>INV</strong><br />
Compressor Controls<br />
<strong>Searle</strong> Pt No.<br />
<strong>Searle</strong> Pt No.<br />
<strong>Searle</strong> Pt No.<br />
<strong>Searle</strong> Pt No.<br />
Type<br />
216-112-302<br />
216-112-302<br />
216-112-302<br />
216-112-302<br />
ISOLATOR P3-63/V/SVB KLOCKNER<br />
Isolator (All Compressors)<br />
200-708-201<br />
200-708-201<br />
200-708-201<br />
200-708-201<br />
NEUTRAL POLE FITS P3-ALL (100A MAX)<br />
Isolator Neutral Auxiliary (All Comps)<br />
216-112-005<br />
216-112-005<br />
216-112-005<br />
216-112-005<br />
AUX.CONTACT FOR P1-32 ISOLATOR<br />
Isolator 4th Pole Auxiliary (All Comps)<br />
216-112-002<br />
216-112-002<br />
216-112-002<br />
216-112-002<br />
PROTECT COVER FOR P3-63 ISOLATOR<br />
Isolator Inlet Protect Cover (All Comps)<br />
MOTOR STARTER O'LOAD<br />
200-200-742<br />
200-200-741<br />
200-200-741<br />
200-200-741<br />
Comp 1 Overload/Manual Starter (1MS1)<br />
200-200-744<br />
200-200-744<br />
200-200-744<br />
200-200-744<br />
AUX CONTACT 1 NO/1 NC NHI11-PKZ0<br />
Comp 1 Overload/Manual Starter Auxiliary<br />
216-131-011<br />
216-131-011<br />
216-131-005<br />
216-131-005<br />
CONTACTOR DILM N/C AUX 24V COIL<br />
Comp 1 Contactor (1K1)<br />
216-131-021<br />
216-131-021<br />
216-131-021<br />
216-131-021<br />
AUX CONTACT 1N/O 1N/C DILA-XHI1<br />
Comp 1 Contactor Auxilary, NO/NC<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
2 POLE RLY 24VAC COIL DPDT<br />
Comp 1 - 1R1 & 1R2 - Relay<br />
200-200-755<br />
200-200-755<br />
200-200-755<br />
200-200-755<br />
RELAY BASE 2 PL 24V<br />
Comp 1 - 1R1 & 1R2 - Relay Base<br />
200-200-745<br />
200-200-745<br />
200-200-745<br />
200-200-745<br />
MCB 4A 1POLE C CURVE<br />
Comp 1 - MCB (1CB1)<br />
Issue 3 Page - 84 -<br />
September 2007<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
200-200-742<br />
200-200-742<br />
200-200-741<br />
200-200-741<br />
MOTOR STARTER O'LOAD<br />
Comp 2 Overload/Manual Starter (2MCB1)<br />
200-200-742<br />
200-200-742<br />
N/A<br />
N/A<br />
MOTOR STARTER O'LOAD<br />
Comp 2 Overload/Manual Starter (2MCB2)<br />
200-200-744<br />
200-200-744<br />
200-200-744<br />
200-200-744<br />
AUX CONTACT 1 NO/1 NC NHI11-PKZ0<br />
Comp 2 Overload/Manual Starter Auxiliary<br />
216-131-011<br />
216-131-011<br />
216-131-005<br />
216-131-005<br />
CONTACTOR DILM N/C AUX 24V COIL<br />
Comp 2 Contactors (2C1,2C2)<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
AUX CONTACT 1N/O 1N/C DILA-XHI1<br />
Comp 2 Contactor Auxilary, NO/NC<br />
200-200-755<br />
200-200-755<br />
200-200-755<br />
200-200-755<br />
2 POLE RLY 24VAC COIL DPDT<br />
Comp 2 - 2R1 & 2R2 - Relay<br />
200-200-745<br />
200-200-745<br />
200-200-745<br />
200-200-745<br />
RELAY BASE 2 PL 24V<br />
Comp 2 - 2R1 & 2R2 - Relay Base<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
MCB 4A 1POLE C CURVE<br />
Comp 2 - MCB (2CB1)<br />
200-200-742<br />
200-200-742<br />
200-200-741<br />
200-200-741<br />
MOTOR STARTER O'LOAD<br />
Comp 3 Overload/Manual Starter (3MCB1)<br />
200-200-742<br />
200-200-742<br />
200-200-741<br />
200-200-741<br />
MOTOR STARTER O'LOAD<br />
Comp 3 Overload/Manual Starter (3MCB2)<br />
200-200-744<br />
200-200-744<br />
200-200-744<br />
200-200-744<br />
AUX CONTACT 1 NO/1 NC NHI11-PKZ0<br />
Comp 3 Overload/Manual Starter Auxiliary<br />
216-131-011<br />
216-131-011<br />
216-131-011<br />
216-131-005<br />
CONTACTOR DILM N/C AUX 24V COIL<br />
Comp 3 Contactors (3C1,3C2)<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
AUX CONTACT 1N/O 1N/C DILA-XHI1<br />
Comp 3 Contactor Auxilary, NO/NC<br />
200-200-755<br />
200-200-755<br />
200-200-755<br />
200-200-755<br />
2 POLE RLY 24VAC COIL DPDT<br />
Comp 3 - 3R1 & 3R2 – Relay<br />
200-200-745<br />
200-200-745<br />
200-200-745<br />
200-200-745<br />
RELAY BASE 2 PL 24V<br />
Comp 3 - 3R1 & 3R2 - Relay Base<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
200-709-002<br />
MCB 4A 1POLE C CURVE<br />
9<br />
Comp 3 - MCB (3CB1)
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 9. Spares List<br />
9.3 Pressure Relief Components / Receiver / Filter Assembly<br />
Issue 3 Page - 85 -<br />
September 2007<br />
Pressure Relief Components Type <strong>Searle</strong> Pt No.<br />
High Side PRV (24.8 Bar) PRV 24.8 BARG 3/8 NPT 200-563-025<br />
High Side Burst Disc (24.8 Bar) RUPTURE DISC 24.8 BAR 1/2in NPT 200-564-025<br />
Low Side PRV (14 Bar) HENRY PRV 14BAR 1/2NPT IN 5/8FL 200-563-014<br />
Burst Disc Indicator Gauge Pressure Gauge 200-565-001<br />
Burst Disc Blanking Plug 1/8" NPT Blanking Plug 200-616-012<br />
3 way Changeover Valve 3 way Valve 1/2" FPT 200-562-001<br />
9.4 Electrical Components<br />
Electrical Components<br />
Main Controls Type <strong>Searle</strong> Pt No.<br />
RDM Main Controller RDM MERCURY CONTROL VARIPAC 200-800-483<br />
RDM Backup Controller RDM MERCURY STEP CONTROLLER PR331 200-800-451<br />
Millenium Monitor Controller MILLENIUM CONTROLLER SA20R 24V DC 200-800-457<br />
Temperature Probe PT1000 TEMPERATURE PROBE 200-800-216<br />
Electric box Door Latch 1/4 Turn Latch Assy 200-610-020<br />
Electric box Door Key 5mm Double Bit Key 200-610-021<br />
Transformer TRANSFORMER 200VA 230V TO 12/24VAC 200-200-753<br />
Millenium DC Power Supply MILLENIUM POWER SUPPLY 24V DC 200-800-460<br />
10 amp MCB MCB 10A 1POLE C CURVE 200-200-713<br />
6 amp MCB MCB 6A 1Pole C Curve 200-200-712<br />
4 amp MCB MCB 4A 1Pole C Curve 200-200-745<br />
Isolator ISOLATOR P1-32/V/SVB KLOCKNER 216-112-301<br />
Isolator Neutral Pole NEUTRAL SW FOR P1-32/V/SVB ISOLATOR 200-708-302<br />
Isolator Auxiliary Contact AUX.CONTACT FOR P1-32 ISOLATOR 216-112-005<br />
Suction Transducer TRANSDUCER 0-18 BAR 4-20ma PT4-18S 200-800-221<br />
Liquid Transducer TRANSDUCER 0-30 BAR 4-20ma PT4-30S 200-800-222<br />
Anti Surge Fuses 20mm 3.15A ANTI SURGE GLASS FUSE 216-210-625<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
9
<strong>MSP</strong>-<strong>INV</strong> Installation and Operating Manual 9. Spares List<br />
9.5 Replaceable Elements<br />
Issue 3 Page - 86 -<br />
September 2007<br />
Replacement Filter Elements Type <strong>Searle</strong> Pt No.<br />
Oil Separator Element F592613RFC Replacement Element 200-604-050<br />
Liquid Filter Drier Element (2 reqd) 48" Std Drier Core 200-452-076<br />
Suction Filter Element (2 reqd) 48" Felt Core 200-452-078<br />
Liquid Filter Burn-out Element (2 reqd) 48" Acid removal Core 200-452-101<br />
Suction Filter Burn-out Element (2 reqd) 48" Cleanup Core 200-452-103<br />
9.6 Fixtures & Fittings<br />
Fixtures & Fittings Type <strong>Searle</strong> Pt No.<br />
RCD 230V 3pin Socket 3 Pin RCD Socket Metalclad 200-750-122<br />
9.7 Pressure Switches & Pressure Controls<br />
Pressure Switches & Accessories Type <strong>Searle</strong> Pt No.<br />
Main HP/LP Safety Switch DUAL P S/W AUTO 1/4 FLR CON 200-200-816<br />
Compressor Oil Pump Sensor OIL DIFF SWITCH DIRECT MOUNT BITZER 200-200-098<br />
Compressor HP Switch P100-CP12D 1/4 HP SWITCH AUTO 200-404-032<br />
Compressor LP Switch P100AP LP SWITCH AUTO 0.7BAR CUTOUT 200-404-031<br />
Part Number 272-000-294 <strong>Searle</strong> Manufacturing Company Telephone +44 (0)1329 82334<br />
Issue September07-1 Newgate Lane Fareham Facsimile +44 (0)1329 821243<br />
Hampshire PO14 1AR UK Website http://www.searle.co.uk Email sales@searle.co.uk<br />
9