06.01.2013 Views

Alco Controls

Alco Controls

Alco Controls

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Application Hot Gas Bypass - Nominal Capacities (kW)<br />

7 4.9 5.8 EX4<br />

60 bubble point for all refrig.<br />

23<br />

54<br />

6<br />

38<br />

9<br />

45<br />

EX5<br />

EX6<br />

(64 dew point for R 407C) 9 35 6 EX7<br />

58 4 488 EX8<br />

6. 4.3 5.5 EX4<br />

50 bubble point for all refrig.<br />

20<br />

46<br />

4<br />

32<br />

8<br />

4<br />

EX5<br />

EX6<br />

(54 dew point for R 407C) 63 5 47 EX7<br />

495 348 447 EX8<br />

4.9 3.7 4.9 EX4<br />

40 bubble point for all refrig.<br />

6<br />

38<br />

2<br />

27<br />

6<br />

36<br />

EX5<br />

EX6<br />

(45 dew point for R 407C) 36 95 30 EX7<br />

4 4 289 394 EX8<br />

4.3 2.8 4 EX4<br />

30 bubble point for all refrig.<br />

4<br />

32<br />

9<br />

22<br />

3<br />

3<br />

EX5<br />

EX6<br />

(35 dew point for R 407C) 2 78 EX7<br />

340 236 336 EX8<br />

Typical Order Package<br />

) Valve EX4, EX5, EX6, EX7 or EX8<br />

Plug and cable assembly EX5-N60 Part No. 804 652 (not for EX8)<br />

2) Driver EXD-U00 Part No. 804 557 and<br />

Terminal Kit K09-U00 Part No. 804 559<br />

A2.5. /0706/E<br />

Valve Type Kv, m3 /h R 22 / R 407C R 134a R 404A / R 507<br />

EX4 0.2 4.9 3.4 4.6<br />

EX5 0.68 6 5<br />

EX6 .57 37 26 35<br />

EX7 5.58 3 92 26<br />

EX8 6.95 399 278 382<br />

The nominal capacity (Qn) is based on the following conditions:<br />

Refrigerant Evaporating temperature Condensing temperature Subcooling<br />

R 407C +4°C (dew point)<br />

+38°C bubble point /<br />

+43°C dew point<br />

K<br />

R 22, R 34a, R 404A, R 507 +4°C +38°C K<br />

For other operating conditions, an Excel based selection<br />

tool can be ordered from the ALCO sales offices or from the<br />

internet, or use the quick selection tables below.<br />

Biflow versions are not released for hot gas bypass<br />

applications.<br />

EX4 .. EX8 must be installed with motor downward in hot gas<br />

line applications. This insures the valve life expectancy.<br />

Install a check valve on main hot gas line just after branch<br />

to Control Valve.<br />

Condensing<br />

Extended Capacity kW<br />

Valve<br />

Temperature °C R 22 / R 407C R 134a R 404A / R 507 type<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!