06.01.2013 Views

Unmanned Aircraft Systems Roadmap 2005-2030 - Federation of ...

Unmanned Aircraft Systems Roadmap 2005-2030 - Federation of ...

Unmanned Aircraft Systems Roadmap 2005-2030 - Federation of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UAS ROADMAP <strong>2005</strong><br />

2.6 UAS PROGRAMMATIC DATA<br />

Between 1990 and 1999, DoD invested over $3 billion in UAS development, procurement, and operations<br />

(see Table 2.6-1). In the wake <strong>of</strong> September 11, 2001, FY03 was the first billion-dollar year in UAS<br />

history and FY05 will be the first two billion-dollar year (see Figure 2.6-1 and Tables 2.6-2 and 2.6-3).<br />

The U.S. UAS inventory is expected to grow from 250 today to 675 by 2010 and 1400 by 2015 (not<br />

including micro and mini UA) and to support a wider range <strong>of</strong> missions—e.g. signals intelligence<br />

(SIGINT), cargo, communication relay, and Suppression <strong>of</strong> Enemy Air Defenses (SEAD)—compared to<br />

today’s imagery reconnaissance and strike roles.<br />

TABLE 2.6-1. SUMMARY STATUS OF RECENT UAS PROGRAMS.<br />

System Manufacturer<br />

Lead<br />

Service<br />

First<br />

Flight IOC<br />

<strong>Aircraft</strong><br />

Built<br />

<strong>Aircraft</strong><br />

Fielded Status<br />

MQ-1/Predator General Atomics Air Force 1994 <strong>2005</strong> 100+ 60 100+ ordered<br />

RQ-2/Pioneer Pioneer UAV, Inc. Marine<br />

Corps<br />

1985 1986 175 35<br />

Sustainment<br />

through FY13<br />

RQ-3/DarkStar Lockheed Martin Air Force 1996 n/a 3 0 Cancelled ‘99<br />

RQ-4/G’Hawk Northrop Grumman Air Force 1998 2006 10 7 51 planned<br />

RQ-4/G’Hawk Northrop Grumman Navy 2004 n/a 2 2 2 planned<br />

RQ-5/Hunter Northrop Grumman Army 1991 n/a 72 35 18 on order<br />

RQ-6/Outrider Alliant Techsystems Army 1997 n/a 19 0 Cancelled ‘99<br />

RQ-7/Shadow200 AAI Army 1991 2003 100+ 90 164 planned<br />

RQ-8/Fire Scout Northrop Grumman Navy 1999 2007 5 0 168 planned<br />

MQ-9/Predator B General Atomics Air Force 2001 TBD 5 0 63 planned<br />

CQ-10/Snow Goose MMIST Army 2002 <strong>2005</strong> 10 0 49 planned<br />

$M (TY$)<br />

3500<br />

3000<br />

2500<br />

2000<br />

1500<br />

1000<br />

500<br />

0<br />

106<br />

144<br />

1998<br />

1989<br />

1990<br />

165<br />

252<br />

430<br />

1991<br />

1992<br />

1993<br />

1994<br />

225<br />

267<br />

272 553<br />

1995<br />

1996<br />

1997<br />

1998<br />

359<br />

420<br />

388<br />

284<br />

363<br />

763<br />

FIGURE 2.6-1. DOD ANNUAL FUNDING PROFILE FOR UAS.<br />

1999<br />

2000<br />

2001<br />

2002<br />

1448<br />

2003<br />

SECTION 2 - CURRENT UA PROGRAMS<br />

Page 37<br />

2004<br />

1631<br />

2166<br />

<strong>2005</strong><br />

2006<br />

1946<br />

2074<br />

2007<br />

2249<br />

2008<br />

2845<br />

2009<br />

2952<br />

2010<br />

3113<br />

2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!