06.01.2013 Views

Unmanned Aircraft Systems Roadmap 2005-2030 - Federation of ...

Unmanned Aircraft Systems Roadmap 2005-2030 - Federation of ...

Unmanned Aircraft Systems Roadmap 2005-2030 - Federation of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UAS ROADMAP <strong>2005</strong><br />

is NSWC Panama City, and the transition Manager is NAVSEA PMS 420, the Littoral Combat Ship<br />

(LCS) Mission Modules Program Office.<br />

JUSC 2 will provide the LCS a capability to concurrently operate a large number <strong>of</strong> unmanned systems<br />

specifically <strong>of</strong> interest to the Navy, including USVs; UUVs ; and UA. Additionally, JUSC 2 will provide<br />

the interfaces and means for LCS to also operate the Army's Shadow 200 UA at LVL 4/5 and the USAF<br />

Predator B UA (actually a surrogate - most likely General Atomics I-GNAT) at LVL 3 via a STANAG<br />

4586 compliant Common <strong>Unmanned</strong> systems Control Station (CUCS).<br />

Finally, JUSC 2 will also provide a means for LCS to operate Army and USAF (as well as Navy) UGVs<br />

via a JAUS-compliant common control system developed by USAF (AFRL - Tyndall). By applying both<br />

JAUS and STANAG 4586 to a large number <strong>of</strong> unmanned vehicles, JUSC 2 will demonstrate that the<br />

Navy can use Army and USAF UA and UGVs, and that other services in littoral or riverine situations can<br />

take control <strong>of</strong> and use Navy unmanned vehicles, such as USVs and potentially UUVs and UGVs.<br />

The JUSC 2 ACTD has a prototype system called <strong>Unmanned</strong> Vehicles Common Control (UVCC) installed<br />

onboard HSV-2 SWIFT. UVCC v8.1a, which was tested on HSV-2 in FY04, was delivered to the LCS<br />

Flight 0 prime contractors on 18 August 2004. This initial spiral provides interfaces to USVs and UUVs.<br />

A second spiral, UVCC v8.2, was installed onboard HSV-2 in September 2004. This second spiral adds<br />

an interface for Fire Scout VTUAV via the Tactical Control System (TCS). JUSC 2 will be completed<br />

with a full at-sea demonstration during JFTX-07 in early FY2007. Transition will then continue under the<br />

LCS acquisition program.<br />

APPENDIX J – UNMANNED GROUND VEHICLES<br />

Page J-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!