202.11 Backfill the cavity created by the removal item according to 202.02, except when the cavity lies within the limits of subsequent excavation or other work. 202.11 Manhole, Catch Basin, and Inlet Removed. Remove existing drainage structures of the types designated for removal. Take ownership of castings unless otherwise noted on the plans. Backfill the cavity created by the removal item according to 202.02, except when the cavity lies within the limits of subsequent excavation or other work. 202.12 Manhole, Catch Basin, and Inlet Abandoned. Remove existing drainage structures of the types designated to be abandoned to a minimum of 1 foot (0.3 m) below the finished subgrade or ground surface. Do not damage pipes that are to remain. Take ownership of castings unless otherwise noted on the plans. Connect existing pipes with new pipe through the structures. Seal the existing inlet and outlet pipes with precast vitrified or concrete stoppers or with masonry of a type and thickness to fill the inlet or outlet pipe. After connecting or sealing the existing pipes and removing the walls to the required depth, backfill the remaining cavities according to 202.02. If using connecting pipes, carefully hand tamp backfill under and around the pipe according to 202.02. 202.13 Method of Measurement. If the Contract specifies that removal of structures and obstructions is on a lump sum basis, the work will include all structures or obstructions encountered at locations or within areas designated in the Contract Documents. However, the Department will measure asphalt wearing course removal on a bridge separate from the lump sum item for structure removal. If the Contract specifies that removal of specific items is on a unit basis, the Department will measure the quantity of each item by the unit stipulated in the Contract. 202.14 Basis of Payment. Payment is full compensation for all work involved in the removal and storage, reuse, or disposal of structures and obstructions, including excavation and backfill incidental to their removal, removing the contents of the underground storage and septic tanks and the custody, preservation, storage on the Right-of-Way, and disposal as provided in this specification. For pipe removed and reused or stored, the Department will pay for the accepted work under Item 202 Pipe Removed for Reuse or Storage. For unusable pipe removed, the Department will pay for the accepted work under Item 202 Pipe Removed. If the Contract Documents do not include a pay item for Item 202 Asbestos Pipe Removed, then the Department will pay for removal and disposal of asbestos pipe according to 109.05. When removed pavement is replaced with embankment material, the Department will pay for the embankment material under the applicable 203 or 204 pay item. When pipe is removed from beneath existing pavement, the Department will pay for pavement removal under the applicable pay item for pavement 90
91 202.14 removal or excavation, and the Department will pay for new pavement under the applicable pavement pay item. Include all of the costs and work associated with compliance of the rules or regulations under Item 202 Regulated Underground Storage Tank Removed. If the underground storage tank is not regulated, the work does not include obtaining inspection services, permits, testing excavated material, or closure reporting and the payment will be under Item 202 Underground Storage Tank Removed. The Department will pay for accepted quantities at the contract prices as follows: Item Unit Description 202 Lump Sum Structure Removed 202 Lump Sum, or Portions of Structure Cubic Yard or Pound Removed (Cubic Meter or Kilogram) 202 Foot (Meter) Pipe Removed for Reuse or Storage 202 Foot (Meter) Pipe Removed 202 Foot (Meter) Asbestos Pipe Removed 202 Square Yard Pavement Removed (Square Meter) 202 Square Yard Wearing Course Removed (Square Meter) 202 Square Yard Base Removed (Square Meter) 202 Square Foot Walk Removed (Square Meter) 202 Lump Sum Steps Removed 202 Foot (Meter) Curb Removed 202 Foot (Meter) Curb and Gutter Removed 202 Foot or Gutter Removed Square Yard (Meter or Square Meter) 202 Foot (Meter) Curb Removed for Storage 202 Each Precast Traffic Divider Removed for Reuse or Storage 202 Lump Sum Building Demolished 202 Each Underground Storage Tank Removed 202 Each Regulated Underground Storage Tank Removed 202 Each Septic Tank Removed 202 Each Privy Vault Removed 202 Foot (Meter) Guardrail Removed 202 Foot (Meter) Guardrail Removed for Reuse or Storage 202 Foot (Meter) Fence Removed for Reuse or Storage 202 Each Manhole Removed 202 Each Manhole Abandoned 202 Each Catch Basin or Inlet Removed
- Page 45 and 46: 39 107.10 Section 4733-37-04, Measu
- Page 47 and 48: 41 107.12 B. Contractor’s Use of
- Page 49 and 50: 43 107.13 $5,000,000 and Each Occur
- Page 51 and 52: 45 107.16 as authorized by Change O
- Page 53 and 54: 47 107.19 beginning construction of
- Page 55 and 56: 108.02 The Director will calculate
- Page 57 and 58: 108.03 Items into component activit
- Page 59 and 60: 53 108.06 request in writing to the
- Page 61 and 62: 55 108.07 escalated labor and mater
- Page 63 and 64: 57 108.10 108.10 Payroll Records. K
- Page 65 and 66: 59 109.02 Thousand Board Feet, MBF
- Page 67 and 68: 61 109.03 TABLE 109.02-2 SI (METRIC
- Page 69 and 70: 1. Administration. 2. Superintenden
- Page 71 and 72: 65 109.05 g. If materials are taken
- Page 73 and 74: 67 109.05 charges. If the Contracto
- Page 75 and 76: 69 109.05 However, compensation for
- Page 77 and 78: 71 109.05 currently on the Project
- Page 79 and 80: 73 109.05 wage, submit payroll and
- Page 81 and 82: c. Proof of escalated cost for labo
- Page 83 and 84: 77 109.05 overhead provided the cri
- Page 85 and 86: 79 109.06 If the original material
- Page 87 and 88: 81 109.12 complete. Final Inspectio
- Page 89 and 90: 200 EARTHWORK ITEM 201 CLEARING AND
- Page 91 and 92: 202.01 Description 202.02 General C
- Page 93 and 94: 87 202.04 Where alteration of an ex
- Page 95: 89 202.08 ground surface. Break up
- Page 99 and 100: 93 203.03 F. Excavation. The excava
- Page 101 and 102: 95 203.04 c. Perform the tests on e
- Page 103 and 104: 97 203.06 granular material in a un
- Page 105 and 106: 99 203.07 6. Construct the other em
- Page 107 and 108: 101 203.09 the bottom of the ditch,
- Page 109 and 110: 103 203.10 If during excavation the
- Page 111 and 112: 105 204.03 Furnish geotextile fabri
- Page 113 and 114: 107 204.07 Operate equipment at a s
- Page 115 and 116: ITEM 205 CHEMICALLY STABILIZED EMBA
- Page 117 and 118: 111 205.06 205.06 Method of Measure
- Page 119 and 120: 206.05 1. Cement or Lime Kiln Dust.
- Page 121 and 122: 115 206.06 Cover the completed chem
- Page 123 and 124: 117 207.03 with construction seed a
- Page 125 and 126: 119 207.04 advance of needing them.
- Page 127 and 128: The Department will measure Inlet P
- Page 129 and 130: 123 208.02 208.02 Regulations on th
- Page 131 and 132: 125 208.07 E. Maintain a stemming d
- Page 133 and 134: 208.09 During the 5-minute delay, t
- Page 135 and 136: 129 208.10 S. Use the same diameter
- Page 137 and 138: 131 208.14 208.14 Pre-Blast Conditi
- Page 139 and 140: 133 208.17 B. The airblast and nois
- Page 141 and 142: 135 208.21 B. Report of Loss. If a
- Page 143 and 144: 137 209.01 209.01 Description. This
- Page 145 and 146: 250 PAVEMENT REPAIRS ITEM 251 PARTI
202.11<br />
Backfill the cavity created by the removal item according to 202.02, except<br />
when the cavity lies within the limits <strong>of</strong> subsequent excavation or other work.<br />
202.11 Manhole, Catch Basin, <strong>and</strong> Inlet Removed. Remove existing<br />
drainage structures <strong>of</strong> the types designated for removal. Take ownership <strong>of</strong><br />
castings unless otherwise noted on the plans.<br />
Backfill the cavity created by the removal item according to 202.02, except<br />
when the cavity lies within the limits <strong>of</strong> subsequent excavation or other work.<br />
202.12 Manhole, Catch Basin, <strong>and</strong> Inlet Ab<strong>and</strong>oned. Remove existing<br />
drainage structures <strong>of</strong> the types designated to be ab<strong>and</strong>oned to a minimum <strong>of</strong> 1<br />
foot (0.3 m) below the finished subgrade or ground surface. Do not damage pipes<br />
that are to remain. Take ownership <strong>of</strong> castings unless otherwise noted on the<br />
plans.<br />
Connect existing pipes with new pipe through the structures. Seal the existing<br />
inlet <strong>and</strong> outlet pipes with precast vitrified or concrete stoppers or with masonry <strong>of</strong><br />
a type <strong>and</strong> thickness to fill the inlet or outlet pipe.<br />
After connecting or sealing the existing pipes <strong>and</strong> removing the walls to the<br />
required depth, backfill the remaining cavities according to 202.02. If using<br />
connecting pipes, carefully h<strong>and</strong> tamp backfill under <strong>and</strong> around the pipe<br />
according to 202.02.<br />
202.13 Method <strong>of</strong> Measurement. If the Contract specifies that removal <strong>of</strong><br />
structures <strong>and</strong> obstructions is on a lump sum basis, the work will include all<br />
structures or obstructions encountered at locations or within areas designated in the<br />
Contract Documents. However, the <strong>Department</strong> will measure asphalt wearing<br />
course removal on a bridge separate from the lump sum item for structure removal.<br />
If the Contract specifies that removal <strong>of</strong> specific items is on a unit basis, the<br />
<strong>Department</strong> will measure the quantity <strong>of</strong> each item by the unit stipulated in the<br />
Contract.<br />
202.14 Basis <strong>of</strong> Payment. Payment is full compensation for all work involved<br />
in the removal <strong>and</strong> storage, reuse, or disposal <strong>of</strong> structures <strong>and</strong> obstructions,<br />
including excavation <strong>and</strong> backfill incidental to their removal, removing the<br />
contents <strong>of</strong> the underground storage <strong>and</strong> septic tanks <strong>and</strong> the custody, preservation,<br />
storage on the Right-<strong>of</strong>-Way, <strong>and</strong> disposal as provided in this specification.<br />
For pipe removed <strong>and</strong> reused or stored, the <strong>Department</strong> will pay for the<br />
accepted work under Item 202 Pipe Removed for Reuse or Storage. For unusable<br />
pipe removed, the <strong>Department</strong> will pay for the accepted work under Item 202 Pipe<br />
Removed.<br />
If the Contract Documents do not include a pay item for Item 202 Asbestos<br />
Pipe Removed, then the <strong>Department</strong> will pay for removal <strong>and</strong> disposal <strong>of</strong> asbestos<br />
pipe according to 109.05.<br />
When removed pavement is replaced with embankment material, the<br />
<strong>Department</strong> will pay for the embankment material under the applicable 203 or 204<br />
pay item. When pipe is removed from beneath existing pavement, the <strong>Department</strong><br />
will pay for pavement removal under the applicable pay item for pavement<br />