05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

691<br />

Sheet piling left in place<br />

<strong>Material</strong>s, 295<br />

Sheet piling, left in place, 295<br />

Sheeting, 570, 571, 653, 795, 796<br />

Traffic sign, 521<br />

Shipping, storage & erection <strong>of</strong><br />

structural steel, 359<br />

Shop assembly, structural steel, 355<br />

Shop drawings, structures, 282, 345<br />

Short-circuit test, 547<br />

Shoulders, 491<br />

Rumble strips on, 491<br />

Shrubs, planting, 618<br />

Sidewalk finish, 325<br />

Sidewalk, temporary, 488<br />

Sign, 16, 485, 520, 522, 524, 527, 529,<br />

530, 531, 532, 533, 534, 536, 537,<br />

653, 796, 797, 798<br />

Contractor personnel requirements,<br />

538<br />

Erection, 527<br />

Fabrication, 522<br />

Flasher assembly, 533<br />

Service, 534<br />

Storage, 527<br />

Sign flasher assembly, 533<br />

Sign lighting <strong>and</strong> electrical signs, 533<br />

Ballast, 535<br />

Changeable-message sign, 533, 796<br />

Conduit, 533, 798<br />

Disconnect switch, 534<br />

Electrical signs, 535<br />

Flexible conduit, 798<br />

Inspection, 535<br />

Internally illuminated sign, 533,<br />

797<br />

<strong>Material</strong>s, 533<br />

Photoelectric controls, 535<br />

Power service, 546<br />

Removal, storage or reerection, 535<br />

School speed limit sign assembly,<br />

798<br />

Sign flasher assembly, 533, 797<br />

Sign service, 534<br />

Signs wired, 534<br />

Switch enclosure, 534<br />

Testing, 535<br />

Timer with enclosure, 535, 798<br />

Sign service, 534<br />

877<br />

Sign supports, 524<br />

Ground mounted, 525<br />

Overpass structure mounted, 526,<br />

527<br />

Pole mounted, 525<br />

Span wire, 527<br />

Signal lamps, 799<br />

Signal supports, 543, 811<br />

Significant changes in the scope <strong>of</strong><br />

work, 17<br />

Signs wired, 534<br />

Signs, for work zone marking, 474<br />

Signs, traffic, 520<br />

Site conditions, differing, 17<br />

Slag, cement from, 659<br />

Sliding plates, 396<br />

Slip form, 318<br />

Bridge railing, 317<br />

Slope <strong>and</strong> channel protection, 421<br />

Concrete, 423<br />

Crushed aggregate, 423<br />

Dumped rock, 424<br />

<strong>Material</strong>s, 421<br />

Paved gutter, 424<br />

Riprap, 422<br />

Rock channel protection, 424<br />

Slump, 268, 313, 315<br />

Portl<strong>and</strong> cement concrete, 268, 318<br />

Structural concrete, 315<br />

Small quantities, 32<br />

Sod, 615, 616, 617, 618, 625, 632<br />

Sodding, 615, 625<br />

Erosion protection, 625<br />

Placing, 617<br />

Preparation, 616<br />

Sod, 617<br />

Watering, 618<br />

Sodium chloride, 746<br />

Soil, 4, 429, 562, 598, 602, 603, 604,<br />

605, 613, 614, 615, 629, 630, 768<br />

Erosion control, 116<br />

Renovating existing, 598<br />

Solid state digital type controller, 810<br />

Source <strong>of</strong> supply <strong>and</strong> quality<br />

requirements, 25<br />

Span wire supports, 527<br />

Special provisions<br />

Coordination with plans <strong>and</strong><br />

specifications, 25<br />

<strong>Specifications</strong>,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!