05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Air-entraining, blast furnace slag,<br />

659<br />

Blast furnace slag, 659<br />

Portable concrete barrier, 485, 499<br />

Portl<strong>and</strong> cement, 148, 267, 385, 403,<br />

429, 634, 659<br />

Air-entraining, 659<br />

Concrete base, 163<br />

High early strength, 659<br />

Post construction meeting, 57<br />

Posts, 452, 455, 456, 494, 645, 649,<br />

651, 752, 753, 755, 756, 766, 773,<br />

792<br />

Fence, 119, 120, 121, 122, 455,<br />

456, 457, 644, 645, 646, 750,<br />

751, 755, 756<br />

Guardrail, 452, 453, 454, 486, 520,<br />

645, 646, 756<br />

U-Channel, 651, 792<br />

Wood, 2, 538, 539, 543, 549, 550,<br />

602, 612, 651, 655, 755, 785,<br />

812<br />

Power breaker, 823<br />

Power service, 516, 533, 539, 546<br />

Traffic signal, 546<br />

Precast concrete, 499<br />

Modular construction, manholes,<br />

446<br />

Precast concrete curb, 461<br />

Precast reinforced concrete box<br />

sections, 430, 431<br />

Precast reinforced concrete manhole<br />

riser, 726<br />

Precast reinforced concrete outlets,<br />

445, 447, 726<br />

Precoated galvanized culverts, 731<br />

Preconstruction conference <strong>and</strong><br />

progress schedule, 49<br />

Preconstruction testing, pneumatically<br />

placed mortar, 405<br />

Prefabricated edge drain, 450, 769<br />

Preformed Bearing Pads, 646, 761<br />

Preformed elastomeric compression<br />

joint sealer, 395, 692<br />

Preformed expansion joint filler, 445<br />

Preliminary wrapping, trees, 621<br />

Preparation <strong>of</strong>, 12, 148, 149, 200, 338,<br />

401, 402, 403, 405, 615, 616<br />

Preparation <strong>of</strong> existing soil, for<br />

renovation, 598<br />

874<br />

Preparation <strong>of</strong> repair are,<br />

pneumatically placed mortar, 405<br />

Preparation <strong>of</strong> subgrade, stockpiled<br />

topsoil, 596<br />

Prequalification <strong>of</strong> bidders, 11<br />

Preservative, 452, 648, 766, 767<br />

Preservative treatment for lumber, 766<br />

Pressure treated guardrail, posts,<br />

braces, block, 452, 756<br />

Pressure, pneumatically placed mortar,<br />

405<br />

Prestressed concrete bridge members,<br />

383<br />

Cold weather operations, 386<br />

Concrete, 388<br />

<strong>Construction</strong> methods, 387<br />

Equipment, 386<br />

<strong>Material</strong>s, 385<br />

Prestressing steel, 764<br />

Prestressing str<strong>and</strong>s, 390<br />

Release <strong>of</strong> prestressing str<strong>and</strong>s, 390<br />

Transportation, storage <strong>and</strong><br />

erection, 390<br />

Prestressing steel, 385<br />

Prime coat<br />

Aggregate, 200<br />

Bituminous material, 200<br />

Equipment, 200<br />

Preparation <strong>of</strong> surface, 200<br />

Weather Limitations, 200<br />

Primer, 58, 200, 338, 633, 642, 660,<br />

663, 743<br />

Primer coat, 338<br />

Processes, patented, 36<br />

Progress, 49, 51, 56<br />

Schedule <strong>and</strong> preconstruction<br />

conference, 49<br />

Unsatisfactory, 56<br />

Project Engineer, authority <strong>and</strong> duties,<br />

24<br />

Proportioning, 267, 268, 273, 274,<br />

275, 467<br />

Pneumatically placed mortar, 405<br />

Portl<strong>and</strong> cement concrete, 268, 273<br />

Structural concrete, 313<br />

Proposal, 5, 6, 7, 8, 11, 12, 13, 14, 15,<br />

16, 25, 34, 39, 41, 49, 430, 434,<br />

448<br />

Combination or conditional, 14<br />

Consideration <strong>of</strong>, 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!