785, 788 Luminaire for high intensity discharge lamp Working drawings, 521 Machine bolts, structural, 759 Magnetic particle inspection, 357 Magnetometer sensor probes, 545 Main power breakers, 823 Maintaining pavement markings, 472, 473 Maintaining traffic, 470 Asphalt concrete for maintaining traffic, 483 Flaggers, 470, 474 Law enforcement of ficer, 474 Local traffic, through traffic, 470 Pavement marking operations, 483 Performance, 483 Road closed, 472 Temporary signal, 474 Traffic maintained, 473 Work zone markings, 474 Maintenance during construction, 28 Failure to, 29 Maintenance of temporary pavement, 487 Maintenance of temporary structure, 290 Manholes, catchbasins, inlets, monuments, 444 Adjusted to grade, 447 Brick and masonry, 446 Concrete, cast in place, 447 Material s, 445 Precast concrete, modular construction, 446 Reconstructed to grade, 447 Riser section, precast, 726 Steps, 445 Manual control and pushbutton, controller, 823 Manufacturers, cellular retaining walls, 464 Markers, raised pavement, 495 Masonry, 426, 428, 429, 444, 446, 632, 636, 648, 658, 689 Masonry blocks, concrete, 446 Masonry cement, 426, 659 Material Control of , 32 870 Department furnished, 34 Guaranty, 15 Hand ling, 34 Patented, 36 Plant sampling, 33 Quality requirements, 32 Reclaimed, 157, 159 Samples, 32 Small quantities, 33 Source of supply, 32 Storage of , 33 Structural expansion and contraction, 395 Testing plan, 33 Tests, 32 Unacceptable, 34 Material s for temporary applications, 33 Material s found on the work, 19 Measurement of quantities, 57 Measurement, acceptance, and payment, 57 Median, concrete, 462 Messenger wire, 521, 539, 544, 813 Meter and chamber removed, water main, 569 Methods, equipment, 51 Microprocessor, traffic signal controller, 818, 834 Mill test reports, 394, 398, 399 Mineral filler, 634 Minority business enterprise, 48 Mix designs for PCC pavement, 273 Mixers, PCC, 278 Mixing plants, asphalt concrete, 183 Mobilization, 296, 444, 502, 503, 504 Pile driving equipment, 296 Monument assemblies, 447 Monument boxes, 447 Monuments, 444, 445, 447, 501 Mortar, 310, 407, 408, 430, 431, 445, 467, 469, 470, 562, 631, 637, 640, 695, 697, 732 Lined corrugated steel pipe, 732 Quick setting, 148, 695, 697, 698 Mulching, 117, 120, 121, 602, 603, 612, 613, 614, 615, 621, 632 Trees, shrubs, 621 MUTCD, 471, 572 Navigable water, bridges over, 37
NEMA TS-2, 805, 811, 816, 818, 819, 820, 827 NEMA, TS-1, TS-2, cabinet and controller, 810 Neoprene elastomer bearings, 762 No waiver or legal rights, 46 Nondestructive testing, 356 Non-reflective sheeting, sign, 796 Non-reinforced concrete pipe, 430, 431, 432, 701 Nuts, high-strength, 350 Ohio Manual of Uniform Traffic Control Devices, 3, 471 Oiling forms, 306 Opening project to traffic, 44 Operations, pavement markings, 483 Optically programmed signal lamps, 799 Outlets, precast reinforced concrete, 726 Outlets, underdrain, 450 Overpass structure mounted sign supports, 521 Paint, 149, 398, 544, 546, 624, 642, 657, 700, 733, 743, 744, 745, 799, 808, 810 Aluminum, 746 Blue-green vinyl finish coat, 754 Inorganic zinc silicate primer, 743, 759 Material , 744 Structural steel prime, 743 Painting, structural steel, 343 Panels, flashing arrows, 484 Parking lot stall markings, 575, 576 Partial depth pavement repair, 139 Area to be replaced, 139 Placement of asphalt concrete, 139 Patching concrete structures, 401 Placing, finishing, and curing, 402 Preparation of surface, 402 Removal of disintegrated concrete, 401 Patented devices, materials, and processes, 36 Paved gutter, 424, 425 Pavement, 139, 140, 141, 143, 144, 148, 151, 166, 168, 201, 253, 266, 486, 495, 572, 581, 583, 587, 588, 594, 772 871 Marking, 474, 573 Preformed fillers, 395, 398 Preparation for marking, 573 Removal, 142 Repair, 139 Rigid, 276 Pavement (see Pavement, Portland Cement Concrete), 266 Pavement deficiency Pavement incidentals, 691 Pavement Markings, 470, 474, 476, 483, 484, 572, 577, 847 Application, 573, 575, 581, 582, 584, 585, 587, 588, 589, 590, 592, 594, 595 Center lines, 576 Channelizing lines, 576 Curb and island marking, 576 Deduction for deficiency, 577 Dotted lines, 576 Edge types, 576 Equipment, 575, 577, 581, 583, 584, 587, 588, 589, 590, 593, 594 Glass Beads, 475, 476, 581, 657, 853 Lane arrows, 576 Lane lines, 482, 576 Layout and premarking, 575 Line placement tolerance, 575 Long lines, 576 Maintained, 474 Marking types, 575 Material s, 572, 847 Operations, 483 Parking lot stall marking, 576 Pavement preparation, 575 Polyester, 581, 629, 657, 848 Preformed, 851 Removal, 577 Stop and crosswalk lines, 576 Symbol marking, 576 Thermoplastic, 583, 585, 586, 657, 850 Traffic paint, 586 Transverse lines, 576 Two way radio communications, 576 Words on pavement, 576 Work zone, 474
Page 1 and 2:
STATE OF OHIO DEPARTMENT OF TRANSPO
Page 3 and 4:
Table of Contents 100 General Provi
Page 5 and 6:
Item 613 Low Strength Mortar Backfi
Page 7 and 8:
100 GENERAL PROVISIONS 101 DEFINITI
Page 9 and 10:
3 101.02 FHWA Federal Highway Admin
Page 11 and 12:
TODS Tourist-Oriented Directional S
Page 13 and 14:
7 101.03 Contract Price. The amount
Page 15 and 16:
9 101.03 Right-of-Way. A general te
Page 17 and 18:
102 BIDDING REQUIREMENTS AND CONDIT
Page 19 and 20:
ENTITY SUBMITTING PROPOSAL REQUIRED
Page 21 and 22:
15 102.15 B. The Bidder fails to fu
Page 23 and 24:
104.02 Revisions to the Contract Do
Page 25 and 26:
19 104.03 Work. The adjustment will
Page 27 and 28:
21 104.05 Within seven (7) calendar
Page 29 and 30:
23 104.05 d. References to the appl
Page 31 and 32:
25 105.03 Work consists of repairs,
Page 33 and 34:
27 105.08 105.08 Cooperation Betwee
Page 35 and 36:
29 105.15 Maintain the previous cou
Page 37 and 38:
105.18 Under the regulations cited
Page 39 and 40:
33 106.03 request. Furnish the requ
Page 41 and 42:
C. Applications. 35 106.10 1. When
Page 43 and 44:
37 107.06 Such inspections will not
Page 45 and 46:
39 107.10 Section 4733-37-04, Measu
Page 47 and 48:
41 107.12 B. Contractor’s Use of
Page 49 and 50:
43 107.13 $5,000,000 and Each Occur
Page 51 and 52:
45 107.16 as authorized by Change O
Page 53 and 54:
47 107.19 beginning construction of
Page 55 and 56:
108.02 The Director will calculate
Page 57 and 58:
108.03 Items into component activit
Page 59 and 60:
53 108.06 request in writing to the
Page 61 and 62:
55 108.07 escalated labor and mater
Page 63 and 64:
57 108.10 108.10 Payroll Records. K
Page 65 and 66:
59 109.02 Thousand Board Feet, MBF
Page 67 and 68:
61 109.03 TABLE 109.02-2 SI (METRIC
Page 69 and 70:
1. Administration. 2. Superintenden
Page 71 and 72:
65 109.05 g. If materials are taken
Page 73 and 74:
67 109.05 charges. If the Contracto
Page 75 and 76:
69 109.05 However, compensation for
Page 77 and 78:
71 109.05 currently on the Project
Page 79 and 80:
73 109.05 wage, submit payroll and
Page 81 and 82:
c. Proof of escalated cost for labo
Page 83 and 84:
77 109.05 overhead provided the cri
Page 85 and 86:
79 109.06 If the original material
Page 87 and 88:
81 109.12 complete. Final Inspectio
Page 89 and 90:
200 EARTHWORK ITEM 201 CLEARING AND
Page 91 and 92:
202.01 Description 202.02 General C
Page 93 and 94:
87 202.04 Where alteration of an ex
Page 95 and 96:
89 202.08 ground surface. Break up
Page 97 and 98:
91 202.14 removal or excavation, an
Page 99 and 100:
93 203.03 F. Excavation. The excava
Page 101 and 102:
95 203.04 c. Perform the tests on e
Page 103 and 104:
97 203.06 granular material in a un
Page 105 and 106:
99 203.07 6. Construct the other em
Page 107 and 108:
101 203.09 the bottom of the ditch,
Page 109 and 110:
103 203.10 If during excavation the
Page 111 and 112:
105 204.03 Furnish geotextile fabri
Page 113 and 114:
107 204.07 Operate equipment at a s
Page 115 and 116:
ITEM 205 CHEMICALLY STABILIZED EMBA
Page 117 and 118:
111 205.06 205.06 Method of Measure
Page 119 and 120:
206.05 1. Cement or Lime Kiln Dust.
Page 121 and 122:
115 206.06 Cover the completed chem
Page 123 and 124:
117 207.03 with construction seed a
Page 125 and 126:
119 207.04 advance of needing them.
Page 127 and 128:
The Department will measure Inlet P
Page 129 and 130:
123 208.02 208.02 Regulations on th
Page 131 and 132:
125 208.07 E. Maintain a stemming d
Page 133 and 134:
208.09 During the 5-minute delay, t
Page 135 and 136:
129 208.10 S. Use the same diameter
Page 137 and 138:
131 208.14 208.14 Pre-Blast Conditi
Page 139 and 140:
133 208.17 B. The airblast and nois
Page 141 and 142:
135 208.21 B. Report of Loss. If a
Page 143 and 144:
137 209.01 209.01 Description. This
Page 145 and 146:
250 PAVEMENT REPAIRS ITEM 251 PARTI
Page 147 and 148:
141 252.05 If the Contract does not
Page 149 and 150:
Item Unit Description 253 Square Ya
Page 151 and 152:
255.10 Basis of Payment 145 255.01
Page 153 and 154:
147 255.07 Apply the liquid membran
Page 155 and 156:
149 256.03 256.03 Equipment. Use a
Page 157 and 158:
151 256.10 irrespective of the dept
Page 159 and 160:
153 257.05 of the pavement is unifo
Page 161 and 162:
155 258.03 the 1/2 -inch (12.5 mm)
Page 163 and 164:
300 BASES ITEM 301 ASPHALT CONCRETE
Page 165 and 166:
159 302.02 The Contractor may use r
Page 167 and 168:
161 304.03 304.03 Before Spreading.
Page 169 and 170:
163 304.08 Where variable depth is
Page 171 and 172:
165 320.04 If using a resonant freq
Page 173 and 174:
167 321.04 quality by cracking at l
Page 175 and 176:
169 401.02 401.02 Mix Design and Qu
Page 177 and 178:
Asphalt Mix Application Heavy Traff
Page 179 and 180:
173 401.05 Test blended RAP stockpi
Page 181 and 182:
175 401.11 401.11 Hauling. Use truc
Page 183 and 184:
TABLE 401.13-3 PNEUMATIC TIRE ROLLE
Page 185 and 186:
179 401.16 lighting at the beginnin
Page 187 and 188:
401.18 Form hot longitudinal joints
Page 189 and 190:
TABLE 401.21 Aggregate lb/yd 3 (kg/
Page 191 and 192:
185 402.06 402.06 Calibration. Cali
Page 193 and 194:
187 403.01 project use on non-ODOT
Page 195 and 196:
189 403.03 D. Copies of worksheets,
Page 197 and 198:
191 403.06 A. Sampling. The Departm
Page 199 and 200:
193 403.06 District lab on its own
Page 201 and 202:
195 403.07 the acceptance. While wo
Page 203 and 204:
197 403.08 Table 403.08-1, but fall
Page 205 and 206:
199 407.06 407.06 Application of As
Page 207 and 208:
201 408.08 rate of application, tem
Page 209 and 210:
203 409.05 409.05 Basis of Payment.
Page 211 and 212:
ITEM 411 STABILIZED CRUSHED AGGREGA
Page 213 and 214:
207 421.02 Ensure that the Binder h
Page 215 and 216:
A. Source of each individual materi
Page 217 and 218:
211 421.10 If the microsurfacing is
Page 219 and 220:
Item Unit Description 421 Square Ya
Page 221 and 222:
215 422.04 oversized material, revo
Page 223 and 224:
422.09 Before rolling, correct defi
Page 225 and 226:
Reject aggregate that does not meet
Page 227 and 228:
422 Square Yard Double Chip Seal (S
Page 229 and 230:
223 423.08 or spalling. Do not seal
Page 231 and 232:
225 424.04 submittal. For medium mi
Page 233 and 234:
227 441.02 If the F/A ratio using t
Page 235 and 236:
TABLE 441.02-1 (CONTINUED) Course T
Page 237 and 238:
TABLE 441.02-1 (CONTINUED) Course T
Page 239 and 240:
233 441.06 Limit adjustments of the
Page 241 and 242:
235 441.09 When the F-T value is sp
Page 243 and 244:
237 441.11 holding a Level 3 Asphal
Page 245 and 246:
TABLE 442.02-1 GYRATION LEVEL AND M
Page 247 and 248:
241 442.06 442.06 Compaction. Cease
Page 249 and 250:
TABLE 443.03-2 MIX PROPERTIES 243 4
Page 251 and 252:
2. Shot content (ASTM C612) Passing
Page 253 and 254:
446.01 Description 446.02 JMF Field
Page 255 and 256:
249 446.05 Fill core holes by the n
Page 257 and 258:
448.01 Description 448.02 JMF Field
Page 259 and 260:
450 RIGID PAVEMENT ITEM 451 REINFOR
Page 261 and 262:
255 451.04 track speed, and the fre
Page 263 and 264:
257 451.07 finishing the freshly pl
Page 265 and 266:
451.08 Immediately before paving, r
Page 267 and 268:
451.09 oil. Use an adequate bulkhea
Page 269 and 270:
263 451.15 self propelled machines
Page 271 and 272:
265 451.18 When zones of deficient
Page 273 and 274:
267 452.04 directs in writing. The
Page 275 and 276:
269 499.03 C. Concrete Classes. Usi
Page 277 and 278:
TABLE 499.03-4 CLASS HP CONCRETE 27
Page 279 and 280:
273 499.04 However, do not change t
Page 281 and 282:
TABLE 499.04-2 OPTION 2 CONCRETE (C
Page 283 and 284:
277 499.06 rigid pavement removal a
Page 285 and 286:
TABLE 499.08-1 EVERY BATCH TICKET N
Page 287 and 288:
281 499.09 When approved by the Eng
Page 289 and 290:
283 501.04 Prepare the shop drawing
Page 291 and 292:
285 501.05 drawing at least 24 hour
Page 293 and 294:
287 501.05 ii. Erection sequence fo
Page 295 and 296:
289 502.01 Accompany all certified
Page 297 and 298:
291 503.01 503.01 Description. This
Page 299 and 300:
293 503.08 503.08 Backfill. Backfil
Page 301 and 302:
295 504.01 provide the minimum cove
Page 303 and 304:
297 506.03 limits of the footing 3
Page 305 and 306:
299 506.04 506.04 Basis of Payment.
Page 307 and 308:
507.05 Do not use a follower unless
Page 309 and 310:
303 507.11 (75 mm) above the elevat
Page 311 and 312:
305 508.03 To compensate for falsew
Page 313 and 314:
509.09 Epoxy Coated Reinforcing Ste
Page 315 and 316:
TABLE 509.05-1M STANDARD BENDS Dime
Page 317 and 318:
311 509.10 If repair is required, c
Page 319 and 320:
511.03 Proportions 511.04 Mix Optio
Page 321 and 322:
511.09 511.09 Slump. Within the slu
Page 323 and 324:
FIGURE 1 ACI 308-81 511.11 Slipform
Page 325 and 326:
319 511.13 of principal stress and
Page 327 and 328:
321 511.16 from 50 to 100 °F (10 t
Page 329 and 330:
323 511.19 corners or edges, and ot
Page 331 and 332:
325 511.21 expansion joints. Saw gr
Page 333 and 334:
327 511.25 511.25 Basis of Payment.
Page 335 and 336:
329 512.03 Do not mix or apply the
Page 337 and 338:
2. Non-epoxy sealer. 331 512.03 a.
Page 339 and 340:
333 512.04 markings according to Se
Page 341 and 342:
335 512.06 Engineer with written in
Page 343 and 344:
337 512.07 200 psi (1400kPa) max.,
Page 345 and 346:
339 512.08 applying the waterproofi
Page 347 and 348:
341 512.09 512.09 Method of Measure
Page 349 and 350:
343 513.03 The Office of Materials
Page 351 and 352:
345 513.05 513.05 Fabricator Docume
Page 353 and 354:
347 513.12 before assembly. During
Page 355 and 356:
349 513.18 for up to 5-inch (127 mm
Page 357 and 358:
TABLE 513.20-1M Bolt Size (mm) To d
Page 359 and 360:
TABLE 513.20-2M 353 513.20 Bolt Siz
Page 361 and 362:
355 513.23 each workday, when weldi
Page 363 and 364:
357 513.25 A. Radiographic Inspecti
Page 365 and 366:
359 513.26 The fabrication quality
Page 367 and 368:
361 513.30 The Department will not
Page 369 and 370:
363 514.04 The quality control spec
Page 371 and 372:
365 514.05 inspection identifies a
Page 373 and 374:
367 514.07 continuously and uniform
Page 375 and 376:
369 514.11 supporting 250 pounds (1
Page 377 and 378:
371 514.13 1. For an automated blas
Page 379 and 380:
SW 846 Regulatory Concentration Ana
Page 381 and 382:
375 514.17 Except for primer, mix p
Page 383 and 384:
377 514.18 If mud cracking occurs,
Page 385 and 386:
514.20 F. Measure other areas or re
Page 387 and 388:
514.23 immediately before applying
Page 389 and 390:
Item Unit Description 514 Square Fo
Page 391 and 392:
385 515.07 members, and all other i
Page 393 and 394:
515.13 according to a method accept
Page 395 and 396:
515.15 production. When using admix
Page 397 and 398:
391 515.17 BEAM DIMENSIONAL TOLERAN
Page 399 and 400:
393 515.20 support locations. Durin
Page 401 and 402:
395 516.04 516.03 Coating. Coat exp
Page 403 and 404:
397 516.09 feet (meters) horizontal
Page 405 and 406:
Scuppers, structural steel and cast
Page 407 and 408:
401 518.10 518.10 Basis of Payment.
Page 409 and 410:
519.08 columns, the Department will
Page 411 and 412:
405 520.05 and two times the weight
Page 413 and 414:
407 520.11 520.11 Inspection and Te
Page 415 and 416:
Concrete footings will be paid for
Page 417 and 418:
411 524.02 plan requirements, with
Page 419 and 420:
413 524.05 groundwater must be cont
Page 421 and 422:
415 524.08 Determine density, visco
Page 423 and 424:
417 524.13 parts, do not allow thes
Page 425 and 426:
ITEM 526 APPROACH SLABS 526.01 Desc
Page 427 and 428:
600 INCIDENTALS ITEM 601 SLOPE AND
Page 429 and 430:
423 601.05 Stretchers are bags plac
Page 431 and 432:
425 601.12 mm) wide at the surface;
Page 433 and 434:
427 602.03 602.03 Construction Requ
Page 435 and 436:
Soil and granular embankment ......
Page 437 and 438:
paved invert ......................
Page 439 and 440:
Polyvinyl chloride sanitary pipe ..
Page 441 and 442:
435 603.05 place with approval from
Page 443 and 444:
437 603.08 cut end at an interior j
Page 445 and 446:
439 603.09 c. If resilient and flex
Page 447 and 448:
441 603.11 1. In a cut situation, p
Page 449 and 450:
603 Foot (Meter) ___" (___ mm) Cond
Page 451 and 452:
604.02 Use removed or excavated mat
Page 453 and 454:
447 604.07 mm). Ensure that the str
Page 455 and 456:
449 605.03 If the size of the under
Page 457 and 458:
605.07 Construct the underdrains ou
Page 459 and 460:
453 606.04 Space Type 5A guardrail
Page 461 and 462:
607.05 Horizontal Deflection 607.06
Page 463 and 464:
457 607.10 607.10 Basis of Payment.
Page 465 and 466:
608.09 The Department will measure
Page 467 and 468:
461 609.04 portions of adjacent sec
Page 469 and 470:
463 609.07 Where medians and traffi
Page 471 and 472:
465 610.04 Use metal sheets with a
Page 473 and 474:
467 610.09 610.09 Basis of Payment.
Page 475 and 476:
469 613.06 The Contractor may use f
Page 477 and 478:
614.03 B. When the highway under co
Page 479 and 480:
473 614.06 614.055 Surface Conditio
Page 481 and 482:
475 614.11 A. Acceptability and Exp
Page 483 and 484:
614.11 Apply Class I work zone mark
Page 485 and 486:
479 614.11 passing zone and places
Page 487 and 488:
481 614.12 approximately 4 inches (
Page 489 and 490:
Line Type Normal Spacing Feet (Mete
Page 491 and 492:
B. Work zone signal, pole, or contr
Page 493 and 494:
615.05 specified in Item 606, excep
Page 495 and 496:
489 616.01 616.01 Description. This
Page 497 and 498:
TABLE 617.06-1 Material Conversion
Page 499 and 500:
493 619.02 Furnish neat, sanitary,
Page 501 and 502:
495 620.03 620.03 Layout. Lay out a
Page 503 and 504:
497 621.05 When a casting is insert
Page 505 and 506:
499 621.10 The Department will meas
Page 507 and 508:
622.09 622.09 Basis of Payment. The
Page 509 and 510:
624.03 Method of Measurement 624.04
Page 511 and 512:
505 625.01 625.01 Description. This
Page 513 and 514:
625.10 Ensure that the grounding co
Page 515 and 516:
509 625.13 grounding conductor that
Page 517 and 518:
511 625.16 625.16 Grounding. Connec
Page 519 and 520:
513 625.19 Measure the earth resist
Page 521 and 522:
Pull boxes include the aggregate fo
Page 523 and 524:
517 625.23 except for a power servi
Page 525 and 526:
519 626.04 The Contractor may vary
Page 527 and 528:
Concrete, Class C..................
Page 529 and 530:
523 630.04 panels to achieve the si
Page 531 and 532:
525 630.06 galvanize steel structur
Page 533 and 534:
527 630.07 Provide for the attachme
Page 535 and 536:
Remove temporary overlay signs so a
Page 537 and 538:
630.15 The Department will measure
Page 539 and 540:
631.08 Controls 631.09 Electrical S
Page 541 and 542:
535 631.07 install the nipple. Ensu
Page 543 and 544:
Item Unit Description 631 Each Sign
Page 545 and 546:
539 632.04 Ensure that major items
Page 547 and 548:
541 632.06 Upon acceptance of the p
Page 549 and 550:
543 632.15 against undisturbed soil
Page 551 and 552:
545 632.23 Support cables installed
Page 553 and 554:
547 632.28 complete test records, t
Page 555 and 556:
549 632.30 include excavation, dewa
Page 557 and 558:
632 Each Power Service 632 Each Cov
Page 559 and 560:
553 633.07 1. Furnish a certified t
Page 561 and 562:
555 633.15 and software, in one or
Page 563 and 564:
557 633.17 5. A minimum of three ti
Page 565 and 566:
559 633.18 potential modifications
Page 567 and 568:
633 Each Controller, Master, Traffi
Page 569 and 570:
563 638.03 The metric equivalent pi
Page 571 and 572:
565 638.07 L. Thrust Blocking. Furn
Page 573 and 574:
567 638.13 Install valve boxes on a
Page 575 and 576:
569 638.16 it to the extended branc
Page 577 and 578:
571 638.20 638 Foot (Meter) ___ inc
Page 579 and 580:
573 641.03 641.03 General. Apply li
Page 581 and 582:
575 641.05 At the end of the projec
Page 583 and 584:
577 641.10 communication between th
Page 585 and 586:
Keep the paint thoroughly mixed dur
Page 587 and 588:
ITEM 643 POLYESTER PAVEMENT MARKING
Page 589 and 590:
583 643.05 643.05 Basis of Payment.
Page 591 and 592:
644.04 Ensure that the applicator p
Page 593 and 594:
644 Foot or Square Foot Removal of
Page 595 and 596:
646.07 Basis of Payment 589 646.01
Page 597 and 598:
591 646.04 Perform operations in su
Page 599 and 600:
B. The marking has cyclical soft sp
Page 601 and 602:
595 647.05 process of material appl
Page 603 and 604:
597 652.04 652.04 Basis of Payment.
Page 605 and 606:
599 656.02 prunings, rubbish, stump
Page 607 and 608:
601 657.07 657.07 Pipe Drains. Drai
Page 609 and 610:
659.18 Maintenance 659.19 Mowing 65
Page 611 and 612:
605 659.04 with the Liquid Lime man
Page 613 and 614:
C. A statement of the purity and ge
Page 615 and 616:
Weight per Area Mix Type lb kg Clas
Page 617 and 618:
611 659.11 659.11 Placing Topsoil.
Page 619 and 620:
659.17 may also mix the grass seed
Page 621 and 622:
615 660.01 The Department will pay
Page 623 and 624:
617 664.05 Immediately before placi
Page 625 and 626:
619 661.03 current edition of the A
Page 627 and 628:
Locate Seedlings, Groundcovers, Vin
Page 629 and 630:
623 662.02 662.02 Watering. Furnish
Page 631 and 632:
670.05 Method of Measurement 670.06
Page 633 and 634:
627 671.04 4. Place upgrade slots a
Page 635 and 636:
700 MATERIAL DETAILS 700 MINIMUM RE
Page 637 and 638:
631 700.00 Spec No. Material Materi
Page 639 and 640:
633 700.00 Spec No. Material Materi
Page 641 and 642:
635 700.00 Spec No. Material Materi
Page 643 and 644:
637 700.00 Spec No. Material Materi
Page 645 and 646:
639 700.00 Spec No. Material Materi
Page 647 and 648:
641 700.00 Spec No. Material Materi
Page 649 and 650:
643 700.00 Spec No. Material Materi
Page 651 and 652:
645 700.00 Spec No. Material Materi
Page 653 and 654:
647 700.00 Spec No. Material Materi
Page 655 and 656:
649 700.00 Spec No. Material Materi
Page 657 and 658:
651 700.00 Spec No. Material Materi
Page 659 and 660:
653 700.00 Spec No. Material Materi
Page 661 and 662:
655 700.00 Spec No. Material Materi
Page 663 and 664:
657 700.00 Spec No. Material Materi
Page 665 and 666:
702 ASPHALT MATERIAL 702.00 Accepta
Page 667 and 668:
661 702.01 the asphalt concrete mix
Page 669 and 670:
663 702.06 702.06 Asphalt for Water
Page 671 and 672:
Penetration @ 77 °F (25 °C)., 100
Page 673 and 674:
Length, ...........................
Page 675 and 676:
Sodium sulfate soundness test, 5 cy
Page 677 and 678:
671 703.01
Page 679 and 680:
2. Physical properties. Percent of
Page 681 and 682:
Deleterious substances shall not ex
Page 683 and 684:
703.07 Mineral Filler. 677 703.07 A
Page 685 and 686:
B. Structural Backfill Type 2. 679
Page 687 and 688:
681 703.14 moisture. Ensure that th
Page 689 and 690:
683 703.1� 2. When using BOF or E
Page 691 and 692:
A. Furnish CCS, crushed gravel, cru
Page 693 and 694:
Furnish materials for Item 617 acco
Page 695 and 696:
689 704.01 2. Type B material has a
Page 697 and 698:
691 705.10 Furnish materials accord
Page 699 and 700:
Test Description Bond Strength (dry
Page 701 and 702:
1. Ensure that the material meets t
Page 703 and 704:
697 705.24 Furnish the test data, a
Page 705 and 706:
3. 1 Pint non-absorbent container 4
Page 707 and 708:
6.3 Provide aggregate conforming to
Page 709 and 710:
Illustrative Example of S-Stirrup S
Page 711 and 712:
705 706.02 2. When it has been esta
Page 713 and 714:
0.3 mm Crack D-Load 65.0 Ultimate S
Page 715 and 716:
0.01-inch Crack D-Load 3000 Ultimat
Page 717 and 718:
711 706.03 with elliptical reinforc
Page 719 and 720:
706.05 class. Ensure that the marki
Page 721 and 722:
706.05 1. All structural design acc
Page 723 and 724:
717 706.05 handling strengths, then
Page 725 and 726:
719 706.05 The manufacturer may be
Page 727 and 728:
721 706.05 The spacing center-to-ce
Page 729 and 730:
723 706.06 12.0 Make repairs accord
Page 731 and 732:
725 706.12 Furnish materials accord
Page 733 and 734:
727 707.01 8.1.2. Ensure that the m
Page 735 and 736:
729 707.02 annular corrugation that
Page 737 and 738:
731 707.10 707.10 Square and Rectan
Page 739 and 740:
733 707.13 9.3 A bell and spigot jo
Page 741 and 742:
197M. Pipe Pipe-Arch Diameter Wall
Page 743 and 744:
737 707.25 7.5.1 Reroll the ends of
Page 745 and 746:
739 707.41 7.4 When tested in accor
Page 747 and 748:
9.1 Perform inspection at the proje
Page 749 and 750:
743 708.02 g. Pot life. SSPC-Paint
Page 751 and 752:
745 708.02 36M hot rolled steel. Bl
Page 753 and 754:
747 709.01 775, Section 11, permiss
Page 755 and 756:
749 710.01 in round column and dril
Page 757 and 758:
751 710.03 TABLE 710.03-1 STEEL POS
Page 759 and 760:
753 710.03 plunger bar of the latch
Page 761 and 762:
710.12 Furnish steel line posts acc
Page 763 and 764:
757 711.04 ASTM A 328/A 328M. Furni
Page 765 and 766:
759 711.13 17 Ship test bars with t
Page 767 and 768:
761 711.23 18.7.4.5, and 18.10.3. I
Page 769 and 770:
763 711.27 Air-dry or kiln-dry timb
Page 771 and 772:
Total calcium and magnesium oxides
Page 773 and 774:
Type A: Underdrains and Slope Drain
Page 775 and 776:
769 712.11 5. A netting weight of a
Page 777 and 778:
771 712.11 2. Excelsior cut from wo
Page 779 and 780:
773 721.02 Furnish materials accord
Page 781 and 782:
775 725.07 725.07 Plastic Pull Boxe
Page 783 and 784:
TABLE 725. 11-3 ANSI WATTS Horizont
Page 785 and 786:
779 725.11 Ensure that the luminair
Page 787 and 788:
781 725.15 Ensure that the box and
Page 789 and 790:
783 725.19 E. Photoelectric Cell. E
Page 791 and 792:
785 725.21 Luminaires and Traffic S
Page 793 and 794:
787 725.21 and bears easily found a
Page 795 and 796:
789 725.21 designed to develop a co
Page 797 and 798:
730.01 which has been drilled and t
Page 799 and 800:
793 730.05 730.05 Handhole Covers.
Page 801 and 802:
795 730.19 730.192 Reflective Sheet
Page 803 and 804:
797 731.07 60 times per minute with
Page 805 and 806:
Furnish a visor with each signal se
Page 807 and 808:
801 732.04 percent humidity. Operat
Page 809 and 810:
803 732.04 q. The module shall be d
Page 811 and 812:
805 732.04 period of 60 months, ove
Page 813 and 814:
807 732.05 The LED signal lamp unit
Page 815 and 816:
809 732.06 Furnish materials accord
Page 817 and 818:
811 732.08 B. NEMA TS-2. Furnish lo
Page 819 and 820:
813 732.15 expanding or screw type
Page 821 and 822:
Cable or Wire Number of Conductors
Page 823 and 824:
817 733.02 1. NEMA 8 phase, dual ri
Page 825 and 826:
733.03 Model 2070-3B Front Panel, D
Page 827 and 828:
821 733.03 hardware and equipment f
Page 829 and 830:
823 733.03 withstand a peak current
Page 831 and 832:
825 733.03 l. Terminal Blocks. Furn
Page 833 and 834:
827 733.03 (7) Furnish loop detecto
Page 835 and 836:
829 733.03 c. Install red monitor c
Page 837 and 838:
light to display. 831 733.03 (c) En
Page 839 and 840:
733.03 circuits, yellow timing, mul
Page 841 and 842:
733.03 (h) MULT IND. Illuminates wh
Page 843 and 844:
837 733.03 Watchdog Timer, 24VDC, C
Page 845 and 846:
(l) Event logs 839 733.03 (5) Furni
Page 847 and 848:
733.05 A. Cabinet Riser for NEMA Ca
Page 849 and 850:
843 733.06 b. Time of day/day of we
Page 851 and 852:
3. Modem 4. Printer 5. Accessory It
Page 853 and 854:
847 740.01 Furnish two (2) sets of
Page 855 and 856:
849 740.03 Minimum Maximum 1. Consi
Page 857 and 858:
H. Color. 851 740.05 Minimum Maximu
Page 859 and 860:
853 740.08 Allow samples to cure at
Page 861 and 862:
855 748.00 Roundness (Percent by We
Page 863 and 864:
Pipe Diameter Wall Thickness Wall T
Page 865 and 866:
859 748.15 or threads. Furnish nozz
Page 867 and 868:
Award, 5, 16 Cancellation of, 16 Of
Page 869 and 870:
Clearances, reinforcing steel, 307
Page 871 and 872:
Control of work, 24 Controller (see
Page 873 and 874:
Retaining walls, 466 Execution of c
Page 875:
81, 82, 582, 593 Authority and duti
Page 879 and 880:
Metallic coated, 727, 730 Metric eq
Page 881 and 882:
Contents, 11 Delivery of, 14 Guaran
Page 883 and 884:
691 Sheet piling left in place Mate
Page 885 and 886:
Screw threads, 355 Sheet piling, 75
Page 887 and 888:
Pedestrian signal lamps, 800 Perfor
Page 889:
Working drawings, plans and, 24 Wor
NEMA TS-2, 805, 811, 816, 818, 819,<br />
820, 827<br />
NEMA, TS-1, TS-2, cabinet <strong>and</strong><br />
controller, 810<br />
Neoprene elastomer bearings, 762<br />
No waiver or legal rights, 46<br />
Nondestructive testing, 356<br />
Non-reflective sheeting, sign, 796<br />
Non-reinforced concrete pipe, 430,<br />
431, 432, 701<br />
Nuts, high-strength, 350<br />
<strong>Ohio</strong> Manual <strong>of</strong> Uniform Traffic<br />
Control Devices, 3, 471<br />
Oiling forms, 306<br />
Opening project to traffic, 44<br />
Operations, pavement markings, 483<br />
Optically programmed signal lamps,<br />
799<br />
Outlets, precast reinforced concrete,<br />
726<br />
Outlets, underdrain, 450<br />
Overpass structure mounted sign<br />
supports, 521<br />
Paint, 149, 398, 544, 546, 624, 642,<br />
657, 700, 733, 743, 744, 745, 799,<br />
808, 810<br />
Aluminum, 746<br />
Blue-green vinyl finish coat, 754<br />
Inorganic zinc silicate primer, 743,<br />
759<br />
<strong>Material</strong>, 744<br />
Structural steel prime, 743<br />
Painting, structural steel, 343<br />
Panels, flashing arrows, 484<br />
Parking lot stall markings, 575, 576<br />
Partial depth pavement repair, 139<br />
Area to be replaced, 139<br />
Placement <strong>of</strong> asphalt concrete, 139<br />
Patching concrete structures, 401<br />
Placing, finishing, <strong>and</strong> curing, 402<br />
Preparation <strong>of</strong> surface, 402<br />
Removal <strong>of</strong> disintegrated concrete,<br />
401<br />
Patented devices, materials, <strong>and</strong><br />
processes, 36<br />
Paved gutter, 424, 425<br />
Pavement, 139, 140, 141, 143, 144,<br />
148, 151, 166, 168, 201, 253, 266,<br />
486, 495, 572, 581, 583, 587, 588,<br />
594, 772<br />
871<br />
Marking, 474, 573<br />
Preformed fillers, 395, 398<br />
Preparation for marking, 573<br />
Removal, 142<br />
Repair, 139<br />
Rigid, 276<br />
Pavement (see Pavement, Portl<strong>and</strong><br />
Cement Concrete), 266<br />
Pavement deficiency<br />
Pavement incidentals, 691<br />
Pavement Markings, 470, 474, 476,<br />
483, 484, 572, 577, 847<br />
Application, 573, 575, 581, 582,<br />
584, 585, 587, 588, 589, 590,<br />
592, 594, 595<br />
Center lines, 576<br />
Channelizing lines, 576<br />
Curb <strong>and</strong> isl<strong>and</strong> marking, 576<br />
Deduction for deficiency, 577<br />
Dotted lines, 576<br />
Edge types, 576<br />
Equipment, 575, 577, 581, 583,<br />
584, 587, 588, 589, 590, 593,<br />
594<br />
Glass Beads, 475, 476, 581, 657,<br />
853<br />
Lane arrows, 576<br />
Lane lines, 482, 576<br />
Layout <strong>and</strong> premarking, 575<br />
Line placement tolerance, 575<br />
Long lines, 576<br />
Maintained, 474<br />
Marking types, 575<br />
<strong>Material</strong>s, 572, 847<br />
Operations, 483<br />
Parking lot stall marking, 576<br />
Pavement preparation, 575<br />
Polyester, 581, 629, 657, 848<br />
Preformed, 851<br />
Removal, 577<br />
Stop <strong>and</strong> crosswalk lines, 576<br />
Symbol marking, 576<br />
Thermoplastic, 583, 585, 586, 657,<br />
850<br />
Traffic paint, 586<br />
Transverse lines, 576<br />
Two way radio communications,<br />
576<br />
Words on pavement, 576<br />
Work zone, 474