05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Concrete Incidentals<br />

Air entraining admixture, 692<br />

Burlap cloth, 691<br />

Chemical admixtures, 385, 692<br />

Hot applied crack <strong>and</strong> joint sealer,<br />

691<br />

Liquid compounds for curing<br />

concrete, 691<br />

Nonshrink mortar, 426, 697<br />

Preformed elastomeric compression<br />

seals, 692<br />

Preformed fillers, 395, 398, 691<br />

Quick setting concrete mortar, 148,<br />

695, 697, 698<br />

Sheet materials for concrete curing,<br />

691<br />

Type 3 membrane primer, 328, 691<br />

Concrete Pavement Incidentals, 691<br />

Concrete, General, 267<br />

Admixtures, 268,269, 272, 276, 277<br />

280, 314, 637, 692<br />

Batching plants, 277<br />

Classes for rigid replacement, 276,<br />

277<br />

Concrete beams, 281<br />

Curing <strong>and</strong> curing agents, 319, 321,<br />

500, 691<br />

Cylinders, 314<br />

Equipment, 277, 386<br />

Finish, 500<br />

Fly ash, 267,273, 276, 279, 280,<br />

468<br />

Ground granulated blast furnace<br />

slag, 279, 280<br />

H<strong>and</strong>ling, measuring, <strong>and</strong> batching,<br />

278<br />

Joints, 499<br />

<strong>Material</strong>s, 267<br />

Mixers, 278<br />

Mixing, 280<br />

Opening to traffic, 277<br />

Options, proportioning, 273<br />

Proportioning, 267, 268, 273, 274,<br />

275, 467<br />

Retempering, 281<br />

Slump, 268, 313, 315<br />

St<strong>and</strong>ard mix design, 273<br />

St<strong>and</strong>ard mix design for concrete<br />

paving, 273<br />

Superplasticizers, 279<br />

864<br />

Test specimens,314, 740<br />

Water reducer, 279<br />

Conduit, 429, 433, 436, 437, 443, 444,<br />

451, 469, 516, 517, 533, 538, 539,<br />

544, 549, 550, 552, 649, 650, 651,<br />

654, 655, 775, 783, 785, 798, 813<br />

Flexible for lighting, 798<br />

Pipe, drainage, 431<br />

Riser, for traffic signal, 544, 813<br />

Sign lighting, <strong>and</strong> electrical signs,<br />

533<br />

Steel, aluminum <strong>and</strong> plastic, 727<br />

Conflict monitor, 547, 819, 821<br />

Conformity, 8, 25<br />

With plans <strong>and</strong> specifications, 25<br />

Consideration <strong>of</strong> proposals, 15<br />

<strong>Construction</strong><br />

Maintenance during, 28<br />

<strong>Construction</strong> joints, concrete, 266, 325<br />

<strong>Construction</strong> meeting, post, 57<br />

Contents <strong>of</strong> bidding documents, 11<br />

Contract<br />

Award <strong>of</strong>, 16<br />

Bond, requirement, 16<br />

Cancellation <strong>of</strong>, 16<br />

Execution <strong>of</strong>, 16<br />

Failure to execute, 16<br />

Intent <strong>of</strong>, 16<br />

Liquidated damages, 16<br />

Subletting <strong>of</strong>, 48<br />

Termination <strong>of</strong>, 56<br />

Contraction joints, 266, 500<br />

Contractor<br />

Control Charts, 236<br />

Cooperation <strong>of</strong>, 26<br />

Coordination between, 27<br />

Responsibilities for damage claims<br />

<strong>and</strong> liability insurance, 41<br />

Responsibilities for utilities, 45<br />

Responsibilities for work, 44<br />

Termination <strong>of</strong> responsibility, 80<br />

Contractor mix design <strong>and</strong> quality<br />

control, asphalt<br />

Concrete, 157<br />

Contractor personnel requirements<br />

Sign lighting, 533<br />

Signal controller, 551<br />

Contractor’s personnel requirements<br />

Traffic signals, 538<br />

Control <strong>of</strong> material, 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!