05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Modem<br />

4. Printer<br />

5. Accessory Items<br />

845<br />

733.08<br />

F. System Functional Requirements. The system s<strong>of</strong>tware provides a<br />

simplified user friendly, color menu format at the Remote Monitoring Station.<br />

Ensure that no special computer programming skills are required for the user to<br />

fully access <strong>and</strong> operate this control <strong>and</strong> monitoring system.<br />

1. Graphical Representation. Furnish system s<strong>of</strong>tware that enables the<br />

operator to display in color, the vehicular signals, pedestrian signals, <strong>and</strong> detector<br />

actuations in a real time mode. Ensure that the user is able to construct an<br />

intersection layout graphically by using predetermined intersection shapes.<br />

2. System Capacity. Furnish a Remote Monitoring Station s<strong>of</strong>tware that<br />

has the capacity to monitor <strong>and</strong> control at least 24 traffic responsive masters.<br />

Ensure that the central s<strong>of</strong>tware is also capable <strong>of</strong> monitoring <strong>and</strong> controlling<br />

isolated system controllers.<br />

Furnish a system s<strong>of</strong>tware that has the capability to manually select any<br />

timing plan, free mode or flash mode.<br />

Ensure that the system s<strong>of</strong>tware has the capability <strong>of</strong> accepting,<br />

formatting, <strong>and</strong> processing data from at least 32 system detectors from each master<br />

controller.<br />

3. Data Transfer. Ensure that it is possible to upload/download the<br />

signal timing database, including coordination, <strong>and</strong> preemption settings, between<br />

the Remote Monitoring Station <strong>and</strong> the master controller or local intersection.<br />

Furnish a Remote Monitoring Station that provides a means to compare<br />

a currently uploaded timing database with a previously developed database stored<br />

in the Remote Monitoring Station memory. Ensure that it reports differences in<br />

the databases.<br />

During either uploading or downloading operations, ensure that the<br />

normal traffic control operations are not suspended.<br />

4. Security. Furnish a Remote Monitoring Station that provides for a user<br />

specified security code before any data is altered. Maintain controller access<br />

procedures from the Remote Monitoring Station allowing the user full security<br />

control <strong>of</strong> all system components from a remote location.<br />

5. Isolated Intersection Management. Furnish a Remote Monitoring<br />

Station s<strong>of</strong>tware that includes the capability <strong>of</strong> accessing system controllers at<br />

remote intersection locations. Ensure that this capability includes total access to<br />

controller timing parameters, alarm conditions, detector data, <strong>and</strong> intersection<br />

status conditions in real time without the use <strong>of</strong> a master controller. Ensure that<br />

this feature utilizes the local intersection controller with a dial-up modem <strong>and</strong><br />

telephone service.<br />

733.08 Telephone Service. Ensure that the telephone service is a st<strong>and</strong>ard<br />

dial-up service capable <strong>of</strong> supporting 2400 baud data transmission. Ensure that the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!