05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

817<br />

733.02<br />

1. NEMA 8 phase, dual ring capability with four pedestrian movements, 4<br />

overlaps, <strong>and</strong> the ability to program an exclusive pedestrian movement. Ensure<br />

that the controller is capable <strong>of</strong> being programmed for sequential phasing<br />

operation.<br />

2. Volume density functions<br />

3. Secondary coordination plans<br />

4. Time <strong>of</strong> day/day <strong>of</strong> week scheduler<br />

5. Time based coordination, minimum 3 dials, 3 <strong>of</strong>fsets, 3 splits<br />

6. Internal preemption for railroad <strong>and</strong> emergency vehicles<br />

7. Operator selectable single or dual entry in dual ring use<br />

8. Security access codes<br />

9. Detector features including delay timing, carryover (extension) timing<br />

<strong>and</strong> detector switching<br />

10. Simultaneous gap out feature<br />

11. If operated in a system, communication capabilities to interface with<br />

hardwired masters or dial up modems<br />

12. Data upload <strong>and</strong> download capability to a personal computer<br />

13. Storage <strong>of</strong> detector counts utilizing phase detectors for a minimum 24<br />

hour period in 15 minute increments<br />

14. Detector failure monitoring <strong>and</strong> logging features for constant calls <strong>and</strong><br />

absence <strong>of</strong> calls<br />

Furnish 60-month warranties or for the manufacturers’ st<strong>and</strong>ard warranty,<br />

whichever is greater for the following equipment:<br />

1. NEMA Controller Equipment<br />

a. TS-2 Controller Units<br />

b. Bus Interface Units<br />

c. Malfunction Management Units<br />

d. TS-1 Conflict Monitors<br />

2. CalTrans Controller Equipment<br />

a. Model <strong>2010</strong> Conflict Monitor Units<br />

b. 170E Controller Units including the following subassembly item:<br />

(1) CPU Board<br />

c. 2070L <strong>and</strong> 2070LC Controller Units including the following<br />

subassembly units:<br />

(1) 2070-1E CPU Board<br />

(2) 2070-2A Field I/O Module

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!