73<br />

109.05<br />

wage, submit payroll <strong>and</strong> equipment usage records according to 109.05.C.2 <strong>and</strong><br />

109.05.C.4.<br />

9. Pr<strong>of</strong>essional <strong>and</strong> Specialized Work. The following work, when<br />

performed by a firm hired by the Contractor, is paid at the reasonable <strong>and</strong> fair<br />

market invoiced cost plus a 5 percent mark up. The mark up is limited to $10,000<br />

for all the work performed by the firm.<br />

a. Surveying.<br />

b. Engineering design.<br />

c. Specialized work that is not normally part <strong>of</strong> a <strong>Department</strong><br />

Contract <strong>and</strong> is not normally subject to prevailing wage.<br />

d. Installation, periodic maintenance, <strong>and</strong> removal <strong>of</strong> traffic control<br />

devices under Item 614 performed by a traffic control service or rental company,<br />

provided the workers are not on the Project full-time. Maintenance <strong>of</strong> Traffic<br />

services performed by LEO.<br />

e. Other pr<strong>of</strong>essional or specialized work not contemplated at the<br />

time <strong>of</strong> Bid.<br />

Provide documentation showing payment for pr<strong>of</strong>essional <strong>and</strong> specialized<br />

Work.<br />

10. Payment for Force Account Work. Submit an analysis <strong>of</strong> estimated<br />

cost prepared in accordance with 109.05C for work that will be performed on a<br />

force account basis. Attach an original affidavit to the analysis stating:<br />

"Labor rates shown are the actual rates paid for labor, unit prices for<br />

materials <strong>and</strong> rates for owned <strong>and</strong> rented equipment have been estimated on the<br />

basis they are not in excess <strong>of</strong> those charged in the area in which the work will be<br />

performed."<br />

The Engineer will process an Estimated Cost <strong>of</strong> Force Account (ECFA) if the<br />

amount <strong>of</strong> the force account work is likely to be greater than $100,000 <strong>and</strong> is<br />

expected to take more than two weeks to complete. The Engineer will process an<br />

Actual Cost <strong>of</strong> Force Account (ACFA) to make any necessary adjustment between<br />

the ECFA <strong>and</strong> the final itemized costs for the force account work.<br />

For force account work estimated to be less than $100,000 <strong>and</strong> anticipated to<br />

require less than two weeks to perform, the Engineer will process an Actual Cost<br />

<strong>of</strong> Force Account (ACFA) at the conclusion <strong>of</strong> the work.<br />

Submit biweekly itemized statement <strong>of</strong> costs prepared from the Daily Force<br />

Account Records to the Engineer as the work is being performed. The Engineer<br />

will process estimates as the force account work is performed. Payment will only<br />

be made upon receipt <strong>of</strong> the Contractor’s itemized statement <strong>of</strong> costs.<br />

Upon conclusion <strong>of</strong> the work performed by an ECFA or work performed by<br />

an ACFA submit an itemized statement <strong>of</strong> the actual costs prepared from the Daily<br />

Force Account Record <strong>and</strong> utilizing the <strong>Department</strong>’s electronic template titled<br />

“Electronic Force Account.” Submit a compact disk (CD), labeled with the<br />

contractor’s name <strong>and</strong> the project number, <strong>and</strong> a hard copy <strong>of</strong> the “Electronic