05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

737<br />

707.25<br />

7.5.1 Reroll the ends <strong>of</strong> the individual pipe sections to form at least two<br />

annular corrugations on each end.<br />

8.1.2 Ensure that the minimum wall thickness <strong>of</strong> aluminum pipe is as<br />

follows:<br />

Pipe<br />

Diameter Wall Thickness Diameter Wall Thickness<br />

(in) (in) (mm) (mm)<br />

18 0.060 450 1.52<br />

21 0.060 525 1.52<br />

24 0.060 600 1.52<br />

30 0.060 750 1.52<br />

36 0.075 900 1.91<br />

42 0.105 1050 2.67<br />

48 0.105 1200 2.67<br />

54 0.105 1350 2.67<br />

60 0.135 1500 3.43<br />

66 0.135 1650 3.43<br />

9.1 Coupling b<strong>and</strong>s shall have annular corrugations.<br />

9.2 Coupling b<strong>and</strong>s shall conform to 707.21.<br />

14.1 Ensure that the certification <strong>and</strong> sampling conforms to 707.21.<br />

707.25 Corrugated Aluminum Box Culverts. Provide corrugated aluminum<br />

box culverts according to ASTM B 864/B 864M.<br />

Ensure that all manufacturers are pre-approved. Ensure that manufacturers not<br />

pre-approved submit a structural design criteria <strong>and</strong> analysis method to the<br />

<strong>Department</strong> before the project letting for approval. The <strong>Department</strong> maintains a<br />

list <strong>of</strong> all pre-approved manufacturers.<br />

Ensure that the manufacturer submits shop drawings <strong>and</strong> design calculations for<br />

review <strong>and</strong> written approval before manufacture. Submit a minimum <strong>of</strong> seven<br />

copies <strong>of</strong> the drawings. Allow a minimum <strong>of</strong> four weeks for approval. Ensure that<br />

the shop drawings include the following:<br />

A. All structural design <strong>and</strong> loading information.<br />

B. All material specifications.<br />

C. All plan view.<br />

D. All elevation view.<br />

E. All headwall <strong>and</strong> wingwall attachment requirements.<br />

F. All dimensions.<br />

G. All maintenance <strong>of</strong> traffic phases.<br />

H. All plate size <strong>and</strong> dimensions.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!