711<br />

706.03<br />

with elliptical reinforcement with the symbol “E”. Mark pipe with deformed wire<br />

reinforcement required in the design with the symbol “DF”.<br />

706.03 Reinforced Concrete Pipe, Epoxy Coated. Provide Type A<br />

reinforced concrete epoxy coated pipe conforming to 706.02 <strong>and</strong> Type B<br />

conforming to 706.04, with the following modification:<br />

In the plant, prepare the interior barrel <strong>and</strong> joint surface areas <strong>of</strong> the concrete<br />

pipe to remove all forms <strong>of</strong> oil, laitance, <strong>and</strong> other deleterious materials <strong>and</strong> then<br />

line them with a high-build, polyamide-cured, two-component coal tar epoxy<br />

coating, Military Specification DOD-P-23236A (SH). Spray the lining compound<br />

to obtain a continuous <strong>and</strong> relatively uniform <strong>and</strong> smooth lining with a minimum<br />

dry film thickness <strong>of</strong> 0.03 inch (760 µm). Ensure that all coated pipe are free <strong>of</strong><br />

surface irregularities such as air bubbles, delamination, lumping, sagging,<br />

blistering, pinholing, or porosity, in the coating film.<br />

706.04 Reinforced Concrete Elliptical Culvert, Storm Drain, <strong>and</strong> Sewer<br />

Pipe. Provide reinforced concrete elliptical culvert, storm drain, <strong>and</strong> sewer pipe<br />

conforming to ASTM C 507 (ASTM C 507M), with the following modifications:<br />

4.1 Delete Class HE-A. Table 706.04-1 includes additional design<br />

requirements.<br />

5.1 All materials, processes <strong>of</strong> manufacture, <strong>and</strong> finished pipe are subject to<br />

inspection <strong>and</strong> approval by the <strong>Department</strong>. When directed by the Laboratory, the<br />

manufacturer will cut holes in sections <strong>of</strong> the finished pipe for inspection.<br />

6.2.1 Provide cement according to 701, except 701.07.<br />

6.2.2 Provide fly ash according to 701.<br />

6.3 Provide aggregates conforming to the quality requirements <strong>of</strong> 703.02.<br />

6.5 Provide steel according 709.08, 709.10, 709.11, or 709.12.<br />

7.2 In addition, manufacture horizontal elliptical pipe HE-II <strong>and</strong> HE-III<br />

using the design requirements <strong>of</strong> Table 706.04-1.<br />

8.1 In addition, ensure that pipe made in accordance with 706.04-1 has three<br />

lines <strong>of</strong> reinforcement <strong>of</strong> elliptical shape. Place the outer <strong>and</strong> inner lines <strong>of</strong><br />

reinforcement so that the nominal protective covering <strong>of</strong> the concrete over the<br />

reinforcement in the barrel <strong>of</strong> the pipe is 1 inch (25 mm) subject to the variations<br />

permitted in Section 12.5. Ensure that the third or middle line is in contact with<br />

<strong>and</strong> fastened securely to the inner line at the vertical axis <strong>of</strong> the pipe both top <strong>and</strong><br />

bottom <strong>and</strong> to the outer line at the horizontal axis on both sides. Ensure that the<br />

length <strong>of</strong> the middle line is the average <strong>of</strong> the length <strong>of</strong> the inner <strong>and</strong> outer line.<br />

Ensure that the middle line is <strong>of</strong> an elliptical shape <strong>and</strong> runs smoothly between the<br />

specified points <strong>of</strong> contact with the inner <strong>and</strong> outer lines.<br />

10 Ensure that no more than two holes are cast, drilled, or otherwise neatly<br />

made in the shell <strong>of</strong> each piece <strong>of</strong> pipe for the purpose <strong>of</strong> h<strong>and</strong>ling or laying.<br />

Taper the holes unless drilled, <strong>and</strong> before backfilling, fill the tapered holes with<br />

portl<strong>and</strong> cement mortar, or secure the precast concrete plugs with portl<strong>and</strong> cement<br />

mortar. Fill the drilled holes with portl<strong>and</strong> cement mortar.