05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

703.1�<br />

Furnish OH, BOF, <strong>and</strong> EAF slag according to 703.14<br />

Use ACBFS according to Supplement 1027.<br />

Furnish GS according to 703.08.<br />

A. Gradations. Furnish for Items 617, 410, <strong>and</strong> 411 RACP materials according<br />

to the following gradation:<br />

Sieve Size Total Percent Passing<br />

1 1/2 inch(37.5 mm) 100<br />

3/4 inch (19.0 mm) 80 to 100<br />

3/8 inch (9.5 mm) 60 to 90<br />

No. 4 (4.75 mm) 30 to 90<br />

No. 30 (600 µm) 3 to 20<br />

Except for GS <strong>and</strong> RACP, use the following gradations for Items 410, 411,<br />

<strong>and</strong> 617.<br />

Furnish materials for Item 410 according to one <strong>of</strong> the following gradations:<br />

Type A Type B Type C<br />

Sieve Size<br />

Total Percent Passing<br />

1 1/2 inch(37.5 mm)<br />

1 inch (25.0 mm)<br />

100<br />

90 to 100<br />

100 Size<br />

75 to 100 No. 4 or 57<br />

3/4 inch (19.0 mm) 60 to 100 60 to 100 from<br />

3/8 inch (9.5 mm) 40 to 60 35 to 75 Table<br />

No. 4 (4.75 mm) 15 to 30 30 to 60 703.01-1<br />

Do not use RACP for Type C material.<br />

Furnish materials for Item 411 according to the following gradation:<br />

Sieve Size Total Percent Passing<br />

1 1/2 inch(37.5 mm) 100<br />

1 inch (25.0 mm) 75 to 100<br />

3/4 inch (19.0 mm) 60 to 100<br />

3/8 inch (9.5 mm) 35 to 75<br />

No. 4 (4.75 mm) 30 to 60<br />

No. 30 (600 µm) 7 to 30<br />

No. 200 (75 µm) 3 to 15<br />

686

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!