05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

703.07 Mineral Filler.<br />

677<br />

703.07<br />

A. Furnish mineral filler consisting <strong>of</strong> limestone dust, portl<strong>and</strong> cement, or other<br />

inert mineral matter. Ensure the mineral filler is thoroughly dry <strong>and</strong> free from<br />

lumps.<br />

B. Sieve analysis.<br />

703.08 Granulated Slag.<br />

Sieve Size Total Percent Passing<br />

No. 30 (600 µm) 100<br />

No. 50 (300 µm) 95 to 100<br />

No. 200 (75 µm) 65 to 100<br />

A. Furnish Granulated Slag (GS) consisting <strong>of</strong> glassy, granular materials formed<br />

when molten blast furnace slag or electric-furnace slag is rapidly chilled, as by<br />

immersion in water. The <strong>Department</strong> may reject material containing mill waste,<br />

cinders, large pieces <strong>of</strong> ungranulated slag, or other matter foreign to the production<br />

<strong>of</strong> slag in the normal operation <strong>of</strong> the blast furnace or electric furnace.<br />

Furnish material <strong>of</strong> such nature that it will compact to the satisfaction <strong>of</strong> the<br />

Engineer.<br />

B. Sieve analysis.<br />

703.10 Screenings.<br />

Sieve Size Total Percent Passing<br />

2 inch (50 mm) 100<br />

1 inch (25 mm) 85 to 100<br />

No. 100 (150 µm) 0 to 15<br />

A. Furnish screenings for No. 10 size gravel, stone, or ACBFS. Where crushed<br />

material is specified, ensure that it is crushed from material larger than the 1/2-inch<br />

(12.5 mm) sieve.<br />

B. Physical properties.<br />

Maximum<br />

Loss, sodium sulfate soundness test 15 %<br />

703.11 Structural Backfill for 603 Bedding <strong>and</strong> Backfill. Furnish structural<br />

backfill for 603 bedding <strong>and</strong> backfill consisting <strong>of</strong> CCS, gravel, natural s<strong>and</strong>, s<strong>and</strong><br />

manufactured from stone, foundry s<strong>and</strong>, ACBFS, GS, or RPCC.<br />

Furnish ACBF Slag according to Supplement 1027.<br />

Furnish granulated slag according to 703.08.<br />

Do not use GS for Type 3 Structural Backfill.<br />

The use <strong>of</strong> RPCC is permitted without wear testing or sodium soundness testing<br />

requirements if the Contractor provides information proving the material met this<br />

specification at the time <strong>of</strong> its original incorporation. The use <strong>of</strong> RPCC is not

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!