109.02 TABLE 109.02-1 ENGLISH TO SI (METRIC) CONVERSION FACTORS Symbol When You Know Length Multiply By To Find Symbol mil mils 25.4 micrometers µm in inches 25.4 millimeters mm ft feet 0.3048 meters m yd yards 0.9144 meters m mi Area miles 1.609347 kilometers km in 2 square inches 645.16 square millimeters mm 2 ft 2 square feet 0.09290304 square meters m 2 yd 2 square yards 0.8361274 square meters m 2 ac acres 0.4046873 hectares ha ac acres 4046.873 square meters m 2 mi 2 square miles 2.589998 square kilometers km 2 Volume fl oz fluid ounces 29.57353 milliliters mL gal gallons 3.785412 liters L ft 3 cubic feet 0.02831685 cubic meters m 3 yd 3 cubic yards 0.7645549 cubic meters m 3 Mass oz ounces 28.34952 grams g lb pounds 0.4535924 kilograms kg T 2000 pounds 0.9071847 metric tons t Temperature ºF Fahrenheit C = (F- 32)/1.8 Celsius ºC Illumination fc foot-candles 10.76391 lux lx fl foot-lamberts 3.426259 candelas per square meter cd/m 2 Force and Pressure or Stress lbf⋅ft pounds-force foot 1.355818 newton meter N⋅m lbf pounds force 4.448222 newtons N lbf/ft 2 pounds force per 47.88026 pascals Pa (psf) square foot lbf/in 2 pounds force per 0.006894757 megapascals MPa (psi) square inch 60
61 109.03 TABLE 109.02-2 SI (METRIC) TO ENGLISH CONVERSION FACTORS Symbol When You Know Length Multiply By To Find Symbol µm micrometers 0.03937 mils mil mm millimeters 0.03937 inches in m meters 3.28084 feet ft m meters 1.093613 yards yd km Area kilometers 0.62137 miles mi mm 2 square millimeters 0.00155 square inches in 2 m 2 square meters 10.76391 square feet ft 2 m 2 square meters 1.19599 square yards yd 2 ha hectares 2.4710437 acres ac m 2 square meters 0.000247 acres ac km 2 square kilometers 0.3861 square miles mi 2 Volume mL milliliters 0.033814 fluid ounces fl oz L liters 0.264172 gallons gal m 3 cubic meters 35.31466 cubic feet ft 3 m 3 cubic meters 1.30795 cubic yard yd 3 Mass g grams 0.035274 ounces oz kg kilograms 2.204622 pounds lb t metric tons 1.1023114 2000 pounds T Temperature ºC Celsius F = 1.8C + 32 Fahrenheit ºF Illumination lx lux 0.09290304 foot-candles fc cd/m 2 candelas per square meter 0.29186352 foot-lamberts fl Force and Pressure or Stress N⋅m newton meters 0.7375621 pounds-foot force lbf ft N newtons 0.22480892 pound force lbf Pa pascals 0.02088543 pounds force per lbf/ft square foot 2 (psf) MPa megapascals 145.03774 pounds force per lbf/in square inch 2 (psi) 109.03 Scope of Payment. Payment of the Contract Price is full compensation for all resources necessary to complete the Contract Item and maintain the Work. Assume liability for risk, loss, damage, or expense resulting from the Work. The
- Page 15 and 16: 9 101.03 Right-of-Way. A general te
- Page 17 and 18: 102 BIDDING REQUIREMENTS AND CONDIT
- Page 19 and 20: ENTITY SUBMITTING PROPOSAL REQUIRED
- Page 21 and 22: 15 102.15 B. The Bidder fails to fu
- Page 23 and 24: 104.02 Revisions to the Contract Do
- Page 25 and 26: 19 104.03 Work. The adjustment will
- Page 27 and 28: 21 104.05 Within seven (7) calendar
- Page 29 and 30: 23 104.05 d. References to the appl
- Page 31 and 32: 25 105.03 Work consists of repairs,
- Page 33 and 34: 27 105.08 105.08 Cooperation Betwee
- Page 35 and 36: 29 105.15 Maintain the previous cou
- Page 37 and 38: 105.18 Under the regulations cited
- Page 39 and 40: 33 106.03 request. Furnish the requ
- Page 41 and 42: C. Applications. 35 106.10 1. When
- Page 43 and 44: 37 107.06 Such inspections will not
- Page 45 and 46: 39 107.10 Section 4733-37-04, Measu
- Page 47 and 48: 41 107.12 B. Contractor’s Use of
- Page 49 and 50: 43 107.13 $5,000,000 and Each Occur
- Page 51 and 52: 45 107.16 as authorized by Change O
- Page 53 and 54: 47 107.19 beginning construction of
- Page 55 and 56: 108.02 The Director will calculate
- Page 57 and 58: 108.03 Items into component activit
- Page 59 and 60: 53 108.06 request in writing to the
- Page 61 and 62: 55 108.07 escalated labor and mater
- Page 63 and 64: 57 108.10 108.10 Payroll Records. K
- Page 65: 59 109.02 Thousand Board Feet, MBF
- Page 69 and 70: 1. Administration. 2. Superintenden
- Page 71 and 72: 65 109.05 g. If materials are taken
- Page 73 and 74: 67 109.05 charges. If the Contracto
- Page 75 and 76: 69 109.05 However, compensation for
- Page 77 and 78: 71 109.05 currently on the Project
- Page 79 and 80: 73 109.05 wage, submit payroll and
- Page 81 and 82: c. Proof of escalated cost for labo
- Page 83 and 84: 77 109.05 overhead provided the cri
- Page 85 and 86: 79 109.06 If the original material
- Page 87 and 88: 81 109.12 complete. Final Inspectio
- Page 89 and 90: 200 EARTHWORK ITEM 201 CLEARING AND
- Page 91 and 92: 202.01 Description 202.02 General C
- Page 93 and 94: 87 202.04 Where alteration of an ex
- Page 95 and 96: 89 202.08 ground surface. Break up
- Page 97 and 98: 91 202.14 removal or excavation, an
- Page 99 and 100: 93 203.03 F. Excavation. The excava
- Page 101 and 102: 95 203.04 c. Perform the tests on e
- Page 103 and 104: 97 203.06 granular material in a un
- Page 105 and 106: 99 203.07 6. Construct the other em
- Page 107 and 108: 101 203.09 the bottom of the ditch,
- Page 109 and 110: 103 203.10 If during excavation the
- Page 111 and 112: 105 204.03 Furnish geotextile fabri
- Page 113 and 114: 107 204.07 Operate equipment at a s
- Page 115 and 116: ITEM 205 CHEMICALLY STABILIZED EMBA
61<br />
109.03<br />
TABLE 109.02-2 SI (METRIC) TO ENGLISH CONVERSION FACTORS<br />
Symbol When You<br />
Know<br />
Length<br />
Multiply By To Find Symbol<br />
µm micrometers 0.03937 mils mil<br />
mm millimeters 0.03937 inches in<br />
m meters 3.28084 feet ft<br />
m meters 1.093613 yards yd<br />
km<br />
Area<br />
kilometers 0.62137 miles mi<br />
mm 2 square<br />
millimeters<br />
0.00155 square inches in 2<br />
m 2 square meters 10.76391 square feet ft 2<br />
m 2 square meters 1.19599 square yards yd 2<br />
ha hectares 2.4710437 acres ac<br />
m 2 square meters 0.000247 acres ac<br />
km 2 square<br />
kilometers<br />
0.3861 square miles mi 2<br />
Volume<br />
mL milliliters 0.033814 fluid ounces fl oz<br />
L liters 0.264172 gallons gal<br />
m 3 cubic meters 35.31466 cubic feet ft 3<br />
m 3 cubic meters 1.30795 cubic yard yd 3<br />
Mass<br />
g grams 0.035274 ounces oz<br />
kg kilograms 2.204622 pounds lb<br />
t metric tons 1.1023114 2000 pounds T<br />
Temperature<br />
ºC Celsius F = 1.8C +<br />
32<br />
Fahrenheit ºF<br />
Illumination<br />
lx lux 0.09290304 foot-c<strong>and</strong>les fc<br />
cd/m 2 c<strong>and</strong>elas per<br />
square meter<br />
0.29186352 foot-lamberts fl<br />
Force <strong>and</strong> Pressure or Stress<br />
N⋅m newton meters 0.7375621 pounds-foot force lbf ft<br />
N newtons 0.22480892 pound force lbf<br />
Pa pascals 0.02088543 pounds force per lbf/ft<br />
square foot<br />
2<br />
(psf)<br />
MPa megapascals 145.03774 pounds force per lbf/in<br />
square inch<br />
2<br />
(psi)<br />
109.03 Scope <strong>of</strong> Payment. Payment <strong>of</strong> the Contract Price is full compensation<br />
for all resources necessary to complete the Contract Item <strong>and</strong> maintain the Work.<br />
Assume liability for risk, loss, damage, or expense resulting from the Work. The