635<br />

700.00<br />

Spec No. <strong>Material</strong> <strong>Material</strong> only Inspection or Sampling<br />

Requirements<br />

Post Inspection Instructions<br />

703.11 Type Structural Backfill Assure materials provided by a supplier on the 60 to 70 lb. QC sample taken by<br />

3<br />

for 603 Bedding <strong>and</strong> Pre-Qualified Supplier List for S 1069 District lab at source a minimum<br />

Backfill from maintained by OMM.<br />

four (4) times per year.<br />

Certified Stock Document in CMS (Trns.port SiteManager ). No project sampling required<br />

except if project believes there is a<br />

problem with the material [either<br />

gradation or quality]<br />

703.11 Type Structural Backfill Assure materials provided by a supplier on the No additional project sampling<br />

3<br />

for 603 Bedding <strong>and</strong> Pre-Qualified Supplier List for S 1069 required for approved, sampled<br />

Backfill from Non- maintained by OMM.<br />

tonnage except if project believes<br />

Certified Stock 60 to 70 lb. QC sample taken from each 5200 there is a problem with the<br />

ton (4720 metric ton) stockpile, submitted to material [either gradation or<br />

OMM Aggregate Section.<br />

Document in CMS (Trns.port SiteManager ).<br />

Do not use until tested <strong>and</strong> approved.<br />

quality]<br />

703.13 Coarse Aggregate<br />

for Items 451 <strong>and</strong><br />

452<br />

703.14 Steel Slag Aggregate<br />

for Non-Pavement<br />

Use<br />

703.16 Suitable <strong>Material</strong>s<br />

for Embankment<br />

<strong>Construction</strong><br />

Modification<br />

required for<br />

703.16<br />

703.17 Dense Graded<br />

Aggregate for Item<br />

304 from Certified<br />

Stock<br />

703.17 Dense Graded<br />

Aggregate for Item<br />

304 from Non-<br />

Certified Stock<br />

703.18 Aggregate for Items<br />

410, 411, <strong>and</strong><br />

617from Certified<br />

Stock<br />

Assure materials provided by a supplier on the No project sampling required<br />

Pre-Qualified Supplier List for S 1069 except if project believes there is a<br />

maintained by OMM.<br />

problem with the material [either<br />

Assure materials are on the OMM Freeze Thaw gradation or quality]<br />

List<br />

Follow requirements <strong>of</strong> coarse aggregate<br />

703.02<br />

Document in CMS (Trns.port SiteManager ).<br />

Assure materials from a supplier on the Pre-<br />

Qualified Supplier List for S 1069 maintained<br />

by OMM.<br />

Stockpile <strong>and</strong> sample each 2500 tons (2300<br />

metric tons). Notify the District laboratory for<br />

inspection <strong>of</strong> sources <strong>and</strong> to obtain split<br />

samples. Test for expansion<br />

Multiple materials listed. Follow the<br />

requirements <strong>of</strong> the individual material<br />

specification<br />

No additional project sampling<br />

required for approved, sampled<br />

tonnage except if project believes<br />

there is a problem with the<br />

material [either gradation or<br />

quality]<br />

Follow the requirements <strong>of</strong> the<br />

individual material specification<br />

Products will be supplied by a supplier on the 90 to 100 lb. QC sample taken by<br />

Pre-Qualified Supplier List for S 1069 District lab at source a minimum<br />

maintained by OMM.<br />

four (2) times per year.<br />

Document in CMS (Trns.port SiteManager ). No project sampling required<br />

except if project believes there is a<br />

problem with the material [either<br />

gradation or quality]<br />

Products will be supplied by a supplier on the No additional project sampling<br />

Pre-Qualified Supplier List for S 1069 required for approved, sampled<br />

maintained by OMM.<br />

tonnage except if project believes<br />

90 to 100 lb. QC sample taken from each 5200 there is a problem with the<br />

ton (4720 metric ton) stockpile, submitted to material [either gradation or<br />

OMM Aggregate Section.<br />

Document in CMS (Trns.port SiteManager ).<br />

Do not use until tested <strong>and</strong> approved.<br />

quality]<br />

Products will be supplied by a supplier on the 90 to 100 lb. QC sample taken by<br />

Pre-Qualified Supplier List for S 1069 District lab at source a minimum<br />

maintained by OMM.<br />

four (4) times per year.<br />

Document in CMS (Trns.port SiteManager ). No project sampling required<br />

except if project believes there is a<br />

problem with the material [either<br />

gradation or quality]