700 MATERIAL DETAILS<br />

700 MINIMUM REQUIREMENTS FOR SAMPLING MATERIALS<br />

Spec No. <strong>Material</strong> <strong>Material</strong> only Inspection or Sampling<br />

Requirements<br />

Post Inspection Instructions<br />

203 Embankment Assure 203.02 Q <strong>and</strong> R materials conform to<br />

the individual material requirements. Sample<br />

materials when requested by the Engineer.<br />

<br />

Follow S 1015 for acceptance<br />

Plant: Test 1 sample in 4 days for verification.<br />

Observe other contractor QC sample <strong>and</strong> QC<br />

test 1 in 4 days.<br />

Plant: Conduct minimum monitoring<br />

requirements.<br />

629<br />

700.00<br />

258 Dowel Bar Retr<strong>of</strong>it<br />

Soil Embankment: 50 lb (23 kg)<br />

Granular Embankment: 50 lb (23 kg)<br />

Silicone Sealant– Obtain letter <strong>of</strong> certification<br />

stating that the material meets the requirements<br />

<strong>of</strong> item 258. <strong>Material</strong> to be shipped from<br />

manufacturer not more than 9 months prior to<br />

use.<br />

Dowel Bar grout - Verify br<strong>and</strong> name <strong>of</strong><br />

material is on QPL at the time <strong>of</strong> use.<br />

301 Asphalt Concrete Project: Visually inspect delivered loads <strong>and</strong> Project: Contact project Engineer/<br />

302 Base<br />

newly placed mat<br />

DCE/DET immediately if<br />

problems are seen<br />

305<br />

PC Concrete<br />

Pavement<br />

307 Non Stabilized<br />

Drainage Base<br />

308 Asphalt Treated Free<br />

Draining Base<br />

409 Sawing <strong>and</strong> Sealing<br />

Asphalt Concrete<br />

pavement Joints<br />

Make two 6"x6"x4' beams for every 7500 yd²<br />

(6500 m²) or fraction there<strong>of</strong> daily. Field test<br />

beams for required load for the specification.<br />

Report results in CMS (Trns.port SiteManager<br />

).<br />

Plant: Compare results per 403.<br />

Report on monitoring.<br />

Core samples taken every 2000 sq.<br />

yds by Contractor. Conform to S<br />

1064<br />

Provide samples conforming to 703.12 for Determine locations for thickness<br />

design verification. Provide in process samples tolerance checks according to S<br />

as directed by the Engineer. Sample material 1064.<br />

conforming to 703.12<br />

Provide a JMF to the Lab for approval. Include<br />

1 gal (4 L) sample <strong>of</strong> asphalt <strong>and</strong> 70 lb (32 kg)<br />

sample <strong>of</strong> aggregate<br />

Determine locations for thickness<br />

tolerance checks according to S<br />

1064.<br />

Assure backer rod is on QPL at the time <strong>of</strong> use. Notify District Testing if rejecting<br />

Inspect material for condition.<br />

material.<br />

Document in CMS (Trns.port SiteManager ). If material non-performs or looks<br />

defective during use notify District<br />

testing <strong>and</strong> OMM<br />

421 Micro Surfacing Project: Conduct a test strip per 421.09, inspect<br />

per 421.10 <strong>and</strong> accept per 421.11.<br />

422 Chip Seal with Project: Conduct a test strip per 422.05. Clean<br />

Polymer Binder the surface per 422.06. Verify binder <strong>and</strong><br />

aggregate application per 422.07 <strong>and</strong> 422.08.<br />

Ensure contractor quality control per 422.10.<br />

Verify all <strong>of</strong> 422.11 is met for acceptance.<br />

423 Fibers for Asphalt Verify type <strong>and</strong> br<strong>and</strong> name <strong>of</strong> material is on Notify District Testing if rejecting<br />

Concrete:<br />

QPL at the time <strong>of</strong> use.<br />

material.<br />

Polyester<br />

Document in CMS (Trns.port SiteManager ). If material non-performs or looks<br />

Propylene<br />

defective during use submit a use a<br />

Polypropylene<br />

1 quart sample to the Laboratory.<br />

424 Asphalt Concrete For Type A see 301,302 procedures. For Type<br />

(Fine Graded<br />

Polymer)<br />

B see 448 procedures.<br />

442 Asphalt Concrete Project <strong>and</strong> Plant: See requirements for 446 or<br />

448 as specified for the 442 item.<br />

443 Asphalt Concrete<br />

(Stone Mastic)<br />

See 446 requirements.