2010 Construction and Material Specifications - Ohio Department of ...
2010 Construction and Material Specifications - Ohio Department of ... 2010 Construction and Material Specifications - Ohio Department of ...
661.18 Replant as required according to the specifications of the original material. Replacement plants are subject to a new period of establishment. Immediately replace plants planted initially in the fall that have died before the spring planting season. Care for the replacement plants during the new establishment period. 661.18 Removal of Stakes and Wrapping. Remove all stakes and wrapping material from all plants just before the final inspection, with the exception of the replacement plantings that have not been in place for a full growing season. Take ownership of removed items. Use removed materials in the Work when the material conforms to the specifications; if not, then recycle or dispose of the material according to 105.16 and 105.17. 661.19 Method of Measurement. The Department will measure the number of plant materials of each species and size, completed and accepted, in place. 661.20 Basis of Payment. The Department will pay 50 percent of the bid price when delivered to the project site and the remaining 50 percent of the bid price when planted. At the end of the establishment period, the Department will make the final inspection and determine the actual number of living plants. The Department will pay an additional 20 percent of the bid price for all plants living at the end of the establishment period. The Department will not pay the additional 20 percent payment for plantings that did not survive the establishment period. Replace all plants not surviving the establishment period at no additional cost to the Department. The Department will extend the establishment period for all replacement plantings with no additional payment. The Department will pay for accepted quantities at the contract prices as follows: Item Unit Description 661 Each Tree Seedling, (Size), (Species) 661 Each Perennials, (Size), (Species) 661 Each Groundcover and Vines, (Size), (Species) 661 Each Deciduous Shrub, (Size), (Species) 661 Each Evergreen Shrub, (Size), (Species) 661 Each Deciduous Tree, (Size), (Species) 661 Each Evergreen Tree, (Size), (Species) ITEM 662 LANDSCAPE WATERING 662.01 Description 662.02 Watering 662.03 Method of Measurement 662.04 Basis of Payment 662.01 Description. This work consists of furnishing, delivering, applying, measuring, and scheduling a sufficient amount of water necessary to keep each plant included in Item 661 in a healthy growing condition throughout the period of establishment and the Contract. 622
623 662.02 662.02 Watering. Furnish the water used in watering landscape plants. Thoroughly water all plant material at the time of planting regardless of soil moisture content. Continue to water throughout the period of establishment. Saturate the root zone and mulched area of each plant without causing run-off according to Table 662.03-1. During fall planting, continue to water until the ground is frozen and recommence watering after the spring thaw. Furnish a rain gauge approved by the Engineer. 662.03 Method of Measurement. The Department will measure Landscape Watering by the number of gallons (liters) delivered to plants from approved metered tanks or individually measured containers as follows: TABLE 662.03-1 WATERING TABLE Plant Description Gallons (L) Shrubs: 12 to 36 inches (300 to 900 mm), height 4 (15) 36 inches to 5 feet (900 mm to 1.5 m), height 7 (25) Trees: 5 to 8 feet (1.5 to 2.5 m), height 15 (55) 2 to 3 inches (50 to 75 mm), caliper 25 (95) 3 to 4 inches (75 to 100 mm), caliper 30 (115) Greater than 4 inches (100 mm), caliper 35 (115) 662.04 Basis of Payment. The Department will pay for the accepted quantities at the contract price as follows: Item Unit Description 662 Gallon (Liter) Landscape Watering ITEM 666 PRUNING EXISTING TREES 666.01 Description 666.02 Wound Dressing 666.03 Pruning 666.04 Painting 666.05 Removal of Foreign Materials from Trees 666.06 Removal of Rubbish 666.07 Method of Measurement 666.08 Basis of Payment 666.01 Description. This work consists of pruning trees. 666.02 Wound Dressing. Use approved material specifically manufactured for tree wound dressing. 666.03 Pruning. Prune all trees to make them shapely, typical of the species, using standard drawings on the plans as a guide. Use approved pruning tools and methods.
- Page 577 and 578: 571 638.20 638 Foot (Meter) ___ inc
- Page 579 and 580: 573 641.03 641.03 General. Apply li
- Page 581 and 582: 575 641.05 At the end of the projec
- Page 583 and 584: 577 641.10 communication between th
- Page 585 and 586: Keep the paint thoroughly mixed dur
- Page 587 and 588: ITEM 643 POLYESTER PAVEMENT MARKING
- Page 589 and 590: 583 643.05 643.05 Basis of Payment.
- Page 591 and 592: 644.04 Ensure that the applicator p
- Page 593 and 594: 644 Foot or Square Foot Removal of
- Page 595 and 596: 646.07 Basis of Payment 589 646.01
- Page 597 and 598: 591 646.04 Perform operations in su
- Page 599 and 600: B. The marking has cyclical soft sp
- Page 601 and 602: 595 647.05 process of material appl
- Page 603 and 604: 597 652.04 652.04 Basis of Payment.
- Page 605 and 606: 599 656.02 prunings, rubbish, stump
- Page 607 and 608: 601 657.07 657.07 Pipe Drains. Drai
- Page 609 and 610: 659.18 Maintenance 659.19 Mowing 65
- Page 611 and 612: 605 659.04 with the Liquid Lime man
- Page 613 and 614: C. A statement of the purity and ge
- Page 615 and 616: Weight per Area Mix Type lb kg Clas
- Page 617 and 618: 611 659.11 659.11 Placing Topsoil.
- Page 619 and 620: 659.17 may also mix the grass seed
- Page 621 and 622: 615 660.01 The Department will pay
- Page 623 and 624: 617 664.05 Immediately before placi
- Page 625 and 626: 619 661.03 current edition of the A
- Page 627: Locate Seedlings, Groundcovers, Vin
- Page 631 and 632: 670.05 Method of Measurement 670.06
- Page 633 and 634: 627 671.04 4. Place upgrade slots a
- Page 635 and 636: 700 MATERIAL DETAILS 700 MINIMUM RE
- Page 637 and 638: 631 700.00 Spec No. Material Materi
- Page 639 and 640: 633 700.00 Spec No. Material Materi
- Page 641 and 642: 635 700.00 Spec No. Material Materi
- Page 643 and 644: 637 700.00 Spec No. Material Materi
- Page 645 and 646: 639 700.00 Spec No. Material Materi
- Page 647 and 648: 641 700.00 Spec No. Material Materi
- Page 649 and 650: 643 700.00 Spec No. Material Materi
- Page 651 and 652: 645 700.00 Spec No. Material Materi
- Page 653 and 654: 647 700.00 Spec No. Material Materi
- Page 655 and 656: 649 700.00 Spec No. Material Materi
- Page 657 and 658: 651 700.00 Spec No. Material Materi
- Page 659 and 660: 653 700.00 Spec No. Material Materi
- Page 661 and 662: 655 700.00 Spec No. Material Materi
- Page 663 and 664: 657 700.00 Spec No. Material Materi
- Page 665 and 666: 702 ASPHALT MATERIAL 702.00 Accepta
- Page 667 and 668: 661 702.01 the asphalt concrete mix
- Page 669 and 670: 663 702.06 702.06 Asphalt for Water
- Page 671 and 672: Penetration @ 77 °F (25 °C)., 100
- Page 673 and 674: Length, ...........................
- Page 675 and 676: Sodium sulfate soundness test, 5 cy
- Page 677 and 678: 671 703.01
661.18<br />
Replant as required according to the specifications <strong>of</strong> the original material.<br />
Replacement plants are subject to a new period <strong>of</strong> establishment. Immediately<br />
replace plants planted initially in the fall that have died before the spring planting<br />
season. Care for the replacement plants during the new establishment period.<br />
661.18 Removal <strong>of</strong> Stakes <strong>and</strong> Wrapping. Remove all stakes <strong>and</strong> wrapping<br />
material from all plants just before the final inspection, with the exception <strong>of</strong> the<br />
replacement plantings that have not been in place for a full growing season. Take<br />
ownership <strong>of</strong> removed items. Use removed materials in the Work when the<br />
material conforms to the specifications; if not, then recycle or dispose <strong>of</strong> the<br />
material according to 105.16 <strong>and</strong> 105.17.<br />
661.19 Method <strong>of</strong> Measurement. The <strong>Department</strong> will measure the number<br />
<strong>of</strong> plant materials <strong>of</strong> each species <strong>and</strong> size, completed <strong>and</strong> accepted, in place.<br />
661.20 Basis <strong>of</strong> Payment. The <strong>Department</strong> will pay 50 percent <strong>of</strong> the bid price<br />
when delivered to the project site <strong>and</strong> the remaining 50 percent <strong>of</strong> the bid price<br />
when planted.<br />
At the end <strong>of</strong> the establishment period, the <strong>Department</strong> will make the final<br />
inspection <strong>and</strong> determine the actual number <strong>of</strong> living plants. The <strong>Department</strong> will<br />
pay an additional 20 percent <strong>of</strong> the bid price for all plants living at the end <strong>of</strong> the<br />
establishment period. The <strong>Department</strong> will not pay the additional 20 percent<br />
payment for plantings that did not survive the establishment period. Replace all<br />
plants not surviving the establishment period at no additional cost to the<br />
<strong>Department</strong>. The <strong>Department</strong> will extend the establishment period for all<br />
replacement plantings with no additional payment.<br />
The <strong>Department</strong> will pay for accepted quantities at the contract prices as<br />
follows:<br />
Item Unit Description<br />
661 Each Tree Seedling, (Size), (Species)<br />
661 Each Perennials, (Size), (Species)<br />
661 Each Groundcover <strong>and</strong> Vines, (Size), (Species)<br />
661 Each Deciduous Shrub, (Size), (Species)<br />
661 Each Evergreen Shrub, (Size), (Species)<br />
661 Each Deciduous Tree, (Size), (Species)<br />
661 Each Evergreen Tree, (Size), (Species)<br />
ITEM 662 LANDSCAPE WATERING<br />
662.01 Description<br />
662.02 Watering<br />
662.03 Method <strong>of</strong> Measurement<br />
662.04 Basis <strong>of</strong> Payment<br />
662.01 Description. This work consists <strong>of</strong> furnishing, delivering, applying,<br />
measuring, <strong>and</strong> scheduling a sufficient amount <strong>of</strong> water necessary to keep each<br />
plant included in Item 661 in a healthy growing condition throughout the period <strong>of</strong><br />
establishment <strong>and</strong> the Contract.<br />
622