651.01<br />

650 ROADSIDES<br />

ITEM 651 TOPSOIL STOCKPILED<br />

651.01 Description<br />

651.02 <strong>Construction</strong> Requirements<br />

651.03 Method <strong>of</strong> Measurement<br />

651.04 Basis <strong>of</strong> Payment<br />

651.01 Description. This work consists <strong>of</strong> stripping topsoil from areas shown<br />

on the plans or from within the Right-<strong>of</strong>-Way limits, transporting, <strong>and</strong> stockpiling<br />

topsoil at locations shown on the plans or at locations elected by the Contractor<br />

with project approval.<br />

651.02 <strong>Construction</strong> Requirements. Remove all heavy grass, weeds, or other<br />

vegetation over the areas before stripping. Keep the topsoil separate from other<br />

excavated materials. Remove topsoil before beginning the regular excavation or<br />

embankment work in the area. The depth <strong>of</strong> stripping will be per the plans or per<br />

the Project Engineer.<br />

651.03 Method <strong>of</strong> Measurement. The <strong>Department</strong> will measure Topsoil<br />

Stockpiled by the number <strong>of</strong> cubic yards (cubic meters) completed <strong>and</strong> accepted,<br />

measured from the removal areas.<br />

651.04 Basis <strong>of</strong> Payment. The <strong>Department</strong> will not pay for any removal <strong>of</strong><br />

topsoil beyond the directed depth.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract price as follows:<br />

Item Unit Description<br />

651 Cubic Yard Topsoil Stockpiled<br />

(Cubic Meter)<br />

ITEM 652 PLACING STOCKPILED TOPSOIL<br />

652.01 Description<br />

652.02 <strong>Construction</strong> Requirements<br />

652.03 Method <strong>of</strong> Measurement<br />

652.04 Basis <strong>of</strong> Payment<br />

652.01 Description. This work consists <strong>of</strong> hauling <strong>and</strong> spreading topsoil from<br />

stockpiles <strong>and</strong> preparing the surface.<br />

652.02 <strong>Construction</strong> Requirements. Prepare the surface according to 653.03.<br />

Place <strong>and</strong> spread the topsoil according to 653.03.<br />

652.03 Method <strong>of</strong> Measurement. The <strong>Department</strong> will measure Placing<br />

Stockpiled Topsoil by the number <strong>of</strong> cubic yards (cubic meters) completed <strong>and</strong><br />