05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

638.02<br />

H. Joining to existing <strong>and</strong> proposed appurtenances as required in the project<br />

plans.<br />

I. Performing all necessary test (leakage test, disinfections, hydrostatic).<br />

J. Restoration <strong>of</strong> disturbed underground facilities.<br />

K. Constructing all required blocking <strong>and</strong> wedging <strong>and</strong>/or thrust blocking.<br />

L. Furnishing <strong>and</strong> installing all necessary restraining <strong>of</strong> joints <strong>and</strong> fittings.<br />

M. Cutting <strong>and</strong> plugging as required existing water mains to be ab<strong>and</strong>oned.<br />

Use removed or excavated materials in the Work when the material conforms to<br />

the specifications; if not, then recycle or dispose <strong>of</strong> the material according to<br />

105.16 <strong>and</strong> 105.17.<br />

638.02 <strong>Material</strong>s. Furnish materials conforming to:<br />

Pipe, joints, <strong>and</strong> fittings.<br />

Ductile iron pipe, joints, <strong>and</strong> fittings ...................... 748.01<br />

Polyvinyl chloride (PVC) pipe,<br />

joints, <strong>and</strong> fittings .............................................. 748.02<br />

Polyethylene (PE) service<br />

branches <strong>and</strong> fittings .......................................... 748.03<br />

Copper service branches <strong>and</strong> fittings ...................... 748.05<br />

Steel pipe encasement ............................................ 748.06<br />

Polyethylene encasement ....................................... 748.07<br />

Valves <strong>and</strong> equipment.<br />

Gate valve <strong>and</strong> valve box ....................................... 748.08<br />

Inserting valve <strong>and</strong> valve box ................................. 748.09<br />

Cutting-in sleeve, valve <strong>and</strong> valve box ................... 748.10<br />

Tapping sleeve, valve <strong>and</strong> valve box ...................... 748.11<br />

Tapping saddle <strong>and</strong> corporation stop ...................... 748.12<br />

Service stop <strong>and</strong> service box .................................. 748.13<br />

Meter, setting, stop <strong>and</strong> chamber ............................ 748.14<br />

Fire hydrant ............................................................ 748.15<br />

Miscellaneous.<br />

Granular <strong>Material</strong> ................................................... 605.02<br />

Disinfectant .......................................................... AWWA<br />

Pipe bedding .......................................................... 603.02<br />

Concrete, Class C ........................................... 499 <strong>and</strong> 511<br />

Soil <strong>and</strong> granular embankment ............................... 203.02<br />

Structural backfill, Types 1, 2, <strong>and</strong> 3 ...................... 703.11<br />

Mortar ......................................................................... 602<br />

The Engineer will allow Type 3 structural backfill, conforming to 703.11, to be<br />

used as bedding below the pipe only when pumping operations do not control<br />

severe ground water problems. Place at least 12 inches (300 mm) <strong>of</strong> Type 1<br />

structural backfill on top <strong>of</strong> the Type 3 structural backfill to prevent piping.<br />

562

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!