633.20<br />

adjacent paved areas. One complete Controller Work Pad unit may encompass<br />

several sides <strong>of</strong> a controller cabinet installation.<br />

The <strong>Department</strong> will measure Flasher Controller by the number <strong>of</strong> each<br />

complete flasher assembly with cabinet installed <strong>and</strong> tested.<br />

The <strong>Department</strong> will measure Controller, Master, Traffic Responsive by the<br />

number <strong>of</strong> each unit, <strong>and</strong> will include installation, signal system s<strong>of</strong>tware,<br />

programming, <strong>and</strong> any increase in cabinet size to house the master controller in the<br />

local intersection cabinet. The <strong>Department</strong> will measure Controller, Master,<br />

Traffic Responsive, Furnish Only by the number <strong>of</strong> each unit, <strong>and</strong> will include<br />

s<strong>of</strong>tware, but exclude any programming or installation.<br />

The <strong>Department</strong> will measure Remote Monitoring Station by the number <strong>of</strong><br />

each location shown on the plans, <strong>and</strong> will include all equipment, testing, <strong>and</strong><br />

s<strong>of</strong>tware.<br />

The <strong>Department</strong> will measure Telephone Service by the number <strong>of</strong> each<br />

location shown on the plans for furnishing telephone service to an intersection<br />

controller, <strong>and</strong> will include the modem, conduit, trenching, <strong>and</strong> wiring.<br />

The <strong>Department</strong> will measure Training on a lump sum basis, <strong>and</strong> will include<br />

providing the instruction materials, instructor travel expenses, <strong>and</strong> test or media<br />

equipment for presenting the training material.<br />

The <strong>Department</strong> will measure System Analysis on a lump sum basis, <strong>and</strong> will<br />

include providing all materials, labor, s<strong>of</strong>tware, printing reports, <strong>and</strong> incidentals to<br />

analyze all traffic responsive sub-systems included in the project.<br />

The <strong>Department</strong> will measure Uninterruptible Power Supply by the number <strong>of</strong><br />

each <strong>and</strong> will include all equipment, testing <strong>and</strong> certifications.<br />

633.20 Basis <strong>of</strong> Payment. If a project contains individual sub-systems that are<br />

connected to the remote monitoring station, the cost for performing work, as<br />

specified in 633.17 is incidental to the bid item price for System Analysis.<br />

The costs to obtain <strong>and</strong> maintain telephone service by the supply agency are<br />

included under Telephone Service.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract unit prices as<br />

follows:<br />

Item Unit Description<br />

633 Each Controller Unit, Type ___,<br />

with Cabinet, Type ___<br />

633 Each Controller Unit, Type ___<br />

633 Each Controller Unit, Type ___, Furnish Only<br />

633 Each Cabinet, Type ___<br />

633 Each Cabinet, Type ___, Furnish Only<br />

633 Each Cabinet Riser<br />

633 Each Cabinet Foundation<br />

633 Each Controller Work Pad<br />

633 Each Flasher Controller<br />

633 Each Controller, Master, Traffic Responsive<br />

560