05.01.2013 Views

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

2010 Construction and Material Specifications - Ohio Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

630.05<br />

FIGURE 1<br />

Sticker design:<br />

PROPERTY OF THE STATE OF OHIO<br />

UP TO $2500 FINE AND 5 YEARS<br />

IMPRISONMENT FOR DAMAGING<br />

OR REMOVING THIS SIGN<br />

OHIO REV. CODE SEC. 4511.17<br />

MANU ID * FAB. **<br />

EREC 1 2 3 4 5 6 7 8 9 10 11 12<br />

10 11 12 13 14 15 16 17<br />

*ID No. **Year <strong>of</strong> Manufacture<br />

Alternate design:<br />

PROPERTY OF THE STATE OF OHIO<br />

UP TO $2500 FINE AND 5 YEARS<br />

IMPRISONMENT FOR DAMAGING<br />

OR REMOVING THIS SIGN<br />

OHIO REV. CODE SEC. 4511.17<br />

0 1 2 3 4 5 6 7 08 09 10 11 12<br />

EREC 1 2 3 4 5 6 7 8 9 10 11 12<br />

10 11 12 13 14 15 16 17<br />

Fabricate sign post reflectors with flat sheet aluminum <strong>and</strong> Type G, H or J<br />

reflective sheeting. Install red sign post reflectors on each post with the following<br />

post-mounted signs: Stop (R1-1), Yield (R1-2), Do Not Enter (R5-1), <strong>and</strong> Wrong<br />

Way (R5-1a). Install yellow sign post reflectors on each post with the following<br />

post-mounted signs: One-Direction Large Arrow (W1-6), Two-Direction Large<br />

Arrow (W1-7), Chevron Alignment (W1-8), <strong>and</strong> Stop Ahead (W3-1, W3-1a).<br />

630.05 Foundations. Locate sign support foundations so the plane <strong>of</strong> the sign<br />

surface is at a right angle to the roadway lanes served (except for signs not<br />

intended for this orientation). Install foundations in accordance with 632.14.<br />

Furnish <strong>and</strong> install a ground rod at each rigid overhead <strong>and</strong> span wire sign support<br />

foundation, in accordance with 625.16.<br />

Before placing foundation concrete for embedded supports, brace the supports<br />

in a vertical position. 7 days after concrete placement, remove bracing for<br />

embedded supports <strong>and</strong> erect signs.<br />

630.06 Sign Supports. Sign supports consist <strong>of</strong> ground mounted, rigid<br />

overhead, span wire, <strong>and</strong> overpass structure mounted types. Fabricate sign<br />

supports according to the applicable requirements <strong>of</strong> Item 513, <strong>and</strong> weld according<br />

to 513.21. The approval <strong>of</strong> fabricators according to 501.03 will not apply. Hot-dip<br />

524

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!