624.04<br />

the Contractor with the first estimate payable, but not sooner than 15 days after the<br />

start <strong>of</strong> work at the project site.<br />

B. The <strong>Department</strong> will release an additional 40 percent <strong>of</strong> the lump sum<br />

amount bid for Mobilization or 40 percent <strong>of</strong> the amount shown in 624.02,<br />

whichever is less, with the first regular estimate after 10 percent <strong>of</strong> the original<br />

total contract amount, including payments for delivered materials but excluding<br />

Mobilization, is earned.<br />

C. Upon completion <strong>of</strong> all work on the project, including final cleanup, the<br />

<strong>Department</strong> will release payment <strong>of</strong> the remaining 10 percent <strong>of</strong> the lump sum<br />

amount bid for Mobilization <strong>and</strong> any amount <strong>of</strong> the lump sum price bid for<br />

Mobilization, in excess <strong>of</strong> the total amount shown in 624.02 for partial payment.<br />

Final cleanup includes but is not limited to the removal <strong>of</strong> layout stakes installed<br />

under Item 623 <strong>and</strong> as Directed by the Engineer, sediment <strong>and</strong> erosion control<br />

items installed under Item 207.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract price as follows:<br />

Item Unit Description<br />

624 Lump Sum Mobilization<br />

ITEM 625 HIGHWAY LIGHTING<br />

625.01 Description<br />

625.02 Definitions<br />

625.03 Codes<br />

625.04 Permits<br />

625.05 <strong>Material</strong>s<br />

625.06 Working Plans<br />

625.07 Incidentals<br />

625.08 Luminaires<br />

625.09 Luminaire Supports<br />

625.10 Foundations<br />

625.11 Junction Boxes (H<strong>and</strong>holes) & Pull Boxes (Manholes)<br />

625.12 Raceways <strong>and</strong> Conduits<br />

625.13 Trenching<br />

625.14 Jacking or Boring<br />

625.15 Power Service(Control Equipment)<br />

625.16 Grounding<br />

625.17 Wiring <strong>and</strong> Cabling<br />

625.18 Connections<br />

625.19 Testing <strong>of</strong> Installations<br />

625.20 Plastic Caution Tape<br />

625.21 Removal <strong>of</strong> Lighting Equipment<br />

625.22 Method <strong>of</strong> Measurement<br />

625.23 Basis <strong>of</strong> Payment<br />

504