623.03 at points along the line so that at least two of the stakes can be seen distinctly from any point on the line. Before beginning construction, stake Right-of-Way lines at locations where construction is to be performed. The Engineer will not require the Contractor to set additional stakes to locate a utility line that is not included as a pay item in the Contract, or to determine the property line between the properties. The Contractor may elect to perform portions of this work by electronic methods. Submit a plan of action to the Engineer detailing the means and methods to produce the desired results. After the plan of action is approved, layout the first 1000 feet (300 m) of the project by conventional methods. The Department will evaluate the first 1000 feet (300 m) using electronic methods to verify the accuracy of the equipment. Ensure that the accuracy of the electronic methods are within 2 percent of the conventional methods. Once the accuracy of the electronic methods is established, use the conventional methods to set every 1000 feet (300 m) of the project measured along the centerline. A ground control point is required for every structure, and a print out of the work is required for every 200 feet (60 m) of the project. If the electronic methods are found to be out of the above tolerance, submit a plan of action to correct the problem. If the problem persists, return to conventional methods. The Contractor is responsible for having the finished Work conform to the lines, grades, elevations, and dimensions shown on the plans. Any inspection or checking of the Contractor’s layout by the Engineer and the acceptance of all or any part of it does not relieve the Contractor of the responsibility to secure the proper dimensions, grades, and elevations of the several parts of the work. Exercise care in the preservation of stakes and benchmarks, and reset them at no additional cost to the Department when any are damaged, lost, displaced, or removed. Use competent personnel and suitable equipment for the layout work required and that a Registered Engineer or a Registered Surveyor supervises the operation. Do not engage the services of any person or persons employed by the Department for the performance of any of the work covered by this specification. Verify survey information shown on the plans, except for the centerline of the project, which may be use to lay out the Work. The removal of layout stakes at the completion of the Work is a final cleanup item that is required as a condition of full payment of 624 Mobilization. 623.03 Basis of Payment. The Department will pay for accepted quantities at the contract price as follows: Item Unit Description 623 Lump Sum Construction Layout Stakes 624.01 Description 624.02 Limitation ITEM 624 MOBILIZATION 502
624.03 Method of Measurement 624.04 Basis of Payment 503 624.01 624.01 Description. This work consists of the preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of all field offices, buildings, and other facilities necessary for work on the project; for all other work and operations that must be performed or costs incurred before beginning the Work on the other contract items; and for demobilization. If Mobilization is not included as a pay item in the Contract, the Department will not pay for this work separately but will consider it incidental to the other Contract Items. 624.02 Limitation. The Department will limit the sum of the partial payments specified in 624.04.A and 624.04.B to the amounts shown in Table 624.02-1 under “Maximum Total of Partial Payments”. The Department will pay the balance of the lump sum amount bid, as specified in 624.04.C. TABLE 624.02-1 Total Contract Amount Maximum Total of Partial More than Up to, inclusive Payments ($) ($) ($) 0 50,000 0 50,000 100,000 2,000 100,000 200,000 4,000 200,000 500,000 10,000 500,000 1,000,000 20,000 1,000,000 2,000,000 40,000 2,000,000 5,000,000 100,000 5,000,000 10,000,000 200,000 10,000,000 20,000,000 400,000 20,000,000 40,000,000 800,000 40,000,000 60,000,000 1,200,000 60,000,000 80,000,000 1,600,000 80,000,000 -- 2,000,000 If the lump sum amount bid for Mobilization exceeds the total shown in Table 624.02-1 for partial payments, the Department will pay the excess upon completion of the project. 624.03 Method of Measurement. The Department will measure Mobilization as a unit, acceptably performed. 624.04 Basis of Payment. The Department will make partial payments according to 109.09 and as modified by the following schedule: A. The Department will release 50 percent of the lump sum amount bid for Mobilization or 50 percent of the amount shown in 624.02, whichever is less, to
- Page 457 and 458: 605.07 Construct the underdrains ou
- Page 459 and 460: 453 606.04 Space Type 5A guardrail
- Page 461 and 462: 607.05 Horizontal Deflection 607.06
- Page 463 and 464: 457 607.10 607.10 Basis of Payment.
- Page 465 and 466: 608.09 The Department will measure
- Page 467 and 468: 461 609.04 portions of adjacent sec
- Page 469 and 470: 463 609.07 Where medians and traffi
- Page 471 and 472: 465 610.04 Use metal sheets with a
- Page 473 and 474: 467 610.09 610.09 Basis of Payment.
- Page 475 and 476: 469 613.06 The Contractor may use f
- Page 477 and 478: 614.03 B. When the highway under co
- Page 479 and 480: 473 614.06 614.055 Surface Conditio
- Page 481 and 482: 475 614.11 A. Acceptability and Exp
- Page 483 and 484: 614.11 Apply Class I work zone mark
- Page 485 and 486: 479 614.11 passing zone and places
- Page 487 and 488: 481 614.12 approximately 4 inches (
- Page 489 and 490: Line Type Normal Spacing Feet (Mete
- Page 491 and 492: B. Work zone signal, pole, or contr
- Page 493 and 494: 615.05 specified in Item 606, excep
- Page 495 and 496: 489 616.01 616.01 Description. This
- Page 497 and 498: TABLE 617.06-1 Material Conversion
- Page 499 and 500: 493 619.02 Furnish neat, sanitary,
- Page 501 and 502: 495 620.03 620.03 Layout. Lay out a
- Page 503 and 504: 497 621.05 When a casting is insert
- Page 505 and 506: 499 621.10 The Department will meas
- Page 507: 622.09 622.09 Basis of Payment. The
- Page 511 and 512: 505 625.01 625.01 Description. This
- Page 513 and 514: 625.10 Ensure that the grounding co
- Page 515 and 516: 509 625.13 grounding conductor that
- Page 517 and 518: 511 625.16 625.16 Grounding. Connec
- Page 519 and 520: 513 625.19 Measure the earth resist
- Page 521 and 522: Pull boxes include the aggregate fo
- Page 523 and 524: 517 625.23 except for a power servi
- Page 525 and 526: 519 626.04 The Contractor may vary
- Page 527 and 528: Concrete, Class C..................
- Page 529 and 530: 523 630.04 panels to achieve the si
- Page 531 and 532: 525 630.06 galvanize steel structur
- Page 533 and 534: 527 630.07 Provide for the attachme
- Page 535 and 536: Remove temporary overlay signs so a
- Page 537 and 538: 630.15 The Department will measure
- Page 539 and 540: 631.08 Controls 631.09 Electrical S
- Page 541 and 542: 535 631.07 install the nipple. Ensu
- Page 543 and 544: Item Unit Description 631 Each Sign
- Page 545 and 546: 539 632.04 Ensure that major items
- Page 547 and 548: 541 632.06 Upon acceptance of the p
- Page 549 and 550: 543 632.15 against undisturbed soil
- Page 551 and 552: 545 632.23 Support cables installed
- Page 553 and 554: 547 632.28 complete test records, t
- Page 555 and 556: 549 632.30 include excavation, dewa
- Page 557 and 558: 632 Each Power Service 632 Each Cov
624.03 Method <strong>of</strong> Measurement<br />
624.04 Basis <strong>of</strong> Payment<br />
503<br />
624.01<br />
624.01 Description. This work consists <strong>of</strong> the preparatory work <strong>and</strong><br />
operations including, but not limited to, those necessary for the movement <strong>of</strong><br />
personnel, equipment, supplies, <strong>and</strong> incidentals to the project site; for the<br />
establishment <strong>of</strong> all field <strong>of</strong>fices, buildings, <strong>and</strong> other facilities necessary for work<br />
on the project; for all other work <strong>and</strong> operations that must be performed or costs<br />
incurred before beginning the Work on the other contract items; <strong>and</strong> for<br />
demobilization.<br />
If Mobilization is not included as a pay item in the Contract, the <strong>Department</strong><br />
will not pay for this work separately but will consider it incidental to the other<br />
Contract Items.<br />
624.02 Limitation. The <strong>Department</strong> will limit the sum <strong>of</strong> the partial payments<br />
specified in 624.04.A <strong>and</strong> 624.04.B to the amounts shown in Table 624.02-1 under<br />
“Maximum Total <strong>of</strong> Partial Payments”. The <strong>Department</strong> will pay the balance <strong>of</strong><br />
the lump sum amount bid, as specified in 624.04.C.<br />
TABLE 624.02-1<br />
Total Contract Amount Maximum Total <strong>of</strong> Partial<br />
More than Up to, inclusive Payments<br />
($) ($) ($)<br />
0 50,000 0<br />
50,000 100,000 2,000<br />
100,000 200,000 4,000<br />
200,000 500,000 10,000<br />
500,000 1,000,000 20,000<br />
1,000,000 2,000,000 40,000<br />
2,000,000 5,000,000 100,000<br />
5,000,000 10,000,000 200,000<br />
10,000,000 20,000,000 400,000<br />
20,000,000 40,000,000 800,000<br />
40,000,000 60,000,000 1,200,000<br />
60,000,000 80,000,000 1,600,000<br />
80,000,000 -- 2,000,000<br />
If the lump sum amount bid for Mobilization exceeds the total shown in Table<br />
624.02-1 for partial payments, the <strong>Department</strong> will pay the excess upon<br />
completion <strong>of</strong> the project.<br />
624.03 Method <strong>of</strong> Measurement. The <strong>Department</strong> will measure Mobilization<br />
as a unit, acceptably performed.<br />
624.04 Basis <strong>of</strong> Payment. The <strong>Department</strong> will make partial payments<br />
according to 109.09 <strong>and</strong> as modified by the following schedule:<br />
A. The <strong>Department</strong> will release 50 percent <strong>of</strong> the lump sum amount bid for<br />
Mobilization or 50 percent <strong>of</strong> the amount shown in 624.02, whichever is less, to