622.09<br />

622.09 Basis <strong>of</strong> Payment. The cost <strong>of</strong> all inserts, sleeves, fittings, connectors,<br />

reinforcement, dowels, preformed filler, excavation, <strong>and</strong> backfill is incidental to<br />

these items.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract prices as<br />

follows:<br />

Item Unit Description<br />

622 Foot (Meter) Concrete Barrier, Type ___<br />

622 Foot (Meter) Portable Concrete Barrier, ___" (___ mm)<br />

622 Foot (Meter) Portable Concrete Barrier, ___" (___ mm)<br />

Bridge Mounted<br />

ITEM 623 CONSTRUCTION LAYOUT STAKES<br />

623.01 Description<br />

623.02 General<br />

623.03 Basis <strong>of</strong> Payment<br />

623.01 Description. This work consists <strong>of</strong> furnishing, placing, <strong>and</strong><br />

maintaining construction layout stakes necessary for the proper prosecution <strong>of</strong> the<br />

work under the contract <strong>and</strong> removing all stakes at the completion <strong>of</strong> the project.<br />

623.02 General. The <strong>Department</strong> will locate <strong>and</strong> reference to either<br />

strategically placed Project Control Monuments <strong>and</strong> Project Geometric Layout<br />

Coordinate data or Centerline <strong>of</strong> <strong>Construction</strong> points with 3 point reference ties as<br />

shown in the plans. The <strong>Department</strong> will establish benchmarks along the line <strong>of</strong><br />

the improvement outside construction limits. The <strong>Department</strong> will establish one<br />

benchmark for use at each structure with a span greater than 20 feet (6.1 m). The<br />

<strong>Department</strong> will not locate the centerline <strong>of</strong> short street intersection returns.<br />

Locating <strong>and</strong> referencing the centerline consists <strong>of</strong> locating <strong>and</strong> referencing control<br />

points such as point <strong>of</strong> curve, point <strong>of</strong> tangent, <strong>and</strong> sufficient points on tangent to<br />

provide a line <strong>of</strong> sight. Establish reference points outside the construction limits in<br />

such a manner that they will be available to reestablish the control points at any<br />

time during the course <strong>of</strong> the work. The Engineer will identify to the Contractor<br />

control points set by the <strong>Department</strong> <strong>and</strong> will keep the field notes in the field<br />

<strong>of</strong>fice.<br />

Furnish field forces <strong>and</strong> set all additional stakes for the project, including<br />

interchanges, that are needed to establish <strong>of</strong>fset stakes, reference points, slope<br />

stakes, pavement <strong>and</strong> curb line <strong>and</strong> grade, stakes for bridges, culverts, sewers <strong>and</strong><br />

drainage structures, paved gutters, walls, monuments, fence, Right-<strong>of</strong>-Way lines,<br />

<strong>and</strong> any other horizontal or vertical controls, including supplementary benchmarks,<br />

necessary to secure a correct layout <strong>of</strong> the work. Determine the location <strong>of</strong> slope<br />

stakes for grading work by a calculation method, <strong>and</strong> make a copy <strong>of</strong> these<br />

calculations available to the Engineer for the project records. Set stakes for the<br />

line <strong>and</strong> grade <strong>of</strong> pavement <strong>and</strong> curb at sufficient station intervals but not<br />

exceeding 50 feet (20 m) to ensure conformance to plan line <strong>and</strong> grade. Staking <strong>of</strong><br />

Right-<strong>of</strong>-Way lines consists <strong>of</strong> placing tall stakes, properly identified <strong>and</strong> readily<br />

discernible, at points <strong>of</strong> change in width or direction <strong>of</strong> the Right-<strong>of</strong>-Way line <strong>and</strong><br />