614.15 condition, and the Department will deduct the cost of such services from any money that may be due or become due the Contractor. 614.15 Method of Measurement. The Department will measure Work Zone Marking Signs as the number of sign installations, including the sign, necessary supports, and all attachment hardware. The Department will include all other work zone signs under Maintaining Traffic unless separately itemized. The Department will measure Work Zone Pavement Markings complete in place, by class and material, in the units designated. The Department will measure line quantities as the length of the completed stripe, including gaps, intersections, and other sections of pavement not normally marked. 614.16 Basis of Payment. The Department will make partial payments according to 109.09 and as modified by the following schedule: If the project duration from first day of physical work to original completion date is greater than or equal to 45 calendar days, A. The Department will pay 30 percent of the lump sum amount bid for Maintaining Traffic with the first estimate, but not sooner than 15 days after the start of work at the project site. B. The Department will pay the remaining 70 percent of the lump sum amount bid for Maintaining Traffic according to 109.09 Unless separately itemized, the lump sum price bid for Maintaining Traffic shall include the cost of removal or covering of conflicting pavement markings, layout, application and removal of pavement markings when required, maintaining the existing highway in a safe condition for public use, removing abrasive and salt residue remaining from snow and ice control performed by the Department or local governments, providing flaggers and their equipment, and furnishing, maintaining in an acceptable condition, and subsequently removing the following work zone traffic control items as required by the Contract Documents: A. Signs, supports, and warning lights. B. Drums, cones, gates, barricades, and vertical panels. C. Flashing arrow panels. D. Work zone traffic signals. E. Lighting for work zone signals and flaggers. If traffic permanently damages beyond use any of the following items, the Department will compensate the Contractor for the fair market value of the damaged item according to 109.05 provided the Contractor has pursued but failed to obtain compensation from the motorist. Follow the procedures given in 107.15 for compensation for traffic damage to completed permanent items of Work, to obtain compensation from the motorist before requesting compensation from the Department. A. Flashing arrow panel. 484
B. Work zone signal, pole, or controller. C. Lighting unit or pole. D. Changeable message sign. E. Work Zone Impact Attenuator 485 614.16 The lump sum price bid for Detour Signing includes the cost of the Contractor furnishing, installing, maintaining, and removing the detour signing shown on the plans and their necessary supports. The Department will pay for the following items under their associated item numbers: 502 Bridges, 615 Roads and Pavement, 622 Portable Concrete Barrier. The Department will pay for aggregate and calcium chloride authorized by the Engineer and used for Maintaining Traffic under Items 410 and 616. The Department will pay for accepted quantities at the contract prices as follows: Item Unit Description 614 Lump Sum Maintaining Traffic 614 Lump Sum Detour Signing 614 Each Replacement Drum 614 Each Replacement Sign 614 Each Object Marker, ___ - Way 614 Each, Work Zone Pavement Mile, Foot Markings (Kilometer, Meter) 614 Each Work Zone Raised Pavement Marker 614 Day Portable Changeable Message Sign 614 Each Work Zone Speed Limit Sign 614 Each Work Zone Marking Sign 614 Hour Law Enforcement Officer with Patrol Car 614 Each Barrier Reflector 614 Each Work Zone Crossover Lighting System 614 Each Work Zone Impact Attenuator 614 Mile (Kilometer) Work Zone Lane Line, Class ___, ___* 614 Mile (Kilometer) Work Zone Center Line, Class ___, ___* 614 Foot Work Zone Channelizing (Meter) Line, Class I, ___* 614 Mile (Kilometer) Work Zone Edgeline, Class I, ___* 614 Foot Work Zone Gore Marking, (Meter) Class II, ___* 614 Foot Work Zone Stop Line, (Meter) Class I, ___* 614 Foot Work Zone Arrow, (Meter) Class I, ___* 614 Foot Work Zone Crosswalk (Meter) Line, Class I, ___*
- Page 439 and 440: Polyvinyl chloride sanitary pipe ..
- Page 441 and 442: 435 603.05 place with approval from
- Page 443 and 444: 437 603.08 cut end at an interior j
- Page 445 and 446: 439 603.09 c. If resilient and flex
- Page 447 and 448: 441 603.11 1. In a cut situation, p
- Page 449 and 450: 603 Foot (Meter) ___" (___ mm) Cond
- Page 451 and 452: 604.02 Use removed or excavated mat
- Page 453 and 454: 447 604.07 mm). Ensure that the str
- Page 455 and 456: 449 605.03 If the size of the under
- Page 457 and 458: 605.07 Construct the underdrains ou
- Page 459 and 460: 453 606.04 Space Type 5A guardrail
- Page 461 and 462: 607.05 Horizontal Deflection 607.06
- Page 463 and 464: 457 607.10 607.10 Basis of Payment.
- Page 465 and 466: 608.09 The Department will measure
- Page 467 and 468: 461 609.04 portions of adjacent sec
- Page 469 and 470: 463 609.07 Where medians and traffi
- Page 471 and 472: 465 610.04 Use metal sheets with a
- Page 473 and 474: 467 610.09 610.09 Basis of Payment.
- Page 475 and 476: 469 613.06 The Contractor may use f
- Page 477 and 478: 614.03 B. When the highway under co
- Page 479 and 480: 473 614.06 614.055 Surface Conditio
- Page 481 and 482: 475 614.11 A. Acceptability and Exp
- Page 483 and 484: 614.11 Apply Class I work zone mark
- Page 485 and 486: 479 614.11 passing zone and places
- Page 487 and 488: 481 614.12 approximately 4 inches (
- Page 489: Line Type Normal Spacing Feet (Mete
- Page 493 and 494: 615.05 specified in Item 606, excep
- Page 495 and 496: 489 616.01 616.01 Description. This
- Page 497 and 498: TABLE 617.06-1 Material Conversion
- Page 499 and 500: 493 619.02 Furnish neat, sanitary,
- Page 501 and 502: 495 620.03 620.03 Layout. Lay out a
- Page 503 and 504: 497 621.05 When a casting is insert
- Page 505 and 506: 499 621.10 The Department will meas
- Page 507 and 508: 622.09 622.09 Basis of Payment. The
- Page 509 and 510: 624.03 Method of Measurement 624.04
- Page 511 and 512: 505 625.01 625.01 Description. This
- Page 513 and 514: 625.10 Ensure that the grounding co
- Page 515 and 516: 509 625.13 grounding conductor that
- Page 517 and 518: 511 625.16 625.16 Grounding. Connec
- Page 519 and 520: 513 625.19 Measure the earth resist
- Page 521 and 522: Pull boxes include the aggregate fo
- Page 523 and 524: 517 625.23 except for a power servi
- Page 525 and 526: 519 626.04 The Contractor may vary
- Page 527 and 528: Concrete, Class C..................
- Page 529 and 530: 523 630.04 panels to achieve the si
- Page 531 and 532: 525 630.06 galvanize steel structur
- Page 533 and 534: 527 630.07 Provide for the attachme
- Page 535 and 536: Remove temporary overlay signs so a
- Page 537 and 538: 630.15 The Department will measure
- Page 539 and 540: 631.08 Controls 631.09 Electrical S
B. Work zone signal, pole, or controller.<br />
C. Lighting unit or pole.<br />
D. Changeable message sign.<br />
E. Work Zone Impact Attenuator<br />
485<br />
614.16<br />
The lump sum price bid for Detour Signing includes the cost <strong>of</strong> the Contractor<br />
furnishing, installing, maintaining, <strong>and</strong> removing the detour signing shown on the<br />
plans <strong>and</strong> their necessary supports.<br />
The <strong>Department</strong> will pay for the following items under their associated item<br />
numbers: 502 Bridges, 615 Roads <strong>and</strong> Pavement, 622 Portable Concrete Barrier.<br />
The <strong>Department</strong> will pay for aggregate <strong>and</strong> calcium chloride authorized by the<br />
Engineer <strong>and</strong> used for Maintaining Traffic under Items 410 <strong>and</strong> 616.<br />
The <strong>Department</strong> will pay for accepted quantities at the contract prices as<br />
follows:<br />
Item Unit Description<br />
614 Lump Sum Maintaining Traffic<br />
614 Lump Sum Detour Signing<br />
614 Each Replacement Drum<br />
614 Each Replacement Sign<br />
614 Each Object Marker, ___ - Way<br />
614 Each, Work Zone Pavement<br />
Mile, Foot Markings<br />
(Kilometer,<br />
Meter)<br />
614 Each Work Zone Raised Pavement Marker<br />
614 Day Portable Changeable Message Sign<br />
614 Each Work Zone Speed Limit Sign<br />
614 Each Work Zone Marking Sign<br />
614 Hour Law Enforcement Officer with Patrol Car<br />
614 Each Barrier Reflector<br />
614 Each Work Zone Crossover Lighting System<br />
614 Each Work Zone Impact Attenuator<br />
614 Mile (Kilometer) Work Zone Lane Line, Class ___, ___*<br />
614 Mile (Kilometer) Work Zone Center Line,<br />
Class ___, ___*<br />
614 Foot Work Zone Channelizing<br />
(Meter) Line, Class I, ___*<br />
614 Mile (Kilometer) Work Zone Edgeline, Class I, ___*<br />
614 Foot Work Zone Gore Marking,<br />
(Meter) Class II, ___*<br />
614 Foot Work Zone Stop Line,<br />
(Meter) Class I, ___*<br />
614 Foot Work Zone Arrow,<br />
(Meter) Class I, ___*<br />
614 Foot Work Zone Crosswalk<br />
(Meter) Line, Class I, ___*