614.11<br />

b. Covering Conflicting Markings. With the Engineer’s approval, use<br />

removable, non-reflective, preformed blackout tape according to Supplement<br />

1187 to cover conflicting markings. Remove or replace the blackout tape within<br />

15 days <strong>of</strong> installation. Furnish products according to the <strong>Department</strong>s Qualified<br />

Products List (QPL).<br />

2. Raised Pavement Markers. Remove the prismatic retro-reflector<br />

within any raised pavement marker that is in conflict with the work zone pavement<br />

markings. When the work zone pavement markings are removed <strong>and</strong> the raised<br />

pavement marker is no longer in conflict, thoroughly clean the recessed reflector<br />

attachment area <strong>of</strong> the casting <strong>and</strong> install a new prismatic retro-reflector <strong>of</strong> the<br />

same kind <strong>and</strong> color. The cost for this work is incidental to the various pay items.<br />

H. Allowable Duration <strong>of</strong> Work Zone Markings.<br />

1. No Passing Zones. When existing permanent no-passing-zone<br />

markings are removed or obliterated as the result <strong>of</strong> a construction operation<br />

(pavement grinding, asphalt concrete pavement overlays, etc.) <strong>and</strong> the section <strong>of</strong><br />

pavement continues to be used by the traveling public, place Class I Center Line<br />

Markings or final center line markings as specified by the plan within 3 Calendar<br />

Days unless thermoplastic or epoxy final markings are to be applied on the surface<br />

course. If thermoplastic or epoxy final markings are to be applied on the surface<br />

course, place Class III Center Line Markings or final center line markings as<br />

specified in the plan within 3 Calendar Days.<br />

a. Subsequent Work in No Passing Zones. If, after the original<br />

markings are removed or obliterated, the Contractor returns to the subject no<br />

478<br />

Removal Method<br />

Type <strong>of</strong> Pavement<br />

grinder[1]<br />

s<strong>and</strong>, shot or<br />

water blast<br />

Existing Asphalt<br />

Temporary<br />

Permanent<br />

Y<br />

N<br />

Y<br />

Y<br />

New Asphalt<br />

Existing Concrete<br />

New Concrete<br />

Y - method is permitted to be used<br />

N - method is not permitted to be used<br />

Temporary Y Y<br />

Intermediate Y Y<br />

Permanent N Y<br />

Temporary Y Y<br />

Permanent N Y<br />

Temporary Y Y<br />

Permanent N Y<br />

[1] – when a drum is mounted to a skid steer loader, the drum must be able to<br />

accommodate a minimum <strong>of</strong> 150 teeth