608.09<br />

The <strong>Department</strong> will measure Concrete Steps by the number <strong>of</strong> feet (meters),<br />

along the front edge <strong>of</strong> each tread. Where steps are constructed with integral<br />

walls, the <strong>Department</strong> will include the thickness <strong>of</strong> the integral walls with the tread<br />

width measurement.<br />

608.09 Basis <strong>of</strong> Payment. Payment for walks, curb ramps, <strong>and</strong> steps is full<br />

compensation for excavation, backfill, base course material, reinforcing steel, h<strong>and</strong><br />

railing, expansion joint material, <strong>and</strong> incidentals necessary to complete the<br />

specified items.<br />

Payment for curb ramps in new concrete walk includes the cost <strong>of</strong> any<br />

additional materials, grading, forming <strong>and</strong> finishing not included in the new walk,<br />

which is measured through the curb ramp area. Payment for curb ramps in<br />

existing concrete walk includes all materials, grading, forming, <strong>and</strong> finishing <strong>of</strong> the<br />

curb <strong>and</strong> walk <strong>of</strong> the ramp.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract prices as<br />

follows:<br />

Item Unit Description<br />

608 Square Foot Concrete Walk<br />

(Square Meter)<br />

608 Square Foot Asphalt Concrete Walk<br />

(Square Meter)<br />

608 Square Foot Aggregate Walk<br />

(Square Meter)<br />

608 Each, Square Foot Curb Ramps<br />

(Square Meter)<br />

608 Foot (Meter) Concrete Steps<br />

ITEM 609 CURBING, CONCRETE MEDIANS, AND TRAFFIC<br />

ISLANDS<br />

609.01 Description<br />

609.02 <strong>Material</strong>s<br />

609.03 Stone Curb<br />

609.04 Cast-in-Place Concrete Curb <strong>and</strong> Combination Curb <strong>and</strong> Gutter<br />

609.05 Asphalt Concrete Curb<br />

609.06 Concrete Median <strong>and</strong> Traffic Isl<strong>and</strong><br />

609.07 Method <strong>of</strong> Measurement<br />

609.08 Basis <strong>of</strong> Payment<br />

609.01 Description. This work consists <strong>of</strong> furnishing <strong>and</strong> constructing curb,<br />

combination curb <strong>and</strong> gutter, medians, <strong>and</strong> traffic isl<strong>and</strong>s. This work also consists<br />

<strong>of</strong> excavating, backfilling, furnishing <strong>and</strong> installing joint materials, <strong>and</strong> disposing<br />

<strong>of</strong> surplus excavation <strong>and</strong> discarded materials according to Item 203.<br />

609.02 <strong>Material</strong>s. Furnish materials conforming to:<br />

Concrete, Class C......................................................... 499<br />

Preformed filler ....................................................... 705.03<br />

Tie bar steel, epoxy coated<br />

459