523.04 523.04 Test Report. Perform the dynamic test and CAPWAP analysis and immediately provide the Engineer driving criteria for any piles to be driven within the next 48 hours. Within 48 hours after performing the dynamic pile test or restrike tests, supply the Engineer with a written report confirming driving requirements for piles represented by the test. Include in the report, the required blow count for: A. The different strokes of the ram at 6-inch (150 mm) intervals within the expected range of operation as determined by a wave equation analysis (WEAP), when open ended diesel hammers and drop hammers are used. B. The selected bounce pressures when closed end diesel hammers are used. C. The operating air pressure and stroke when an air operated hammer is used. D. The selected output energy or stroke when a hydraulic hammer is used. Also include in the report a minimum depth of penetration if applicable. Submit an electronic version of the report and data files from the testing and analysis to the Office of Structural Engineering. 523.05 Basis of Payment. The Department will pay for dynamic load testing after being provided the written test at the contract price as follows: Item Unit Description 523 Each Dynamic Load Testing 523 Each Restrike ITEM 524 DRILLED SHAFTS 524.01 Description 524.02 Materials 524.03 Contractor’s Installation Plan 524.04 Hole Excavation 524.05 Friction Type Drilled Shafts 524.06 Casings 524.07 Slurry 524.08 Excavation Inspection 524.09 Reinforcing Steel for Drilled Shafts 524.10 Concrete for Drilled Shafts 524.11 Free Fall Concrete Placement 524.12 Tremie 524.13 Pumped Concrete 524.14 Construction Tolerances 524.15 Inspection Records 524.16 Method of Measurement 524.17 Basis of Payment 524.01 Description. This work consists of furnishing and installing drilled shafts. The lengths of the drilled shafts shown on the plans are estimated from available subsurface information. Furnish the proposed drilled shafts according to 410
411 524.02 plan requirements, with the understanding that the actual length required is based on conditions encountered during construction and may differ from the estimated length shown on the plans. 524.02 Materials. Furnish material conforming to: Concrete, Class S ......................................................... 511 Epoxy coated reinforcing steel .................................... 509 524.03 Contractor’s Installation Plan. Submit, for the Engineer’s acceptance, a written installation plan of procedures to follow when excavating the hole, placing the concrete, and monitoring the concrete placement. Submit the installation plan at least 14 Calendar Days before constructing the drilled shafts. Include the following information: A. Details of the sequence proposed for the overall drilled shaft construction operation. B. Procedures for maintaining correct horizontal and vertical alignment of the excavation. C. If using a casing, method to advance the casing. D. If using a temporary casing, details of the methods to extract the temporary casing and to maintain the concrete slump to keep concrete workable by adding admixtures such as retarders or superplasticizers. E. If using slurry, details of the methods to mix, circulate, and de-sand the slurry. For polymer slurry, submit the manufacturer’s recommendations for use of the slurry. F. Details of methods to clean the shaft excavation. G. Details of reinforcement placement including support and centralization methods. H. Details of concrete placement including proposed operational procedures for free fall, tremie, or pumping methods. I. A list of proposed equipment to be used such as cranes, drills, augers, bailing buckets, final cleaning equipment, de-sanding equipment, slurry pumps, tremies, concrete pumps, casings, etc. Acceptance of the installation plan will not relieve the Contractor of the responsibility for obtaining the required results. 524.04 Hole Excavation. Take precautions to prevent damaging existing structures and utilities. Precautions include, but are not limited to, selecting construction methods and procedures that will prevent excessive caving of the shaft excavation, and monitoring and controlling the vibrations from the driving of casing or sheeting or drilling of the shaft. When encountered, remove objects such as large boulders. Do not blast unless shown on the plans or authorized in writing by the Engineer.
- Page 365 and 366: 359 513.26 The fabrication quality
- Page 367 and 368: 361 513.30 The Department will not
- Page 369 and 370: 363 514.04 The quality control spec
- Page 371 and 372: 365 514.05 inspection identifies a
- Page 373 and 374: 367 514.07 continuously and uniform
- Page 375 and 376: 369 514.11 supporting 250 pounds (1
- Page 377 and 378: 371 514.13 1. For an automated blas
- Page 379 and 380: SW 846 Regulatory Concentration Ana
- Page 381 and 382: 375 514.17 Except for primer, mix p
- Page 383 and 384: 377 514.18 If mud cracking occurs,
- Page 385 and 386: 514.20 F. Measure other areas or re
- Page 387 and 388: 514.23 immediately before applying
- Page 389 and 390: Item Unit Description 514 Square Fo
- Page 391 and 392: 385 515.07 members, and all other i
- Page 393 and 394: 515.13 according to a method accept
- Page 395 and 396: 515.15 production. When using admix
- Page 397 and 398: 391 515.17 BEAM DIMENSIONAL TOLERAN
- Page 399 and 400: 393 515.20 support locations. Durin
- Page 401 and 402: 395 516.04 516.03 Coating. Coat exp
- Page 403 and 404: 397 516.09 feet (meters) horizontal
- Page 405 and 406: Scuppers, structural steel and cast
- Page 407 and 408: 401 518.10 518.10 Basis of Payment.
- Page 409 and 410: 519.08 columns, the Department will
- Page 411 and 412: 405 520.05 and two times the weight
- Page 413 and 414: 407 520.11 520.11 Inspection and Te
- Page 415: Concrete footings will be paid for
- Page 419 and 420: 413 524.05 groundwater must be cont
- Page 421 and 422: 415 524.08 Determine density, visco
- Page 423 and 424: 417 524.13 parts, do not allow thes
- Page 425 and 426: ITEM 526 APPROACH SLABS 526.01 Desc
- Page 427 and 428: 600 INCIDENTALS ITEM 601 SLOPE AND
- Page 429 and 430: 423 601.05 Stretchers are bags plac
- Page 431 and 432: 425 601.12 mm) wide at the surface;
- Page 433 and 434: 427 602.03 602.03 Construction Requ
- Page 435 and 436: Soil and granular embankment ......
- Page 437 and 438: paved invert ......................
- Page 439 and 440: Polyvinyl chloride sanitary pipe ..
- Page 441 and 442: 435 603.05 place with approval from
- Page 443 and 444: 437 603.08 cut end at an interior j
- Page 445 and 446: 439 603.09 c. If resilient and flex
- Page 447 and 448: 441 603.11 1. In a cut situation, p
- Page 449 and 450: 603 Foot (Meter) ___" (___ mm) Cond
- Page 451 and 452: 604.02 Use removed or excavated mat
- Page 453 and 454: 447 604.07 mm). Ensure that the str
- Page 455 and 456: 449 605.03 If the size of the under
- Page 457 and 458: 605.07 Construct the underdrains ou
- Page 459 and 460: 453 606.04 Space Type 5A guardrail
- Page 461 and 462: 607.05 Horizontal Deflection 607.06
- Page 463 and 464: 457 607.10 607.10 Basis of Payment.
- Page 465 and 466: 608.09 The Department will measure
523.04<br />
523.04 Test Report. Perform the dynamic test <strong>and</strong> CAPWAP analysis <strong>and</strong><br />
immediately provide the Engineer driving criteria for any piles to be driven within<br />
the next 48 hours. Within 48 hours after performing the dynamic pile test or<br />
restrike tests, supply the Engineer with a written report confirming driving<br />
requirements for piles represented by the test. Include in the report, the required<br />
blow count for:<br />
A. The different strokes <strong>of</strong> the ram at 6-inch (150 mm) intervals within the<br />
expected range <strong>of</strong> operation as determined by a wave equation analysis (WEAP),<br />
when open ended diesel hammers <strong>and</strong> drop hammers are used.<br />
B. The selected bounce pressures when closed end diesel hammers are used.<br />
C. The operating air pressure <strong>and</strong> stroke when an air operated hammer is used.<br />
D. The selected output energy or stroke when a hydraulic hammer is used.<br />
Also include in the report a minimum depth <strong>of</strong> penetration if applicable.<br />
Submit an electronic version <strong>of</strong> the report <strong>and</strong> data files from the testing <strong>and</strong><br />
analysis to the Office <strong>of</strong> Structural Engineering.<br />
523.05 Basis <strong>of</strong> Payment. The <strong>Department</strong> will pay for dynamic load testing<br />
after being provided the written test at the contract price as follows:<br />
Item Unit Description<br />
523 Each Dynamic Load Testing<br />
523 Each Restrike<br />
ITEM 524 DRILLED SHAFTS<br />
524.01 Description<br />
524.02 <strong>Material</strong>s<br />
524.03 Contractor’s Installation Plan<br />
524.04 Hole Excavation<br />
524.05 Friction Type Drilled Shafts<br />
524.06 Casings<br />
524.07 Slurry<br />
524.08 Excavation Inspection<br />
524.09 Reinforcing Steel for Drilled Shafts<br />
524.10 Concrete for Drilled Shafts<br />
524.11 Free Fall Concrete Placement<br />
524.12 Tremie<br />
524.13 Pumped Concrete<br />
524.14 <strong>Construction</strong> Tolerances<br />
524.15 Inspection Records<br />
524.16 Method <strong>of</strong> Measurement<br />
524.17 Basis <strong>of</strong> Payment<br />
524.01 Description. This work consists <strong>of</strong> furnishing <strong>and</strong> installing drilled<br />
shafts. The lengths <strong>of</strong> the drilled shafts shown on the plans are estimated from<br />
available subsurface information. Furnish the proposed drilled shafts according to<br />
410