SW 846 Regulatory Concentration<br />

Analyte<br />

Limit<br />

Lead 5.0 mg/l<br />

Chromium 5.0 mg/l<br />

Arsenic 5.0 mg/l<br />

Cadmium 1.0 mg/l<br />

373<br />

514.13<br />

Label all the containers <strong>of</strong> hazardous blasting debris “HAZARDOUS”.<br />

Secure the storage location by surrounding the site with a 5 foot (1.5 m) high chain<br />

link fence fabric supported by traffic sign drive posts 10 feet (3 m) apart. Drive the<br />

traffic signposts into the ground at least 2 feet (0.6 m) deep. Secure the fencing<br />

with padlocks at the end <strong>of</strong> each day. Post hazardous waste warning signs at<br />

obvious locations on the fenced enclosure.<br />

The Office <strong>of</strong> <strong>Construction</strong> Administration will obtain a generator<br />

number assigned to the State. After the Office <strong>of</strong> <strong>Construction</strong> Administration<br />

obtains the generator number, arrange for the hauling, treating, <strong>and</strong> disposing <strong>of</strong><br />

the hazardous waste. Use a firm licensed by EPA to haul <strong>and</strong> dispose <strong>of</strong> the<br />

hazardous waste. This firm is also responsible for providing the completed<br />

Uniform Hazardous Waste Manifest (EPA Form 8700-22, or current version).<br />

In every case, properly dispose <strong>of</strong> all hazardous waste within 60 days<br />

after it is generated. If hazardous waste is not properly disposed <strong>of</strong> within 60 days,<br />

the <strong>Department</strong> will consider the Contactor in breach <strong>of</strong> its Contract <strong>and</strong> the<br />

<strong>Department</strong> will take the following actions:<br />

a. Immediately suspend all abrasive blasting <strong>and</strong> painting <strong>of</strong><br />

structural steel on the Project until hazardous waste is properly disposed.<br />

Surety.<br />

b. Cease processing all pay estimates.<br />

c. Forward a breach <strong>of</strong> contract notification to the Contractor’s<br />

The Contractor is responsible for fines or liens assessed by any<br />

governmental agency that has jurisdiction over the disposal <strong>of</strong> this hazardous<br />

waste material.<br />

Decontaminate or dispose <strong>of</strong> all collection <strong>and</strong> containment equipment<br />

according to EPA guidelines.<br />

The Contractor shall inform the <strong>Department</strong> when all hazardous waste<br />

has been removed from the Project so the EPA Site ID Number (Hazardous Waste<br />

Generator Number) can be deactivated.<br />

2. Non-Hazardous Solid Waste. For all waste that is determined to be a<br />

Non-Hazardous Solid Waste by the DRWE, the Contractor is required to:<br />

a. Before disposing <strong>of</strong> any material, provide the Engineer with<br />

documentation that the disposal facility is licensed by the EPA to accept nonhazardous<br />

solid waste.