514.04 specialist while the Contractor is performing work toward the completion of a Quality Control Point. Ensure that each quality control specialist is trained and equipped with Material Safety Data Sheets (MSDS), product data sheets, tools, and equipment necessary to provide quality control on all aspects of the work. Each quality control specialist shall have a thorough understanding of the plans for the work, including any pertinent addenda, change order, or other contract documents, and these Specifications. Duties each quality control specialist shall perform include: 1. Inspect equipment and abrasive at specified intervals. 2. Approve the work and provide documentation that the work has been approved immediately before each QCP. 3. Inspect the work with the Engineer or Inspector at each QCP. 4. Verify the Contractor or fabricator performed work according to the Contract Documents. 5. Cooperate with the inspection and testing performed by the Engineer and inspector. 6. Document test results and compare test results with the Engineer’s and inspector’s test results. 7. Notify Superintendent of nonconforming work. 8. Stop work when test equipment is not available and when necessary to ensure the work is performed according to the Contract. The fabricator’s quality control specialists shall provide the Engineer with a letter that includes specified information or check point data documenting acceptance of the work and consisting of the following: oil. 1. Checks on the abrasive to ensure that it has not been contaminated with 2. The profile of the blasted surface. 3. The air and steel temperature and dew point before blast cleaning and painting and at 4-hour intervals during the blasting and painting operation. 4. Readings of the actual dry film thickness. 5. The lot and stock number of the paint and the date of manufacture. 6. Documentation that the paint mixer is functioning properly, that each spray operator has demonstrated the ability to paint, and that all spray equipment is used as per the manufacturer’s recommendation. B. Quality Control Points (QCP). QCPs are points in time when one phase of the work is complete and approved by the quality control specialist and ready for inspection by the Engineer or the inspector before commencing the next phase of the work. At a QCP, the quality control specialist shall provide quality control tests bearing his signature to the Engineer or Inspector. The Contractor or fabricator shall provide the Engineer and inspectors access to inspect all affected surfaces. If 364
365 514.05 inspection identifies a deficiency, correct the deficiency according to the Contract Documents before starting the next phase of work. Discovery of defective work or material after a Quality Control Point is past or failure of the final product before final acceptance, shall not, in any way, prevent the Department from rejecting the final product or obligate the Department to final acceptance. Final acceptance will be determined as per 514.21, Final Inspection. Quality Control Points Purpose New Existing Steel Steel 1. Solvent Cleaning Remove asphalt cement, oil, grease, Yes etc. Yes 2. Grinding Flange Edges Remove sharp corners Yes Yes 3. Abrasive Blasting Blast surfaces to receive paint Yes Yes 4. Containment/Waste Contain, collect, & dispose of No Yes Disposal abrasive blasting debris 5. Prime Coat Application Check surface cleanliness, apply prime coat, check coating thickness Yes Yes 6. Remove Fins, Tears, & Slivers Remove surface defects and slivers Yes Yes 7. Washing of Shop Primer Remove all water soluble materials (salt, dirt, etc.) Yes No 8. Intermediate Coat Check surface cleanliness, apply Yes Yes Application intermediate coat, check coating thickness 9. Caulking Caulk areas not sealed by the intermediate coat Yes Yes 10. Finish Coat Check surface cleanliness, apply Yes Yes Application intermediate coat, check coating thickness 11. Final Review Acceptance and check total system thickness Yes Yes 514.05 Testing Equipment. For the project duration, provide the Engineer or inspectors with the test equipment listed below for the type of work at each work site with ongoing work. With the exception of the recording thermometer, the fabricator shall provide its quality control specialists with the test equipment listed below. The Contractor and fabricator shall maintain all testing equipment in good working order. When no test equipment is available, no work shall be performed. A. Film and a camera with the following features: 1. Uses self developing color print film. 2. Lens with auto focus system. 3. Focuses from 2 feet (0.6 m) to infinity. 4. Built-in fill flash. Or provide a digital camera with the following features:
- Page 319 and 320: 511.03 Proportions 511.04 Mix Optio
- Page 321 and 322: 511.09 511.09 Slump. Within the slu
- Page 323 and 324: FIGURE 1 ACI 308-81 511.11 Slipform
- Page 325 and 326: 319 511.13 of principal stress and
- Page 327 and 328: 321 511.16 from 50 to 100 °F (10 t
- Page 329 and 330: 323 511.19 corners or edges, and ot
- Page 331 and 332: 325 511.21 expansion joints. Saw gr
- Page 333 and 334: 327 511.25 511.25 Basis of Payment.
- Page 335 and 336: 329 512.03 Do not mix or apply the
- Page 337 and 338: 2. Non-epoxy sealer. 331 512.03 a.
- Page 339 and 340: 333 512.04 markings according to Se
- Page 341 and 342: 335 512.06 Engineer with written in
- Page 343 and 344: 337 512.07 200 psi (1400kPa) max.,
- Page 345 and 346: 339 512.08 applying the waterproofi
- Page 347 and 348: 341 512.09 512.09 Method of Measure
- Page 349 and 350: 343 513.03 The Office of Materials
- Page 351 and 352: 345 513.05 513.05 Fabricator Docume
- Page 353 and 354: 347 513.12 before assembly. During
- Page 355 and 356: 349 513.18 for up to 5-inch (127 mm
- Page 357 and 358: TABLE 513.20-1M Bolt Size (mm) To d
- Page 359 and 360: TABLE 513.20-2M 353 513.20 Bolt Siz
- Page 361 and 362: 355 513.23 each workday, when weldi
- Page 363 and 364: 357 513.25 A. Radiographic Inspecti
- Page 365 and 366: 359 513.26 The fabrication quality
- Page 367 and 368: 361 513.30 The Department will not
- Page 369: 363 514.04 The quality control spec
- Page 373 and 374: 367 514.07 continuously and uniform
- Page 375 and 376: 369 514.11 supporting 250 pounds (1
- Page 377 and 378: 371 514.13 1. For an automated blas
- Page 379 and 380: SW 846 Regulatory Concentration Ana
- Page 381 and 382: 375 514.17 Except for primer, mix p
- Page 383 and 384: 377 514.18 If mud cracking occurs,
- Page 385 and 386: 514.20 F. Measure other areas or re
- Page 387 and 388: 514.23 immediately before applying
- Page 389 and 390: Item Unit Description 514 Square Fo
- Page 391 and 392: 385 515.07 members, and all other i
- Page 393 and 394: 515.13 according to a method accept
- Page 395 and 396: 515.15 production. When using admix
- Page 397 and 398: 391 515.17 BEAM DIMENSIONAL TOLERAN
- Page 399 and 400: 393 515.20 support locations. Durin
- Page 401 and 402: 395 516.04 516.03 Coating. Coat exp
- Page 403 and 404: 397 516.09 feet (meters) horizontal
- Page 405 and 406: Scuppers, structural steel and cast
- Page 407 and 408: 401 518.10 518.10 Basis of Payment.
- Page 409 and 410: 519.08 columns, the Department will
- Page 411 and 412: 405 520.05 and two times the weight
- Page 413 and 414: 407 520.11 520.11 Inspection and Te
- Page 415 and 416: Concrete footings will be paid for
- Page 417 and 418: 411 524.02 plan requirements, with
- Page 419 and 420: 413 524.05 groundwater must be cont
365<br />
514.05<br />
inspection identifies a deficiency, correct the deficiency according to the Contract<br />
Documents before starting the next phase <strong>of</strong> work. Discovery <strong>of</strong> defective work or<br />
material after a Quality Control Point is past or failure <strong>of</strong> the final product before<br />
final acceptance, shall not, in any way, prevent the <strong>Department</strong> from rejecting the<br />
final product or obligate the <strong>Department</strong> to final acceptance. Final acceptance will<br />
be determined as per 514.21, Final Inspection.<br />
Quality Control Points Purpose<br />
New Existing<br />
Steel Steel<br />
1. Solvent Cleaning Remove asphalt cement, oil, grease, Yes<br />
etc.<br />
Yes<br />
2. Grinding Flange Edges Remove sharp corners Yes Yes<br />
3. Abrasive Blasting Blast surfaces to receive paint Yes Yes<br />
4. Containment/Waste Contain, collect, & dispose <strong>of</strong> No Yes<br />
Disposal<br />
abrasive blasting debris<br />
5. Prime Coat Application Check surface cleanliness, apply<br />
prime coat, check coating<br />
thickness<br />
Yes Yes<br />
6. Remove Fins, Tears, &<br />
Slivers<br />
Remove surface defects <strong>and</strong> slivers Yes Yes<br />
7. Washing <strong>of</strong> Shop Primer Remove all water soluble materials<br />
(salt, dirt, etc.)<br />
Yes No<br />
8. Intermediate Coat Check surface cleanliness, apply Yes Yes<br />
Application<br />
intermediate coat, check coating<br />
thickness<br />
9. Caulking Caulk areas not sealed by the<br />
intermediate coat<br />
Yes Yes<br />
10. Finish Coat Check surface cleanliness, apply Yes Yes<br />
Application<br />
intermediate coat, check coating<br />
thickness<br />
11. Final Review Acceptance <strong>and</strong> check total system<br />
thickness<br />
Yes Yes<br />
514.05 Testing Equipment. For the project duration, provide the Engineer or<br />
inspectors with the test equipment listed below for the type <strong>of</strong> work at each work<br />
site with ongoing work. With the exception <strong>of</strong> the recording thermometer, the<br />
fabricator shall provide its quality control specialists with the test equipment listed<br />
below. The Contractor <strong>and</strong> fabricator shall maintain all testing equipment in good<br />
working order. When no test equipment is available, no work shall be performed.<br />
A. Film <strong>and</strong> a camera with the following features:<br />
1. Uses self developing color print film.<br />
2. Lens with auto focus system.<br />
3. Focuses from 2 feet (0.6 m) to infinity.<br />
4. Built-in fill flash.<br />
Or provide a digital camera with the following features: