508.01<br />

If additional penetration is necessary in order to achieve the required bearing,<br />

the <strong>Department</strong> will pay for required splices at a negotiated price.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract prices as<br />

follows:<br />

Item Unit Description<br />

507 Foot (Meter) Steel Piles HP____×____, Furnished<br />

507 Foot (Meter) Steel Piles HP____×____, Driven<br />

507 Foot (Meter) ___" (___ mm) Cast-In-Place,<br />

Reinforced Concrete Piles, Furnished<br />

507 Foot (Meter) ___" (___ mm) Cast-In-Place,<br />

Reinforced Concrete Piles, Driven<br />

507 Foot (Meter) Timber Piles, Creosoted<br />

507 Foot (Meter) Timber Piles, Untreated<br />

507 Foot (Meter) Prebored Holes<br />

507 Each Steel Points or Shoes<br />

508.01 Description<br />

508.02 Falsework<br />

508.03 Forms<br />

508.04 Oiling Forms<br />

508.05 Basis <strong>of</strong> Payment<br />

ITEM 508 FALSEWORK AND FORMS<br />

508.01 Description. This work consist <strong>of</strong> designing <strong>and</strong> building <strong>of</strong> falsework<br />

<strong>and</strong> forms for the purpose <strong>of</strong> holding concrete in place until it has set up.<br />

508.02 Falsework. Provide substantial <strong>and</strong> rigid falsework that does not<br />

unduly obstruct any waterway, highway, or railway. Arrange intermediate<br />

supports in the completed structure to produce the camber necessary to conform to<br />

the plan pr<strong>of</strong>ile <strong>of</strong> the roadway.<br />

Do not allow the maximum deflection in the longitudinal falsework members at<br />

the edges <strong>of</strong> the concrete deck to exceed 1/2 inch (13 mm) or the amount obtained<br />

by the following formula, whichever is greater.<br />

where:<br />

+ 100<br />

=<br />

1000<br />

S<br />

d<br />

304<br />

S + 2540<br />

d =<br />

1000<br />

d = the maximum deflection in inches (millimeters)<br />

S = the distance between supports in inches (millimeters)<br />

For transverse falsework members, <strong>and</strong> for longitudinal falsework members<br />

other than those near the edges <strong>of</strong> the deck, increase the permissible deflection<br />

obtained from the above formula by 75 percent.