295<br />

504.01<br />

provide the minimum cover over culverts to accommodate heavy earth moving<br />

equipment at no expense to the <strong>Department</strong>.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract prices as<br />

follows:<br />

Item Unit Description<br />

503 Lump Sum C<strong>of</strong>ferdams <strong>and</strong> Excavation Bracing<br />

503 Cubic Yard Unclassified Excavation<br />

(Cubic Meter)<br />

503 Lump Sum Unclassified Excavation<br />

503 Cubic Yard Unclassified Excavation Including Rock<br />

(Cubic Meter)<br />

503 Cubic Yard Unclassified Excavation Including Shale<br />

(Cubic Meter)<br />

503 Cubic Yard Unclassified Excavation<br />

(Cubic Meter) Including Rock <strong>and</strong>/or Shale<br />

503 Cubic Yard Rock Excavation<br />

(Cubic Meter)<br />

503 Cubic Yard Shale Excavation<br />

(Cubic Meter)<br />

ITEM 504 SHEET PILING LEFT IN PLACE<br />

504.01 Description<br />

504.02 <strong>Material</strong>s<br />

504.03 Driving<br />

504.04 Method <strong>of</strong> Measurement<br />

504.05 Basis <strong>of</strong> Payment<br />

504.01 Description. This work consists <strong>of</strong> furnishing <strong>and</strong> driving steel sheet<br />

piling to be left in place, including furnishing <strong>and</strong> installing any specified anchors<br />

or other attachments to structures.<br />

504.02 <strong>Material</strong>s. Furnish new sheet piling conforming to 711.03. The<br />

Contractor may use used sheet piling in good condition that conforms to project<br />

requirements provided it is inspected <strong>and</strong> approved by the Engineer.<br />

504.03 Driving. Drive steel sheet piling to the tip elevation shown on the<br />

plans.<br />

504.04 Method <strong>of</strong> Measurement. The <strong>Department</strong> will measure Steel Sheet<br />

Piling Left In Place [Minimum Section Modulus <strong>of</strong> ____ cubic inches per foot<br />

(____ mm 3 /m)] <strong>of</strong> Wall by measuring the number <strong>of</strong> square feet (square meters) in<br />

the plane <strong>of</strong> the face <strong>of</strong> the sheeting, completed <strong>and</strong> accepted in place.<br />

504.05 Basis <strong>of</strong> Payment. The <strong>Department</strong> will pay for accepted quantities at<br />