503.10<br />

1. For Unclassified Excavation, 1 foot (0.3 m) outside the outer edge <strong>of</strong><br />

the footing, crossbeam, or wall.<br />

2. For Rock Excavation or Shale Excavation:<br />

a. If Rock Excavation is included in the Contract, by the outer edge<br />

<strong>of</strong> the footing or wall.<br />

b. If rock or shale is removed as part <strong>of</strong> Unclassified Excavation<br />

Including Rock <strong>and</strong>/or Shale:<br />

(1) Above the minimum specified depth <strong>of</strong> keying, the same as<br />

described in 503.09.C.1.<br />

(2) For the remainder <strong>of</strong> the excavation, the same as described<br />

in 503.09.C.2.a.<br />

For abutment excavation quantities, the <strong>Department</strong> will include material<br />

removed above the bench (if any), in front <strong>of</strong> the vertical plane described in<br />

503.09.C.1, <strong>and</strong> by the finished slope <strong>of</strong> the cut or embankment.<br />

For keys below footings, the <strong>Department</strong> will determine the volume <strong>of</strong> keys by<br />

the number <strong>of</strong> cubic yards (cubic meters) shown on the plans.<br />

The <strong>Department</strong> will measure Unclassified Excavation on a lump sum basis<br />

when shown on the plans.<br />

The <strong>Department</strong> will measure C<strong>of</strong>ferdams <strong>and</strong> Excavation Bracing on a lump<br />

sum basis.<br />

503.10 Basis <strong>of</strong> Payment.<br />

If an Item for C<strong>of</strong>ferdams <strong>and</strong> Excavation Bracing is not included in the<br />

Contract for payment, perform work according to 503.03 <strong>and</strong> the <strong>Department</strong> will<br />

pay for C<strong>of</strong>ferdams <strong>and</strong> Excavation Bracing under the contract unit price for<br />

excavation.<br />

The elevations shown on the plans for the bottoms <strong>of</strong> footings are considered as<br />

approximate. When excavation below plan elevation for footings is required, the<br />

<strong>Department</strong> will pay for the 3 feet (0.9 m) immediately below the plan elevation<br />

within the lateral limits described in 503.09.C.1 at the unit price bid for the class <strong>of</strong><br />

excavation.<br />

The <strong>Department</strong> will consider additional excavation to a maximum depth <strong>of</strong> 1<br />

foot (0.3 m) within the lateral limits described in 503.09 as incidental to the lump<br />

sum price. Excavation deeper than 1 foot (0.3 m) below plan elevation may be<br />

provided for as Extra Work, as described in 109.05.<br />

If C<strong>of</strong>ferdams <strong>and</strong> Excavation Bracing is a separate pay item, the lump sum<br />

price includes any extra cost involved for c<strong>of</strong>ferdams for additional depth up<br />

to 3 feet (0.9 m) below plan elevation. Excavation deeper than 3 feet (0.9 m)<br />

below plan elevation <strong>and</strong> the additional c<strong>of</strong>ferdams necessitated by this<br />

excavation may be provided for as Extra Work, as described in 109.05. The<br />

Contractor shall provide additional fill material <strong>and</strong> subsequent excavation to<br />