293<br />

503.08<br />

503.08 Backfill. Backfill under this item includes all replaced excavation <strong>and</strong><br />

new embankment adjacent to structures. Use backfill embankment materials<br />

conforming to 203.02.R, except behind the abutments below the approach slabs<br />

use material conforming to Item 203 Granular <strong>Material</strong> Type B. Place <strong>and</strong><br />

compact the backfill materials according to 203.06 <strong>and</strong> 203.07, except as modified<br />

by this subsection.<br />

Do not place backfill material against any structural element until the Engineer<br />

has approved the element.<br />

In bridge abutment areas compact backfill material to meet the compaction<br />

requirements in 203.07. Elsewhere, compact backfill material to 95 percent <strong>of</strong> the<br />

maximum laboratory dry density.<br />

When a test section method is used for compaction acceptance: Use<br />

compaction equipment with a total weight or a centrifugal force <strong>of</strong> least 1 ton (0.9<br />

metric tons). Supply the manufacturers’ information to verify this information.<br />

Use at least six passes to construct the production areas. Use at least 97 percent <strong>of</strong><br />

the test section maximum dry density for acceptance <strong>of</strong> the production areas.<br />

The Contractor does not have to place backfill material around piers that are not<br />

within the embankment area or adjacent to a roadway or a railway in thin layers or<br />

compact it, but should leave the backfill material in a neat condition with a<br />

compensating allowance made for settlement.<br />

Backfill in front <strong>of</strong> abutments <strong>and</strong> around piers to the ground lines shown on the<br />

plans.<br />

Backfill all structural foundation units as soon as practical after the required<br />

conditions <strong>of</strong> this subsection are met to avoid the ponding <strong>of</strong> surface water <strong>and</strong> the<br />

accumulation <strong>of</strong> debris. Simultaneously backfill in front <strong>of</strong> <strong>and</strong> behind abutments,<br />

piers, wing walls, <strong>and</strong> retaining walls.<br />

Carefully backfill against waterpro<strong>of</strong>ed surfaces to avoid damage to the<br />

waterpro<strong>of</strong>ing material.<br />

503.09 Method <strong>of</strong> Measurement. After the requirements <strong>of</strong> Items 201, 202,<br />

<strong>and</strong> 203 have been met, the <strong>Department</strong> will measure excavation by the number <strong>of</strong><br />

cubic yards (cubic meters) as follows:<br />

A. Bounded on the bottom. Bounded bottom plane <strong>of</strong> the footing, crossbeam,<br />

or wall.<br />

B. Bounded on the top.<br />

1. In cut sections, by the surface <strong>of</strong> the remaining ground.<br />

2. In fill sections:<br />

a. If excavation is performed before embankment is placed, by the<br />

surface <strong>of</strong> the original ground.<br />

b. If excavation is performed after embankment is placed, by the<br />

surface <strong>of</strong> the embankment.<br />

C. Bounded on the sides.