502.03 Design the temporary structure according to the AASHTO LRFD Bridge Design Specifications except that the design live loading, HL-93 may be reduced by 25 percent. Submit working drawings in accordance with 501.05. Drive piling to sufficient penetration to carry the superimposed loads according to Item 507, but not less than 24 tons (24 metric tons) per pile. Perform dynamic load testing to determine required blow count if piles are not driven to rock. If the plans state that the existing superstructure may be used instead of new construction, do not alter it to meet either the above width or strength requirements. Instead, move or dismantle and re-erect with sufficient care to avoid any reduction of capacity. If the superstructure has been restricted by posting to loads less than permitted by statute, move the posting signs to the temporary road, unless the superstructure is strengthened to a legal load capacity. If planning to use the existing superstructure on the temporary road, notify the Engineer at least 3 days before the superstructure is moved to allow the Department to establish a detour. Complete the bridge within 48 hours after traffic has been routed over the detour. 502.03 Maintenance. Maintain all portions of the temporary structure in good condition with respect to both safety and smoothness for travel as long as it is needed for maintenance of traffic. Satisfactorily maintain the channel and waterway opening. 502.04 Removal. If the temporary structure is no longer needed, take ownership and remove it from the site according to Item 202. 502.05 Basis of Payment. Payment is full compensation for erection, maintenance, performing dynamic load testing, and subsequent removal of temporary structures. The Department will pay for accepted quantities at the contract price as follows: Item Unit Description 502 Lump Sum Structure for Maintaining Traffic ITEM 503 EXCAVATION FOR STRUCTURES 503.01 Description 503.02 Classification 503.03 Cofferdams and Excavation Bracing 503.04 Protection for Excavation 503.05 Footings in Rock 503.06 Approval of Foundations 503.07 Disposal of Excavated Material 503.08 Backfill 503.09 Method of Measurement 503.10 Basis of Payment 290
291 503.01 503.01 Description. This work consists of designing cofferdams and excavation bracing, and excavating materials not removed under other items of work that must be removed to enable construction of bridges, and other structures. Included in this work are: A. constructing, maintaining, and subsequently removing cofferdams and excavation bracing; B. dewatering and backfilling the excavation; C. protecting the excavation against collapse; and D. disposing of materials not required or suitable for backfill. 503.02 Classification. Excavation is classified as unclassified excavation, unclassified excavation including rock (or shale), or rock (or shale) excavation. 503.03 Cofferdams and Excavation Bracing. This item includes the preparation of a working drawing according to 501.05 for all cofferdams and excavation bracing and the construction, maintenance, and subsequent removal of all cofferdams and excavation bracing. A cofferdam is an enclosure within a water environment constructed to allow dewatering for the purpose of creating a dry work environment. Excavation bracing is that required to safely support the sides of excavations, embankments, adjacent buildings, tracks, or other premises. Construct cofferdams and excavation bracing such that support members clear the top of the footings by at least 1 foot (0.3 m). If this is not practical, support members shall be structural steel and left it in place. If bracing is to be left in place and the ends would not be visible when the structure is completed, burn off the steel ends flush with the concrete surface. If ends would be visible, form a 6 inch (150 mm) deep recess around the steel embedment and remove the external portion of the embedment to provide at least 3 inches (75 mm) of clearance to the finished concrete face. Completely fill the resulting recess with concrete. Where water is not encountered, the Contractor may place excavation bracing at the plan dimension of the footing and use it as formwork for footing concrete. Leave this sheeting in place at least to the top of the footing, or properly separate it from the footing concrete so that it may be removed without damaging the concrete. Where water is encountered, and cofferdams are necessary, construct them practically watertight before excavating below water level. Make provisions outside the footing to drain, collect, and remove water. When placing concrete, keep the excavation dewatered until the concrete is above the prevailing water level. Effectively protect footing concrete from erosion. If using a concrete seal to stop the flow upward from the bottom of a cofferdam, place the seal below the planned footing and consider it as a part of the cofferdam. The Department will not pay for a seal unless it is shown on the plans. Unless otherwise shown in the plans, design and construct cofferdams to accommodate a water elevation 3 feet (1.0 m) above the ordinary high water mark shown on the plans. If the actual water elevation exceeds 3 feet (1.0 m) above the stated ordinary high water mark, the Department will reimburse the Contractor for any resulting damage to the work protected by the cofferdam provided the
- Page 245 and 246: TABLE 442.02-1 GYRATION LEVEL AND M
- Page 247 and 248: 241 442.06 442.06 Compaction. Cease
- Page 249 and 250: TABLE 443.03-2 MIX PROPERTIES 243 4
- Page 251 and 252: 2. Shot content (ASTM C612) Passing
- Page 253 and 254: 446.01 Description 446.02 JMF Field
- Page 255 and 256: 249 446.05 Fill core holes by the n
- Page 257 and 258: 448.01 Description 448.02 JMF Field
- Page 259 and 260: 450 RIGID PAVEMENT ITEM 451 REINFOR
- Page 261 and 262: 255 451.04 track speed, and the fre
- Page 263 and 264: 257 451.07 finishing the freshly pl
- Page 265 and 266: 451.08 Immediately before paving, r
- Page 267 and 268: 451.09 oil. Use an adequate bulkhea
- Page 269 and 270: 263 451.15 self propelled machines
- Page 271 and 272: 265 451.18 When zones of deficient
- Page 273 and 274: 267 452.04 directs in writing. The
- Page 275 and 276: 269 499.03 C. Concrete Classes. Usi
- Page 277 and 278: TABLE 499.03-4 CLASS HP CONCRETE 27
- Page 279 and 280: 273 499.04 However, do not change t
- Page 281 and 282: TABLE 499.04-2 OPTION 2 CONCRETE (C
- Page 283 and 284: 277 499.06 rigid pavement removal a
- Page 285 and 286: TABLE 499.08-1 EVERY BATCH TICKET N
- Page 287 and 288: 281 499.09 When approved by the Eng
- Page 289 and 290: 283 501.04 Prepare the shop drawing
- Page 291 and 292: 285 501.05 drawing at least 24 hour
- Page 293 and 294: 287 501.05 ii. Erection sequence fo
- Page 295: 289 502.01 Accompany all certified
- Page 299 and 300: 293 503.08 503.08 Backfill. Backfil
- Page 301 and 302: 295 504.01 provide the minimum cove
- Page 303 and 304: 297 506.03 limits of the footing 3
- Page 305 and 306: 299 506.04 506.04 Basis of Payment.
- Page 307 and 308: 507.05 Do not use a follower unless
- Page 309 and 310: 303 507.11 (75 mm) above the elevat
- Page 311 and 312: 305 508.03 To compensate for falsew
- Page 313 and 314: 509.09 Epoxy Coated Reinforcing Ste
- Page 315 and 316: TABLE 509.05-1M STANDARD BENDS Dime
- Page 317 and 318: 311 509.10 If repair is required, c
- Page 319 and 320: 511.03 Proportions 511.04 Mix Optio
- Page 321 and 322: 511.09 511.09 Slump. Within the slu
- Page 323 and 324: FIGURE 1 ACI 308-81 511.11 Slipform
- Page 325 and 326: 319 511.13 of principal stress and
- Page 327 and 328: 321 511.16 from 50 to 100 °F (10 t
- Page 329 and 330: 323 511.19 corners or edges, and ot
- Page 331 and 332: 325 511.21 expansion joints. Saw gr
- Page 333 and 334: 327 511.25 511.25 Basis of Payment.
- Page 335 and 336: 329 512.03 Do not mix or apply the
- Page 337 and 338: 2. Non-epoxy sealer. 331 512.03 a.
- Page 339 and 340: 333 512.04 markings according to Se
- Page 341 and 342: 335 512.06 Engineer with written in
- Page 343 and 344: 337 512.07 200 psi (1400kPa) max.,
- Page 345 and 346: 339 512.08 applying the waterproofi
502.03<br />
Design the temporary structure according to the AASHTO LRFD Bridge<br />
Design <strong>Specifications</strong> except that the design live loading, HL-93 may be reduced<br />
by 25 percent.<br />
Submit working drawings in accordance with 501.05.<br />
Drive piling to sufficient penetration to carry the superimposed loads according<br />
to Item 507, but not less than 24 tons (24 metric tons) per pile. Perform dynamic<br />
load testing to determine required blow count if piles are not driven to rock.<br />
If the plans state that the existing superstructure may be used instead <strong>of</strong> new<br />
construction, do not alter it to meet either the above width or strength<br />
requirements. Instead, move or dismantle <strong>and</strong> re-erect with sufficient care to avoid<br />
any reduction <strong>of</strong> capacity. If the superstructure has been restricted by posting to<br />
loads less than permitted by statute, move the posting signs to the temporary road,<br />
unless the superstructure is strengthened to a legal load capacity. If planning to<br />
use the existing superstructure on the temporary road, notify the Engineer at least 3<br />
days before the superstructure is moved to allow the <strong>Department</strong> to establish a<br />
detour. Complete the bridge within 48 hours after traffic has been routed over the<br />
detour.<br />
502.03 Maintenance. Maintain all portions <strong>of</strong> the temporary structure in good<br />
condition with respect to both safety <strong>and</strong> smoothness for travel as long as it is<br />
needed for maintenance <strong>of</strong> traffic. Satisfactorily maintain the channel <strong>and</strong><br />
waterway opening.<br />
502.04 Removal. If the temporary structure is no longer needed, take<br />
ownership <strong>and</strong> remove it from the site according to Item 202.<br />
502.05 Basis <strong>of</strong> Payment. Payment is full compensation for erection,<br />
maintenance, performing dynamic load testing, <strong>and</strong> subsequent removal <strong>of</strong><br />
temporary structures.<br />
The <strong>Department</strong> will pay for accepted quantities at the contract price as follows:<br />
Item Unit Description<br />
502 Lump Sum Structure for Maintaining Traffic<br />
ITEM 503 EXCAVATION FOR STRUCTURES<br />
503.01 Description<br />
503.02 Classification<br />
503.03 C<strong>of</strong>ferdams <strong>and</strong> Excavation Bracing<br />
503.04 Protection for Excavation<br />
503.05 Footings in Rock<br />
503.06 Approval <strong>of</strong> Foundations<br />
503.07 Disposal <strong>of</strong> Excavated <strong>Material</strong><br />
503.08 Backfill<br />
503.09 Method <strong>of</strong> Measurement<br />
503.10 Basis <strong>of</strong> Payment<br />
290