197<br />

403.08<br />

Table 403.08-1, but falls within the tolerances shown in Table 403.08-2, then the<br />

Lot is considered reasonably acceptable <strong>and</strong> may remain in place with payment at<br />

a reduced pay factor as show in Table 403.08-2.<br />

If the Range <strong>of</strong> the Lot acceptance tests for asphalt binder content or for any<br />

particular sieve, or sieves, exceeds the tolerance shown in Table 403.08-1, the<br />

<strong>Department</strong> will apply a pay factor <strong>of</strong> 0.95.<br />

TABLE 403.08-2 448 ACCEPTANCE SCHEDULE [1]<br />

Mix<br />

Property<br />

Asphalt<br />

Binder<br />

Content<br />

1/2 inch<br />

(12.5 mm)<br />

sieve<br />

No. 4<br />

(4.75 mm)<br />

sieve<br />

No. 8<br />

(2.36 mm)<br />

sieve<br />

Pay 2<br />

3<br />

4<br />

Factor Tests Tests Tests<br />

1.00 0 to 0.47 0 to 0.36 0 to 0.30<br />

0.98 0.48 to 0.54 0.37 to 0.42 0.31 to 0.35<br />

0.90 0.55 to 0.61 0.43 to 0.48 0.36 to 0.40<br />

0.80 0.62 to 0.68 0.49 to 0.54 0.41 to 0.45<br />

0.60 0.69 to 0.75 0.55 to 0.59 0.46 to 0.50<br />

[2] > 0.75 > 0.59 > 0.50<br />

1.00 0 to 8.5 0 to 6.9 0 to 6.0<br />

0.99 8.6 to 9.9 7.0 to 8.1 6.1 to 7.0<br />

0.97 10.0 to 11.3 8.2 to 9.2 7.1 to 8.0<br />

0.94 11.4 to 12.7 9.3 to 10.4 8.1 to 9.0<br />

0.90 12.8 to 14.1 10.5 to 11.5 9.1 to 10.0<br />

[3] > 14.1 > 11.5 > 10.0<br />

1.00 0 to 7.1 0 to 5.8 0 to 5.0<br />

0.99 7.2 to 8.5 5.9 to 6.9 5.1 to 6.0<br />

0.97 8.6 to 9.9 7.0 to 8.1 6.1 to 7.0<br />

0.94 10.0 to 11.3 8.2 to 9.2 7.1 to 8.0<br />

0.90 11.4 to 12.7 9.3 to 10.4 8.1 to 9.0<br />

[3] > 12.7 > 10.4 > 9.0<br />

1.00 0 to 5.7 0 to 4.6 0 to 4.0<br />

0.99 5.8 to 7.1 4.7 to 5.8 4.1 to 5.0<br />

0.97 7.2 to 8.5 5.9 to 6.9 5.1 to 6.0<br />

0.94 8.6 to 9.9 7.0 to 8.1 6.1 to 7.0<br />

0.90 10.0 to 11.3 8.2 to 9.2 7.1 to 8.0<br />

[3] > 11.3 > 9.2 > 8.0<br />

[1] Based on mean <strong>of</strong> Lot Acceptance tests from the JMF.<br />

[2] Remove <strong>and</strong> replace material<br />

[3] Engineer will determine if the material may remain in place. Pay factor<br />

for material allowed to remain in place is 0.70.